DN01142 (WBS 50986.3.15) HS-2414N GRADING, DRAINING, AND PAVING ON US 23/441 AT SR 1320 (GREENS CREEK ROAD) IN JACKSON COUNTY Addendum 1

Location: North Carolina
Posted: Jun 18, 2026
Due: Jun 23, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
  • DN01142 (WBS 50986.3.15)
    POC
    DN01142 (WBS 50986.3.15) HS-2414N GRADING, DRAINING, AND PAVING ON US 23/441 AT SR 1320 (GREENS CREEK ROAD) IN JACKSON COUNTY
  • Attachment Preview

    This electronic collection of documents is provided
    for the convenience of the user
    and is Not a Cer tified Document -
    The documents contained herein were originally issued
    and sealed by the individuals whose names and license
    numbers appear on each page, on the dates appearing
    with their signature on that page.
    This file or an individual page
    shall not be considered a cer tified document.

    su4m00m9it 137 6 non naC acktown .7 0 15 S 0 kyli 0 f . t 25 R d. Le athe rwo . o 6 d 1 .50 1364Rd. Old .36 Rd. 1 .15 56 7 . 50 C amp Rd M 1 . 377 Ma c k Gap Blac s k 2u 9m M 2m0 o i u t ntain .43 1 3 .06 1 . 6 1 .1 7 7 5 4 0 R y d. pVa p l . le a y 1 0 H 61 1 5 5 0 0 2 1 1.1 3 1360 .dR Macktown 1365 Dills Gap 1359 .50 Grasshopper P ottsC Franklin Rd. 149 6 . o 2 m 1 munityRd. .23 .50 Old.231360 Butte #1 Gap . 44 1375 Brooks 1365 % .4 4 7 2431 Old 1 G 3 ras 6 s .1 h 6 o 7 .14 pperRd. C reek (1 1 6 2.01 .8 5 Branch 1377 Rd. Savannah U S 441.28 H w y . .36 1322 13 Old 68 .22 Savannah (116 d..65 .80 .0 2 1 H a 3 ll 22 R 1375 Green Creek Green Rd. 1320 .401374 Rd. .6 R 5 d. R .1 d. 4 1370 Greens.97 Cre C ek reek .52 .13 1561 Li 1 ttle 321 Savannah .42 Rd. 1.52 Green .dR Rd 1 . .35 371 .17 1560 Cabe .38 131 Rd 9 . END PROJE Branch 1 C .06 T .dR Fork Billy Cove 157 .2 85 .12 .14 Calvery Rd. su2m93m9it Savan F na ra h dy Cove Dam Bla ke Branch Savannah .41 1 Rd. 475 .17 Bradley .901 C 3 hur 1 ch 8 B lake .401559 Rd. BEGIN PROJECT .28 R d. .25 Ea st .76 Fork Rd. 13 Woodrow 17 Deit . z 25 Rd. 1 13 S 1 a 1 vannah 13 1 3 Deitz .38 Rd. 1316 Creek Rd. 1.00 Creek .90 0.23 Rd. Cabe 1313
    .27 Deitz VICINITY MAP (NTS)
    5098619 5098619 P.E. CONSTRUCTION

    SHEET TOTAL STATE STATE PROJECT REFERENCE NO.
    NO. SHEETS
    N.C. 1
    STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION 50986.1.15 5098619 P.E.
    50986.3.15 5098619 CONSTRUCTION
    JACKSON COUNTY
    US 23/441 AT SR1320 (GREENS CREEK ROAD)
    GRADING, DRAINING, AND PAVING
    DOCUMENT NOT CONSIDERED FINAL
    UNLESS ALL SIGNATURES COMPLETED
    Prepared in the Office of:
    GRAPHIC SCALES PROJECT LENGTH
    DIVISION OF HIGHWAYS
    50 25 0 50 100
    2024 STANDARD SPECIFICATIONS
    JAMES E HOLLINGSWORTH, PE
    RIGHT OF WAY DATE: PROJECT ENGINEER
    N/A
    PROFILE (HORIZONTAL)
    LETTING DATE:
    JUNE 23, 2026
    P.E.
    SIGNATURE:
    24110ND
    01/16/24
    STATE OF NORTH CAROLINA
    HS-2414N
    DIVISION OF HIGHWAYS
    LOCATION:
    TYPE OF WORK:
    HYDRAULICS ENGINEER
    253 WEBSTER DR., Sylva NC, 28779
    PLANS
    ROADWAY DESIGN ENGINEER
    PROFILE (VERTICAL)
    N4142-SH:TCEJORP
    PIT
    :TCARTNOC
    See Sheet 1A For Index of Sheets
    .40 1360 1359 Mas . h 3 b0 urn
    su4m00m9it 137
    .
    6
    50
    non
    C
    naC
    amp Rd M 1 .
    acktown
    377 Ma
    .7
    c
    0
    k Gap Blac s k 2u 9m M 2m0 o i u t ntain
    15 S 0 kyli 0 f . t
    .43
    25 R
    1
    d.
    3 .06 1 . 6 1 .1 7 7 5 4 0 R y d. pVa p l . le a y 1 0 H 61 1 5
    Le
    5 0
    athe
    0 2
    rwo .
    1
    o 6 d 1 .50 1364Rd. Old .36 Rd. 1 .15 56
    1.1
    7
    3 1360 .dR
    Macktown
    .50
    1365 Dills Gap 1359
    Grasshopper
    Rd. 149
    P
    6
    ottsC
    . o 2 m 1 munityRd. .23
    Franklin
    .50 Old.231360 Butte
    #1
    1375 Brooks
    Gap
    2.01
    1365 % .4 4 7 2431 Old 1 G 3 ras 6 s .1 h 6 o 7 .14 pperRd.
    .
    C
    44
    reek (1
    .8
    1
    5
    6
    Branch
    .80
    1377 Rd. Savannah
    13 Old 68
    .0
    U
    2
    S 441.28
    .22
    1
    H
    H
    w
    a 3
    y
    ll
    .
    22
    Savannah (116
    R
    .36
    d..65
    1322
    1375
    Green Creek
    Green Rd. 1320
    .401374 Rd.
    .6 R 5 d. R .1 d. 4 1370
    Green
    Greens.97 Cre C ek reek .52 .13 1561 Li 1 ttle 321 Savannah .42 Rd.
    .dR
    1.52
    Rd 1 . .35 371 .17 1560 Cabe .38 131 Rd 9 . END PROJE Branch 1 C .06 T .dR
    Fork Billy
    .41
    Cove
    1 Rd. 475
    157 .2 85 .12
    .17
    .14
    Bradley
    Calvery
    .901 C 3 hur 1 ch 8
    Rd. su2m93m9it Savan F na ra h dy Cove Dam Bla
    B
    ke
    lake
    Branch Savannah
    .401559
    Rd.
    BEGIN PROJECT
    .28
    13
    R
    S
    d.
    1 a 1 vannah
    .25
    13
    Ea
    1
    st
    3
    .76 Fork Rd. 13 Woodrow 17 Deit . z 25 Rd.
    Deitz .38 Rd. 1316 Creek Rd.
    1324
    1.00
    Creek .90
    Rd. Cabe 131 . 3 27
    0.23
    Deitz
    VICINITY MAP (NTS)
    4
    S
    R
    1
    3
    2
    0
    (
    G
    R
    E
    E 5
    N
    S
    C
    R
    E
    E
    4 1 K
    BEGIN PROJECT HS-2414N /4
    2 3 R
    S D
    -L- STA1 0+84.24
    -L-
    U )
    TO
    FRANKLIN
    TO
    DILLSBO
    RO
    END PROJECT HS-2414N
    -L- STA2 7+74.07
    N
    O R
    R
    T
    O
    H
    FE
    C
    S
    A
    S
    R
    IO
    O
    N
    L IN
    A
    P A
    L
    J
    SEAL III
    A 051774
    M H
    E S ENGINE E R O R T
    E. S W
    HOLLING
    P.E.
    LENGTH OF ROADWAY TIP PROJECT HS-2414N = 0.320 MILES SIGNATURE:
    50 25 0 50 100
    TOTAL LENGTH OF TIP PROJECT HS-2414N = 0.320 MILES
    JAMES E HOLLINGSWORTH, PE N
    O R
    R
    T
    O
    H
    FE
    C
    S
    A
    S
    R
    IO
    O
    N
    L IN
    A
    P A
    PROJECT DESIGN ENGINEER
    J
    SEAL L III
    10 5 0 10 20 A 051774
    M H
    E S ENGINE E R O R T
    E. S W
    HOLLING

    HHSS--22441144NN 11AA IINNDDEEXX OOFF SSHHEEEETTSS SSHHEEEETT NNUUMMBBEERR SSHHEEEETT 11 TTIITTLLEE SSHHEEEETT 11AA IINNDDEEXX OOFF SSHHEEEETTSS,, GGEENNEERRAALL NNOOTTEESS,, AANNDD SSTTAANNDDAARRDD DDRRAAWWIINNGGSS 11BB CCOONNVVEENNTTIIOONNAALL SSYYMMBBOOLLSS 22AA--11 TTHHRRUU 22AA--22 PPAAVVEEMMEENNTT SSCCHHEEDDUULLEE AANNDD TTYYPPIICCAALL SSEECCTTIIOONNSS EFF. 08-11-2025 EFF. 08-11-2025 22BB--11 RROOAADDWWAAYY DDEETTAAIILLSS REV . 11-26-2025 REV. 11-26-2025 2024 ROADWAY ENGLISH STANDARD DRAWINGS 2024 ROADWAY ENGLISH STANDARD DRAWINGS 22CC--11 TTHHRRUU 22CC--22 SSPPEECCIIAALL DDEETTAAIILLSS The following Roadway Standards as appear in "Roadway Standard Drawings" Contracts Standards and Development Unit - The following Roadway Standards as appear in "Roadway Standard Drawings" Contracts Standards and Development Unit - 33BB--11 RROOAADDWWAAYY SSUUMMMMAARRIIEESS N. C. Department of Transportation - Raleigh, N. C., Dated January 16, 2024 are applicable to this project N. C. Department of Transportation - Raleigh, N. C., Dated January 16, 2024 are applicable to this project and by reference hereby are considered a part of these plans: 44 TTHHRRUU 66 PPLLAANN AANNDD PPRROOFFIILLEE SSHHEEEETTSS and by reference hereby are considered a part of these plans: RR//WW--0022CC--11 TTHHRRUU RR//WW--0022CC--22 SSUURRVVEEYY CCOONNTTRROOLL SSHHEEEETTSS STD.NO. TITLE STD.NO. TITLE DIVISION 2 - EARTHWORK DIVISION 2 - EARTHWORK PPMMPP--11 TTHHRRUU PPMMPP--55 PPAAVVEEMMEENNTT MMAARRKKIINNGG PPLLAANNSS 225.01 Guide for Grading Subgrade - Interstate and Freeway 225.01 Guide for Grading Subgrade - Interstate and Freeway 225.03 Deceleration and Acceleration Lanes 225.03 Deceleration and Acceleration Lanes EECC--11 TTHHRRUU EECC--55 EERROOSSIIOONN CCOONNTTRROOLL PPLLAANNSS 225.05 Method of Obtaining Superelevation - Divided Highways 225.05 Method of Obtaining Superelevation - Divided Highways SSIIGGNN--11 TTHHRRUU SSIIGGNN--55 SSIIGGNNIINNGG PPLLAANNSS 225.06 Method of Grading S 225.06 Method of Grading Sight Distance at Intersections ight Distance at Intersections DIVISION 3 - PIPE CULVERTS DIVISION 3 - PIPE CULVERTS XX--11 TTHHRRUU XX--1111 CCRROOSSSS--SSEECCTTIIOONNSS 300.01 Method of Pipe Installation (Use Details in Lieu of Standards for Sheets 1 and 2 of 2) 300.01 Method of Pipe Installation (Use Details in Lieu of Standards for Sheets 1 and 2 of 2) DIVISION 5 - SUBGRADE, BASES AND SHOULDERS DIVISION 5 - SUBGRADE, BASES AND SHOULDERS 560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I 560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I DIVISION 6 - ASPHALT BASES AND PAVEMENTS DIVISION 6 - ASPHALT BASES AND PAVEMENTS 654.01 Pavement Repairs 654.01 Pavement Repairs DIVISION 8 - INCIDENTALS DIVISION 8 - INCIDENTALS 840.18 Concrete Grated Drop Inlet Type 'B' - 12" thru 36" Pipe 840.18 Concrete Grated Drop Inlet Type 'B' - 12" thru 36" Pipe 840.22 Frames and Wide Slot Sag Grates 840.22 Frames and Wide Slot Sag Grates 840.27 Brick Grated Drop Inlet Type 'B' - 12" thru 36" Pipe 840.27 Brick Grated Drop Inlet Type 'B' - 12" thru 36" Pipe 840.45 Precast Drainage Structure 840.45 Precast Drainage Structure GENERAL NOTES: 2024 SPECIFICATIONS GENERAL NOTES: 2024 SPECIFICATIONS 840.72 Pipe Collar 840.72 Pipe Collar EFFECTIVE: 01-16-2024 EFFECTIVE: 01-16-2024 852.01 Concrete Islands 852.01 Concrete Islands REVISED: REVISED: DDIIVVIISSIIOONN 1111 -- WWOORRKK ZZOONNEE TTRRAAFFFFIICC CCOONNTTRROOLL 11110011..0011 WWoorrkk ZZoonnee AAddvvaannccee WWaarrnniinngg SSiiggnnss GRADING AND SURFACING OR RESURFACING AND WIDENING: GRADING AND SURFACING OR RESURFACING AND WIDENING: 11110011..0022 TTeemmppoorraarryy LLaannee CClloossuurreess 11110011..0033 TTeemmppoorraarryy RRooaadd CClloossuurreess THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED 11110011..0044 TTeemmppoorraarryy SShhoouullddeerr CClloossuurreess THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED 11110011..0055 WWoorrkk ZZoonnee VVeehhiiccllee AAcccceesssseess SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES 11110011..0066 WWaarrnniinngg SSiiggnnss ffoorr BBllaassttiinngg ZZoonneess ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT 11110011..1111 TTrraaffffiicc CCoonnttrrooll DDeessiiggnn TTaabblleess ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE 11111100..0011 SSttaattiioonnaarryy WWoorrkk ZZoonnee SSiiggnnss PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A 11111100..0022 PPoorrttaabbllee WWoorrkk ZZoonnee SSiiggnnss PROPE PROPER TIE-IN. R TIE-IN. 11111155..0011 FFllaasshhiinngg AArrrrooww BBooaarrddss 11113300..0011 DDrruummss 11113355..0011 CCoonneess SHOULDER CONSTRUCTION: SHOULDER CONSTRUCTION: 11114455..0011 BBaarrrriiccaaddeess -- TTyyppee IIIIII 11115500..0011 FFllaaggggeerrss ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF 11116600..0011 TTeemmppoorraarryy CCrraasshh CCuusshhiioonn -- RReefflleeccttiivvee EEnndd TTrreeaattmmeenntt SUPERELEVATED CURVES SHALL B SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01 E IN ACCORDANCE WITH STD. NO. 560.01 11116655..0011 TTrruucckk MMoouunntteedd AAtttteennuuaattoorr 11117700..0011 PPoorrttaabbllee CCoonnccrreettee BBaarrrriieerr STAGING 11118800..0011 SSkkiinnnnyy DDrruummss STAGING PHASE 1: COMPLETE STEP 1 WITHIN 63 CALENDAR DAYS. SEE INTERMEDIATE CONTRACT TIME 1 AND LIQUIDATED DAMAGES. STEP 1: CONSTRUCT TURN LANE AND OTHER MEDIAN IMPROVEMENTS FROM -L- STATION 10+84.24 THRU 16+32.12. COMPLETE STEP 2 WITHIN 28 CALENDAR DAYS. SEE INTERMEDIATE CONTRACT TIME 2 AND LIQUIDATED DAMAGES. CCPSCSCPTTHHOOOOEEMMMNAAPPSPPPSS 12T LLLEE :: R EEE C C-21UTTTLOO::EEEC -NN STPSSSSTH TTTATAEEARRLPPTSUUL IE21C OCW WW2TTN O W IIT BTT1RUIU0HHTKR+LIIH 8NNNFBI4R N 26L.O2O83 A24U MCC8N TT AAC E H-LLLL AAROEE-L NUCNNSEDT ADDN1A 6TAAOD+TIRRTAO3IH OR2DDNE. NAA1 DSR2 YYA2T .M4SSAY+..EST 5SS.DI7 EEOS.IEE6EAN2 EIIN NN-T L IITTHNM- EETRSPRRETURMMRA O2MTEE7VDDI+EOE7IIDMAAN4I.TTA 0E1EE7TN0. +ECCT9 SOOC5 ONN.F1RNTT9O RRTTMAARHACCRTTCU TTT 1 IIT3MMI+MEE79 E21. 03AA2 ANN.NDDD LL IILQQIQUUUIIDDIDAAATTEETDDED DD DAAAMMMAAAGGGEESSE..S. STEP 2: CONSTRUCT BULB OUT LOCATION STATION -L- STATION 10+95.19 THRU 13+79.02. PHASE 2: COMPLETE PHASE 2 WITHIN 28 CALENDAR DAYS. SEE INTERMEDIATE CONTRACT TIME 3 AND LIQUIDATED DAMAGES. CONSTRUCT ALL WORK FROM -L- STATION 24+57.62 THRU 27+74.07. HHSS--22441144NN
    11AA

    1111//1155//2233
    HHSS--22441144NN
    11AA
    IINNDDEEXX OOFF SSHHEEEETTSS
    SSHHEEEETT NNUUMMBBEERR SSHHEEEETT
    11 TTIITTLLEE SSHHEEEETT
    11AA IINNDDEEXX OOFF SSHHEEEETTSS,, GGEENNEERRAALL NNOOTTEESS,, AANNDD SSTTAANNDDAARRDD DDRRAAWWIINNGGSS
    11BB CCOONNVVEENNTTIIOONNAALL SSYYMMBBOOLLSS
    22AA--11 TTHHRRUU 22AA--22 PPAAVVEEMMEENNTT SSCCHHEEDDUULLEE AANNDD TTYYPPIICCAALL SSEECCTTIIOONNSS
    EFF. 08-11-2025
    EFF. 08-11-2025
    22BB--11 RROOAADDWWAAYY DDEETTAAIILLSS REV . 11-26-2025 REV. 11-26-2025
    2024 ROADWAY ENGLISH STANDARD DRAWINGS
    2024 ROADWAY ENGLISH STANDARD DRAWINGS
    22CC--11 TTHHRRUU 22CC--22 SSPPEECCIIAALL DDEETTAAIILLSS
    The following Roadway Standards as appear in "Roadway Standard Drawings" Contracts Standards and Development Unit -
    The following Roadway Standards as appear in "Roadway Standard Drawings" Contracts Standards and Development Unit -
    33BB--11 RROOAADDWWAAYY SSUUMMMMAARRIIEESS
    N. C. Department of Transportation - Raleigh, N. C., Dated January 16, 2024 are applicable to this project
    N. C. Department of Transportation - Raleigh, N. C., Dated January 16, 2024 are applicable to this project
    and by reference hereby are considered a part of these plans:
    44 TTHHRRUU 66 PPLLAANN AANNDD PPRROOFFIILLEE SSHHEEEETTSS and by reference hereby are considered a part of these plans:
    RR//WW--0022CC--11 TTHHRRUU RR//WW--0022CC--22 SSUURRVVEEYY CCOONNTTRROOLL SSHHEEEETTSS STD.NO. TITLE
    STD.NO. TITLE
    DIVISION 2 - EARTHWORK
    DIVISION 2 - EARTHWORK
    PPMMPP--11 TTHHRRUU PPMMPP--55 PPAAVVEEMMEENNTT MMAARRKKIINNGG PPLLAANNSS
    225.01 Guide for Grading Subgrade - Interstate and Freeway
    225.01 Guide for Grading Subgrade - Interstate and Freeway
    225.03 Deceleration and Acceleration Lanes
    225.03 Deceleration and Acceleration Lanes
    EECC--11 TTHHRRUU EECC--55 EERROOSSIIOONN CCOONNTTRROOLL PPLLAANNSS
    225.05 Method of Obtaining Superelevation - Divided Highways
    225.05 Method of Obtaining Superelevation - Divided Highways
    SSIIGGNN--11 TTHHRRUU SSIIGGNN--55 SSIIGGNNIINNGG PPLLAANNSS 225.06 Method of Grading S 225.06 Method of Grading Sight Distance at Intersections ight Distance at Intersections
    DIVISION 3 - PIPE CULVERTS
    DIVISION 3 - PIPE CULVERTS
    XX--11 TTHHRRUU XX--1111 CCRROOSSSS--SSEECCTTIIOONNSS
    300.01 Method of Pipe Installation (Use Details in Lieu of Standards for Sheets 1 and 2 of 2)
    300.01 Method of Pipe Installation (Use Details in Lieu of Standards for Sheets 1 and 2 of 2)
    DIVISION 5 - SUBGRADE, BASES AND SHOULDERS
    DIVISION 5 - SUBGRADE, BASES AND SHOULDERS
    560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I
    560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I
    DIVISION 6 - ASPHALT BASES AND PAVEMENTS
    DIVISION 6 - ASPHALT BASES AND PAVEMENTS
    654.01 Pavement Repairs
    654.01 Pavement Repairs
    DIVISION 8 - INCIDENTALS
    DIVISION 8 - INCIDENTALS
    840.18 Concrete Grated Drop Inlet Type 'B' - 12" thru 36" Pipe
    840.18 Concrete Grated Drop Inlet Type 'B' - 12" thru 36" Pipe
    840.22 Frames and Wide Slot Sag Grates
    840.22 Frames and Wide Slot Sag Grates
    840.27 Brick Grated Drop Inlet Type 'B' - 12" thru 36" Pipe
    840.27 Brick Grated Drop Inlet Type 'B' - 12" thru 36" Pipe
    840.45 Precast Drainage Structure
    840.45 Precast Drainage Structure
    GENERAL NOTES: 2024 SPECIFICATIONS
    GENERAL NOTES: 2024 SPECIFICATIONS
    840.72 Pipe Collar
    840.72 Pipe Collar
    EFFECTIVE: 01-16-2024
    EFFECTIVE: 01-16-2024
    852.01 Concrete Islands
    852.01 Concrete Islands
    REVISED:
    REVISED:
    DDIIVVIISSIIOONN 1111 -- WWOORRKK ZZOONNEE TTRRAAFFFFIICC CCOONNTTRROOLL
    11110011..0011 WWoorrkk ZZoonnee AAddvvaannccee WWaarrnniinngg SSiiggnnss
    GRADING AND SURFACING OR RESURFACING AND WIDENING:
    GRADING AND SURFACING OR RESURFACING AND WIDENING: 11110011..0022 TTeemmppoorraarryy LLaannee CClloossuurreess
    11110011..0033 TTeemmppoorraarryy RRooaadd CClloossuurreess
    THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED 11110011..0044 TTeemmppoorraarryy SShhoouullddeerr CClloossuurreess
    THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED
    11110011..0055 WWoorrkk ZZoonnee VVeehhiiccllee AAcccceesssseess
    SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES
    SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES
    11110011..0066 WWaarrnniinngg SSiiggnnss ffoorr BBllaassttiinngg ZZoonneess
    ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT
    ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT
    11110011..1111 TTrraaffffiicc CCoonnttrrooll DDeessiiggnn TTaabblleess
    ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE
    ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE
    11111100..0011 SSttaattiioonnaarryy WWoorrkk ZZoonnee SSiiggnnss
    PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A
    PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A 11111100..0022 PPoorrttaabbllee WWoorrkk ZZoonnee SSiiggnnss
    PROPE PROPER TIE-IN. R TIE-IN. 11111155..0011 FFllaasshhiinngg AArrrrooww BBooaarrddss
    11113300..0011 DDrruummss
    11113355..0011 CCoonneess
    SHOULDER CONSTRUCTION:
    SHOULDER CONSTRUCTION:
    11114455..0011 BBaarrrriiccaaddeess -- TTyyppee IIIIII
    11115500..0011 FFllaaggggeerrss
    ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF
    ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF 11116600..0011 TTeemmppoorraarryy CCrraasshh CCuusshhiioonn -- RReefflleeccttiivvee EEnndd TTrreeaattmmeenntt
    SUPERELEVATED CURVES SHALL B SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01 E IN ACCORDANCE WITH STD. NO. 560.01 11116655..0011 TTrruucckk MMoouunntteedd AAtttteennuuaattoorr
    11117700..0011 PPoorrttaabbllee CCoonnccrreettee BBaarrrriieerr
    STAGING 11118800..0011 SSkkiinnnnyy DDrruummss
    STAGING
    PHASE 1:
    COMPLETE STEP 1 WITHIN 63 CALENDAR DAYS. SEE INTERMEDIATE CONTRACT TIME 1 AND LIQUIDATED DAMAGES.
    STEP 1: CONSTRUCT TURN LANE AND OTHER MEDIAN IMPROVEMENTS FROM
    -L- STATION 10+84.24 THRU 16+32.12.
    COMPLETE STEP 2 WITHIN 28 CALENDAR DAYS. SEE INTERMEDIATE CONTRACT TIME 2 AND LIQUIDATED DAMAGES.
    CCPSCSCPTTHHOOOOEEMMMNAAPPSPPPSS 12T LLLEE :: R EEE C C-21UTTTLOO::EEEC -NN STPSSSSTH TTTATAEEARRLPPTSUUL IE21C OCW WW2TTN O W IIT BTT1RUIU0HHTKR+LIIH 8NNNFBI4R N 26L.O2O83 A24U MCC8N TT AAC E H-LLLL AAROEE-L NUCNNSEDT ADDN1A 6TAAOD+TIRRTAO3IH OR2DDNE. NAA1 DSR2 YYA2T .M4SSAY+..EST 5SS.DI7 EEOS.IEE6EAN2 EIIN NN-T L IITTHNM- EETRSPRRETURMMRA O2MTEE7VDDI+EOE7IIDMAAN4I.TTA 0E1EE7TN0. +ECCT9 SOOC5 ONN.F1RNTT9O RRTTMAARHACCRTTCU TTT 1 IIT3MMI+MEE79 E21. 03AA2 ANN.NDDD LL IILQQIQUUUIIDDIDAAATTEETDDED DD DAAAMMMAAAGGGEESSE..S.
    STEP 2: CONSTRUCT BULB OUT LOCATION STATION -L- STATION 10+95.19 THRU 13+79.02.
    PHASE 2:
    COMPLETE PHASE 2 WITHIN 28 CALENDAR DAYS. SEE INTERMEDIATE CONTRACT TIME 3 AND LIQUIDATED DAMAGES.
    CONSTRUCT ALL WORK FROM -L- STATION 24+57.62 THRU 27+74.07.
    DOT/ext-dcrivenbark1-4/27/2026

    HS-2414N Note: Not to Scale STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS 1B CONVENTIONAL PLAN SHEET SYMBOLS BOUNDARIES AND PROPERTY: RAILROADS: WATER: Water Manhole State Line Standard Gauge Hedge CSX TRANSPORTATION Water Meter County Line RR Signal Milepost Woods Line MILEPOST 35 Water Valve Township Line Switch Orchard SWITCH Water Hydrant City Line RR Abandoned Vineyard Vineyard U/G Water Line Test Hole (SUE - LOS A)* Reservation Line RR Dismantled EXISTING STRUCTURES: U/G Water Line (SUE - LOS B)* W Property Line RIGHT OF WAY & PROJECT CONTROL: MAJOR: U/G Water Line (SUE - LOS C)* W Existing Iron Pin (EIP) Primary Horiz Control Point Bridge, Tunnel or Box Culvert CONC U/G Water Line (SUE - LOS D)* W Computed Property Corner Primary Horiz and Vert Control Point Bridge Wing Wall, Head Wall and End Wall CONC WW A/G Water Above Ground Water Line Existing Concrete Monument (ECM) Secondary Horiz and Vert Control Point MINOR: Head and End Wall TV: Vertical Benchmark CONC HW Parcel / Sequence Number 123 TV Pedestal Existing Right of Way Monument Pipe Culvert Existing Fence Line TV Tower Proposed Right of Way Monument Footbridge v v Proposed Woven Wire Fence (Rebar and Cap) U/G TV Cable Hand Hole Drainage Box: Catch Basin, DI or JB CB Proposed Chain Link Fence Proposed Right of Way Monument U/G TV Test Hole (SUE - LOS A)* Paved Ditch Gutter (Concrete) Proposed Barbed Wire Fence Existing Permanent Easement Monument Storm Sewer Manhole U/G TV Cable (SUE - LOS B)* TV Existing Wetland Boundary WLB Proposed Permanent Easement Monument U/G TV Cable (SUE - LOS C)* TV Storm Sewer S Proposed Wetland Boundary WLB (Rebar and Cap) U/G TV Cable (SUE - LOS D)* TV Existing Endangered Animal Boundary EAB Existing C/A Monument UTILITIES: * SUE - Subsurface Utility Engineering U/G Fiber Optic Cable (SUE - LOS B)* TV FO LOS - Level of Service - A,B,C or D (Accuracy) Existing Endangered Plant Boundary EPB Proposed C/A Monument (Rebar and Cap) POWER: U/G Fiber Optic Cable (SUE - LOS C)* TV FO Existing Historic Property Boundary HPB Proposed C/A Monument (Concrete) Existing Power Pole U/G Fiber Optic Cable (SUE - LOS D)* TV FO Existing Right of Way Line Known Contamination Area: Soil Proposed Power Pole R GAS: Proposed Right of Way Line Potential Contamination Area: Soil W Existing Joint Use Pole Gas Valve Existing Control of Access Line Known Contamination Area: Water Proposed Joint Use Pole Gas Meter Proposed Control of Access Line C Potential Contamination Area: Water A Power Manhole U/G Gas Line Test Hole (SUE - LOS A)* Proposed ROW and CA Line RW Contaminated Site: Known or Potential CA Power Line Tower U/G Gas Line (SUE - LOS B)* G Existing Easement Line E BUILDINGS AND OTHER CULTURE: Power Transformer U/G Gas Line (SUE - LOS C)* G Proposed Temporary Construction Easement E Gas Pump Vent or U/G Tank Cap U/G Power Cable Hand Hole U/G Gas Line (SUE - LOS D)* G Permanent Construction Easement PE Sign H-Frame Pole Above Ground Gas Line A/G Gas Proposed Temporary Drainage Easement TDE Well U/G Power Line Test Hole (SUE - LOS A)* SANITARY SEWER: Proposed Permanent Drainage Easement PDE Small Mine U/G Power Line (SUE - LOS B)* P Sanitary Sewer Manhole Proposed Permanent Drainage/Utility Easement DUE Foundation U/G Power Line (SUE - LOS C)* P Sanitary Sewer Cleanout Proposed Permanent Utility Easement PUE Area Outline U/G Power Line (SUE - LOS D)* P U/G Sanitary Sewer Line SS Proposed Temporary Utility Easement TUE Cemetery TELEPHONE: Above Ground Sanitary Sewer A/G Sanitary Sewer Proposed Aerial Utility Easement AUE Building Existing Telephone Pole SS Force Main Line Test Hole (SUE - LOS A)* ROADS AND RELATED FEATURES: School Proposed Telephone Pole SS Force Main Line (SUE - LOS B)* FSS Existing Edge of Pavement Church Telephone Manhole SS Force Main Line (SUE - LOS C)* FSS Existing Curb Dam Telephone Pedestal SS Force Main Line (SUE - LOS D)* FSS C Proposed Slope Stakes Cut HYDROLOGY: Telephone Cell Tower MISCELLANEOUS: F Proposed Slope Stakes Fill Stream or Body of Water U/G Telephone Cable Hand Hole Utility Pole Hydro, Pool or Reservoir Proposed Curb Ramp CR U/G Telephone Test Hole (SUE - LOS A)* Utility Pole with Base Existing Metal Guardrail U/G Telephone Cable (SUE - LOS B)* Jurisdictional Stream T Utility Located Object JS Buffer Zone 1 Proposed Guardrail U/G Telephone Cable (SUE - LOS C)* T Utility Traffic Signal Box BZ 1 Buffer Zone 2 BZ 2 Existing Cable Guiderail U/G Telephone Cable (SUE - LOS D)* T Utility Unknown U/G Line (SUE - LOS B)* ?UTL Flow Arrow Proposed Cable Guiderail U/G Telephone Conduit (SUE - LOS B)* TC U/G Tank; Water, Gas, Oil Disappearing Stream v Equality Symbol U/G Telephone Conduit (SUE - LOS C)* TC Underground Storage Tank, Approx. Loc. UST Spring Pavement Removal U/G Telephone Conduit (SUE - LOS D)* TC A/G Tank; Water, Gas, Oil Wetland VEGETATION: U/G Fiber Optics Cable (SUE - LOS B)* T FO Geoenvironmental Boring Proposed Lateral, Tail, Head Ditch Single Tree U/G Fiber Optics Cable (SUE - LOS C)* T FO Abandoned According to Utility Records AATUR FLOW False Sump Single Shrub U/G Fiber Optics Cable (SUE - LOS D)* T FO End of Information E.O.I. HS-2414N
    1B

    05/29/25
    HS-2414N
    Note: Not to Scale STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS
    1B
    CONVENTIONAL PLAN SHEET SYMBOLS
    BOUNDARIES AND PROPERTY: RAILROADS: WATER:
    Water Manhole
    State Line Standard Gauge Hedge
    CSX TRANSPORTATION
    Water Meter
    County Line RR Signal Milepost Woods Line
    MILEPOST 35
    Water Valve
    Township Line Switch Orchard
    SWITCH
    Water Hydrant
    City Line RR Abandoned Vineyard Vineyard
    U/G Water Line Test Hole (SUE - LOS A)*
    Reservation Line RR Dismantled EXISTING STRUCTURES:
    U/G Water Line (SUE - LOS B)* W
    Property Line RIGHT OF WAY & PROJECT CONTROL:
    MAJOR:
    U/G Water Line (SUE - LOS C)* W
    Existing Iron Pin (EIP) Primary Horiz Control Point
    Bridge, Tunnel or Box Culvert CONC
    U/G Water Line (SUE - LOS D)* W
    Computed Property Corner Primary Horiz and Vert Control Point
    Bridge Wing Wall, Head Wall and End Wall CONC WW
    A/G Water
    Above Ground Water Line
    Existing Concrete Monument (ECM) Secondary Horiz and Vert Control Point MINOR:
    Head and End Wall TV:
    Vertical Benchmark CONC HW
    Parcel / Sequence Number 123
    TV Pedestal
    Existing Right of Way Monument Pipe Culvert
    Existing Fence Line
    TV Tower
    Proposed Right of Way Monument Footbridge v v
    Proposed Woven Wire Fence
    (Rebar and Cap)
    U/G TV Cable Hand Hole
    Drainage Box: Catch Basin, DI or JB CB
    Proposed Chain Link Fence
    Proposed Right of Way Monument
    U/G TV Test Hole (SUE - LOS A)*
    Paved Ditch Gutter
    (Concrete)
    Proposed Barbed Wire Fence
    Existing Permanent Easement Monument Storm Sewer Manhole U/G TV Cable (SUE - LOS B)* TV
    Existing Wetland Boundary WLB
    Proposed Permanent Easement Monument U/G TV Cable (SUE - LOS C)* TV
    Storm Sewer S
    Proposed Wetland Boundary WLB (Rebar and Cap)
    U/G TV Cable (SUE - LOS D)* TV
    Existing Endangered Animal Boundary EAB Existing C/A Monument UTILITIES: * SUE - Subsurface Utility Engineering
    U/G Fiber Optic Cable (SUE - LOS B)* TV FO
    LOS - Level of Service - A,B,C or D (Accuracy)
    Existing Endangered Plant Boundary EPB Proposed C/A Monument (Rebar and Cap)
    POWER:
    U/G Fiber Optic Cable (SUE - LOS C)* TV FO
    Existing Historic Property Boundary HPB Proposed C/A Monument (Concrete)
    Existing Power Pole
    U/G Fiber Optic Cable (SUE - LOS D)* TV FO
    Existing Right of Way Line
    Known Contamination Area: Soil
    Proposed Power Pole
    R GAS:
    Proposed Right of Way Line
    Potential Contamination Area: Soil W
    Existing Joint Use Pole
    Gas Valve
    Existing Control of Access Line
    Known Contamination Area: Water
    Proposed Joint Use Pole
    Gas Meter
    Proposed Control of Access Line C
    Potential Contamination Area: Water A
    Power Manhole
    U/G Gas Line Test Hole (SUE - LOS A)*
    Proposed ROW and CA Line RW
    Contaminated Site: Known or Potential CA
    Power Line Tower U/G Gas Line (SUE - LOS B)* G
    Existing Easement Line
    E
    BUILDINGS AND OTHER CULTURE:
    Power Transformer U/G Gas Line (SUE - LOS C)* G
    Proposed Temporary Construction Easement
    E
    Gas Pump Vent or U/G Tank Cap
    U/G Power Cable Hand Hole U/G Gas Line (SUE - LOS D)* G
    Permanent Construction Easement
    PE
    Sign H-Frame Pole Above Ground Gas Line A/G Gas
    Proposed Temporary Drainage Easement
    TDE
    Well U/G Power Line Test Hole (SUE - LOS A)*
    SANITARY SEWER:
    Proposed Permanent Drainage Easement
    PDE
    Small Mine U/G Power Line (SUE - LOS B)* P
    Sanitary Sewer Manhole
    Proposed Permanent Drainage/Utility Easement
    DUE
    Foundation U/G Power Line (SUE - LOS C)* P Sanitary Sewer Cleanout
    Proposed Permanent Utility Easement
    PUE
    Area Outline U/G Power Line (SUE - LOS D)* P U/G Sanitary Sewer Line
    SS
    Proposed Temporary Utility Easement
    TUE
    Cemetery TELEPHONE: Above Ground Sanitary Sewer A/G Sanitary Sewer
    Proposed Aerial Utility Easement
    AUE
    Building Existing Telephone Pole SS Force Main Line Test Hole (SUE - LOS A)*
    ROADS AND RELATED FEATURES:
    School Proposed Telephone Pole SS Force Main Line (SUE - LOS B)* FSS
    Existing Edge of Pavement
    Church Telephone Manhole SS Force Main Line (SUE - LOS C)* FSS
    Existing Curb
    Dam Telephone Pedestal SS Force Main Line (SUE - LOS D)*
    FSS
    C
    Proposed Slope Stakes Cut
    HYDROLOGY: Telephone Cell Tower MISCELLANEOUS:
    F
    Proposed Slope Stakes Fill
    Stream or Body of Water U/G Telephone Cable Hand Hole Utility Pole
    Hydro, Pool or Reservoir Proposed Curb Ramp CR U/G Telephone Test Hole (SUE - LOS A)* Utility Pole with Base
    Existing Metal Guardrail U/G Telephone Cable (SUE - LOS B)*
    Jurisdictional Stream T Utility Located Object
    JS
    Buffer Zone 1 Proposed Guardrail U/G Telephone Cable (SUE - LOS C)* T Utility Traffic Signal Box
    BZ 1
    Buffer Zone 2 BZ 2 Existing Cable Guiderail U/G Telephone Cable (SUE - LOS D)* T Utility Unknown U/G Line (SUE - LOS B)*
    ?UTL
    Flow Arrow Proposed Cable Guiderail U/G Telephone Conduit (SUE - LOS B)* TC U/G Tank; Water, Gas, Oil
    Disappearing Stream v Equality Symbol U/G Telephone Conduit (SUE - LOS C)* TC
    Underground Storage Tank, Approx. Loc.
    UST
    Spring Pavement Removal U/G Telephone Conduit (SUE - LOS D)* TC
    A/G Tank; Water, Gas, Oil
    Wetland VEGETATION: U/G Fiber Optics Cable (SUE - LOS B)* T FO Geoenvironmental Boring
    Proposed Lateral, Tail, Head Ditch Single Tree U/G Fiber Optics Cable (SUE - LOS C)* T FO Abandoned According to Utility Records AATUR
    FLOW
    False Sump Single Shrub U/G Fiber Optics Cable (SUE - LOS D)* T FO End of Information E.O.I.
    DOT/ext-dcrivenbark1-4/22/2026

    D -L- (US 23/441) SEE NOTE C * L VAR. 0' - 0" TO 30' - 0" 2' - 0"VARIES VARIES 26' - 0" VAR. 0'-0" TO 40'-0" 4' - 0" 4' - 0" PS PS 4' R1 C1 D1 C1 D1 0.02 FT/FT 0.02 FT/FT VARIES VARIES .02 TO .03.05 TO .08 * * V A R IE S 4 :1 T 0 6 :1 U E1 T U E1 T D UN * VARIABLE, SEE XSC TYPICAL SECTION NO. 1 U-TURN BULB OUT -L- STA. 10+95.19 THRU 13+79.02 * -L- STA. 10+84.24 THRU 16+32.12 PAVEMENT SCHEDULE NOTE: 5" MONOLITHIC CONCRETE ISLANDS VARIES IN WIDTH AND LOCATION SEE PLANS FOR ACTUAL LOCATIONS PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, C1 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, C2 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. PROP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, D1 TYPE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. PROP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, E1 AT AN AVERAGE RATE OF 798 LBS. PER SQ. YD. J PROP. 8" AGGREGATE BASE COURSE R1 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED) R2 5" MONOLITHIC CONCRETE ISLAND (KEYED IN) T EARTH MATERIAL U EXISTING PAVEMENT V1 1.5" PAVEMENT REMOVAL NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. HS-2414N
    2A-1
    NORTH CAROLINA EPARTMENT OF TRANSPORTATION ROADWAY DESIGN UNIT
    ROADWAY DESIGN ENGINEER RTHCAROL O IN N OFESSIO A R N P A L SEAL III J A 051774 M H E S ENGINE E R R T O E. S W HOLLING
    HYDRAULICS ENGINEER RTHCAROL O IN N OFESSIO A R N P A L SEAL III J A 051774 M H E S ENGINE E R R T O E. S W HOLLING
    OCUMENT NOT CONSIDERED FINAL LESS ALL SIGNATURES COMPLETED
    OP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS
    OP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
    OP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, PE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
    OP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AN AVERAGE RATE OF 798 LBS. PER SQ. YD.
    OP. 8" AGGREGATE BASE COURSE
    MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED)
    MONOLITHIC CONCRETE ISLAND (KEYED IN)
    RTH MATERIAL
    ISTING PAVEMENT
    " PAVEMENT REMOVAL

    02/62/5 HS-2414N
    2A-1
    NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    -L- (US 23/441)
    SEE NOTE
    C *
    L
    ROADWAY DESIGN UNIT
    ROADWAY DESIGN
    ENGINEER
    VAR. 0' - 0" TO 30' - 0" 2' - 0"VARIES VARIES 26' - 0" VAR. 0'-0" TO 40'-0" 4' - 0" 4' - 0"
    RTHCAROL
    PS PS N
    O
    R
    OFESSIO
    N
    IN
    A
    P A
    L
    J
    SEAL III
    A 051774
    M H
    E S ENGINE E R
    O
    R T
    E. S W
    HOLLING
    4'
    HYDRAULICS
    ENGINEER
    R1
    C1
    RTHCAROL
    D1 C1
    D1
    N O
    P R
    OFESSIO
    N A
    IN A
    0.02 FT/FT 0.02 FT/FT VARIES VARIES
    J
    SEAL L III
    A 051774
    * * .02 TO .03.05 TO .08 V A R M E S E. ENGINE E R S W O R T H
    IE
    S
    HOLLING
    4
    :1
    T
    0
    6
    :1
    U E1 T U
    E1 T
    DOCUMENT NOT CONSIDERED FINAL
    UNLESS ALL SIGNATURES COMPLETED
    * VARIABLE, SEE XSC
    TYPICAL SECTION NO. 1 U-TURN BULB OUT -L- STA. 10+95.19 THRU 13+79.02
    *
    -L- STA. 10+84.24 THRU 16+32.12
    PAVEMENT SCHEDULE
    NOTE: 5" MONOLITHIC CONCRETE ISLANDS VARIES IN WIDTH AND LOCATION
    SEE PLANS FOR ACTUAL LOCATIONS
    PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,
    C1
    AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS
    PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,
    C2
    AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
    PROP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE,
    D1
    TYPE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
    PROP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,
    E1
    AT AN AVERAGE RATE OF 798 LBS. PER SQ. YD.
    J PROP. 8" AGGREGATE BASE COURSE
    R1 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED)
    R2 5" MONOLITHIC CONCRETE ISLAND (KEYED IN)
    T EARTH MATERIAL
    U EXISTING PAVEMENT
    V1 1.5" PAVEMENT REMOVAL
    NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.

    D SOUTHBOUND LANES NORTHBOUND LANES -L- (US 23/441) C L -L- (US 23/441)C L VAR. VAR. 2' - 0" 2' - 0" 12' - 0" 0'-0" TO 4'-0" 2' - 0" 0'-0" TO 4'-0" 2' - 0" 12' - 0" MATCHLINE PS PS MATCHLINE V1 V1 * VARIABLE, SEE XSC R2 B R2 C2 C1 * VARIABLE, SEE XSC C2 0.02 FT/FT D1 A C1 .04 D1 0.02 FT/FT .04 * * * * V1 U T V1 E1 T U E1 D UN TYPICAL SECTION NO. 2 TYPICAL SECTION NO. 3 -L- STA. 24+57.62 THRU 26+38.00 -L- STA. 26+38.00 THRU 27+74.07 NOTE: 5" MONOLITHIC CONCRETE ISLANDS VARIES IN WIDTH AND LOCATION SEE PLANS FOR ACTUAL LOCATIONS PAVEMENT SCHEDULE PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, C1 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS MATCHLINE VARIABLE 4' -0" MATCHLINE 4'-0" VARIABLE PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, C2 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. PROP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, D1 TYPE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. A B PROP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, E1 AT AN AVERAGE RATE OF 798 LBS. PER SQ. YD. R1 R1 C1 C1 J PROP. 8" AGGREGATE BASE COURSE R1 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED) U J U J R2 5" MONOLITHIC CONCRETE ISLAND (KEYED IN) INSET A INSET B T EARTH MATERIAL USE WITH TYPICAL SECTION 2 USE WITH TYPICAL SECTION 3 U EXISTING PAVEMENT -L- STA. 25+28.75 THRU 26+07.09 -L- STA. 26+72.09 THRU 27+18.19 V1 1.5" PAVEMENT REMOVAL NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. HS-2414N
    2A-2
    NORTH CAROLINA EPARTMENT OF TRANSPORTATION ROADWAY DESIGN UNIT
    ROADWAY DESIGN ENGINEER RTHCAROL O IN N OFESSIO A R N P A L SEAL III J A 051774 M H E S ENGINE E R R T O E. S W HOLLING
    HYDRAULICS ENGINEER RTHCAROL O IN N OFESSIO A R N P A L SEAL III J A 051774 M H E S ENGINE E R R T O E. S W HOLLING
    OCUMENT NOT CONSIDERED FINAL LESS ALL SIGNATURES COMPLETED
    PAVEMENT SCHEDULE
    PROP. C1 AT AN APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS
    PROP. C2 AT AN APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AVERAGE RATE OF 168 LBS. PER SQ. YD.
    PROP. D1 TYPE I APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, 19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
    PROP. E1 AT AN APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AVERAGE RATE OF 798 LBS. PER SQ. YD.
    J PROP. 8" AGGREGATE BASE COURSE
    R1 5" MON OLITHIC CONCRETE ISLAND (SURFACE MOUNTED)
    R2 5" MO NOLITHIC CONCRETE ISLAND (KEYED IN)
    T EARTH MATERIAL
    U EXISTI NG PAVEMENT
    V1 1.5" PA VEMENT REMOVAL

    02/62/5
    NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    -L- (US 23/441)
    C
    L
    ROADWAY DESIGN UNIT
    -L- (US 23/441)C
    L
    ROADWAY DESIGN
    VAR. ENGINEER
    2' - 0" 2' - 0"
    2' - 0" 0'-0" TO 4'-0" 2' - 0" 12' - 0"
    PS
    V1
    HYDRAULICS
    V1 ENGINEER
    * VARIABLE, SEE XSC
    R2 C2 C1 * VARIABLE, SEE XSC
    C2
    0.02 FT/FT D1 C1
    D1 0.02 FT/FT
    *
    *
    *
    *
    U T
    E1
    T U
    E1
    DOCUMENT NOT CONSIDERED FINAL
    UNLESS ALL SIGNATURES COMPLETED
    TYPICAL SECTION NO. 2 TYPICAL SECTION NO. 3
    -L- STA. 24+57.62 THRU 26+38.00 -L- STA. 26+38.00 THRU 27+74.07
    PAVEMENT SCHEDULE
    PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,
    C1
    AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS
    PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,
    C2
    AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
    J PROP. 8" AGGREGATE BASE COURSE
    R1 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED)
    T EARTH MATERIAL
    U EXISTING PAVEMENT
    V1 1.5" PAVEMENT REMOVAL
    NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.
    MATCHLINE
    A
    MATCHLINE
    A
    12' - 0"
    PS
    R2
    4'-0"
    C1
    U J
    MATCHLINE
    B
    MATCHLINE
    B
    HS-2414N
    2A-2
    SOUTHBOUND LANES
    NORTHBOUND LANES
    VAR.
    0'-0" TO 4'-0"
    RTHCAROL
    N O
    R
    OFESSIO
    N
    IN A
    P A
    L
    J
    SEAL III
    A 051774 M H
    E S ENGINE E R
    O
    R T
    E. S W
    HOLLING
    RTHCAROL
    N
    O
    R
    OFESSIO
    N
    IN
    A
    .04 P A L
    J SEAL III
    A 051774
    M H
    .04 E S ENGINE E R
    O
    R T
    E. S W
    HOLLING
    V1
    V1
    NOTE: 5" MONOLITHIC CONCRETE ISLANDS VARIES IN WIDTH AND LOCATION
    SEE PLANS FOR ACTUAL LOCATIONS
    VARIABLE 4' -0"
    VARIABLE
    PROP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE,
    D1
    TYPE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
    PROP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,
    E1
    AT AN AVERAGE RATE OF 798 LBS. PER SQ. YD.
    R1
    R1
    C1
    U
    J R2 5" MONOLITHIC CONCRETE ISLAND (KEYED IN)
    INSET A INSET B
    USE WITH TYPICAL SECTION 2 USE WITH TYPICAL SECTION 3
    -L- STA. 25+28.75 THRU 26+07.09 -L- STA. 26+72.09 THRU 27+18.19

    2B-1
    NORTH CAROLINA EPARTMENT OF TRANSPORTATION ROADWAY DESIGN UNIT ROADWAY DESIGN ENGINEER
    O R T H C A R O L IN N R O FE S S IO N A P A L SEAL III J A 051774 M H E S ENGINE E R O R T E. S W HOLLING
    OCUMENT NOT CONSIDERED FINAL
    LESS ALL SIGNATURES COMPLETED

    11/14/23
    HS-2414N
    2B-1
    NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    -L- US 23/441
    10+84.24 ROADWAY DESIGN UNIT
    5.29' LT ROADWAY DESIGN
    ENGINEER
    12+06.15
    11+02.09
    11+81.16 11+81.14
    10 1 + .3 8 1 4 ' . L 2 T 4 1.71' RT 13.44' RT 12.77' RT 5.21' LT N O R R T O H FE C S A S R IO O N L IN A
    P A
    L
    J
    SEAL III
    A 051774
    M H
    E S ENGINE E R O R T
    E. S W
    HOLLING
    R 20' 1 R 4' TIE TO EXISTING
    10+84.24 2
    ' POINTS ARE
    1.69' RT
    R 3' 12+39.89 LOCATED ON
    SHEET 4
    11.40' RT
    P2
    12+06.40
    S'
    10+84.24 12.79' RT
    15.85' RT 11+57.67
    16.36' RT
    10+99.22 12+39.89
    15.93' RT 16.64' RT
    10+95.19
    48.28' RT
    13+79.02
    10+99.43 P4 45.08' RT
    '
    44.73' RT S
    DOCUMENT NOT CONSIDERED FINAL
    R 40' UNLESS ALL SIGNATURES COMPLETED
    N
    11+46.01
    84.45' RT
    SEE PLAN SHEET NO. 4
    N
    -L- US 23/441
    25+28.75
    6.71' LT 26+07.09
    26+47.09
    7.38' LT
    7.55' LT
    26+39.80
    26+64.19 26+97.90
    0.34' LT
    25+28.75 25+79.76 5.57' LT 7.59' LT
    0.87' RT 0.48' LT
    R 180'
    26+37.45
    P4 1.53' RT
    S'
    R 3'
    R 60'
    1
    R 40' 2
    TIE TO EXISTING '
    POINTS ARE R 180' R 105'
    1 TIE TO EXISTING
    2 R 300'
    LOCATED ON
    ' R 60' 27+18.19 POINTS ARE
    SHEET 5 P4 LOCATED ON
    7.05' RT S'
    SHEET 5
    R 3'
    27+18.19
    25+49.93 26+01.30 26+32.06 R 105' 26+42.02
    26+84.34
    15.51' RT
    15.49' RT 13.57' RT
    15.61' RT 2.37' RT
    8.19' RT
    26+97.91
    8.41' RT
    26+39.78 26+72.06
    4.37' RT 15.70' RT
    SEE PLAN SHEET NO. 5
    CONCRETE ISLAND &
    U-TURN LAYOUTS

    PROJECT REFERENCE NO. SHEET NO. HS-2414N 2C-1 NOITATROPSNART SYAWHGIH TOP OF FILL TOP OF FILL TOP OF FILL ANILORAC .C.N '1 '1 '1 FO GROUND LINE H GROUND LINE H GROUND LINE H ,HGIELAR ETATS FO HTRON COMPACT AFTER COMPACT AFTER NOISIVID PIPE IS PLACED PIPE IS PLACED FO & PRIOR TO & PRIOR TO PLACEMENT OF TYPE 4a PLACEMENT OF FILL GEOTEXTILE FILL .TPED I.D. /6 MIN. NOT LESS THAN 6" EARTH I.D. /6 MIN. I.D. /6 MIN. 1 NOT LESS THAN 6" O.D. + 3' 2 " PER FOOT OF 'H' NOT LESS THAN 6" BUT NOT LESS THAN 12" O.D. + 3' NOR MORE THAN 24" O.D. + 3' ROCK NORMAL EARTH FOUNDATION AS DIRECTED BY ENGR. ROCK FOUNDATION UNSUITABLE MATERIAL FOUNDATION PIPE IN TRENCH NOITALLATSNI TOP OF FILL TOP OF FILL TOP OF FILL ROF '1 '1 '1 H H H MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. GNIWARD 1 1 : : 1 1 1 : 1 1 1 1 GROUND LINE : GROUND LINE : : 1 1 1 EPIP GROUND LINE TYPE 4a GEOTEXTILE COMPACT AFTER LIATED ELBIXELF PIPE IS PLACED EPIP & PRIOR TO COMPACT AFTER PLACEMENT OF PIPE IS PLACED I.D. /6 MIN. FILL & PRIOR TO NOT LESS THAN 6" PLACEMENT OF I.D. /6 MIN. AS DIRECTED I.D. /6 MIN. FILL O.D. + 2' NOT LESS THAN 6" MIN. O.D. MIN. O.D. BY ENGINEER NOT LESS THAN 6" O.D.+ 2' YAWDAOR 1 FO " PER FOOT OF 'H' 2 BUT NOT LESS THAN 12" ROCK FOUNDATION NORMAL EARTH FOUNDATION NOR MORE THAN 24" UNSUITABLE MATERIAL FOUNDATION PIPE ABOVE GROUND DOHTEM GENERAL NOTES: I.D. = THE MAXIMUM HORIZONTAL INSIDE DIAMETER DIMENSION. DO NOT OPERATE HEAVY EQUIPMENT OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS TH CARO BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL. R L O FESSIO I N O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER DIMENSION. N O N A R A H = THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT REFER TO NCDOT PIPE MATERIAL SELECTION GUIDE AND STANDARD SPECIFICATIONS P L SEAL ALONG THE PIPE FROM THE TOP OF THE PIPE TO THE TOP FOR ALLOWABLE PIPE FILL HEIGHTS AND PIPE SPECIFICATIONS. R N 033144 E OF THE EMBANKMENT AT THAT POINT. I R L C O E N GIN E E C K SPRINGLINE OF PIPE L A E H APPROVED SUITABLE LOCAL MATERIAL. SELECT BACKFILL MATERIAL CLASS III OR CLASS II, TYPE 1 M. ABOVE AND BELOW SPRINGLINE. TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL. UNDISTURBED EARTH MATERIAL LOOSELY PLACED SELECT MATERIAL CLASS III OR CLASS II, TYPE 1 SELECT MATERIAL CLASS V OR VI FOR FOUNDATION CONDITIONING. ENCAPSULATE FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE SHEET OF 1 2 WITH TYPE IV GEOTEXTILE AS DIRECTED BY THE ENGINEER. UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL ACCOMPLISH COMPACTION. 300.01 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CONTRACTS STANDARDS AND DEVELOPMENT UNIT Office 919-707-6950 FAX 919-250-4119 SEE TITLE BLOCK ORIGINAL BY: S.CALHOUN DATE: 7-25-2024 MODIFIED BY: DATE: CHECKED BY: DATE: FILE SPEC.: PROJECT REFERENC E NO. SHEET NO.
    HS-2414N 2C-1
    CONTRACTS STANDARDS AND DEVELOPMENT UNIT Office 919-707-6950 FAX 919-250-4119
    SEE TITLE BLOCK
    ORIGINAL BY: S.CALHOUN DATE: 7-25-2024 MODIFIED BY: DATE: CHECKED BY: DATE: FILE SPEC.:
    TOP OF FILL TOP OF FILL TOP OF FILL '1 '1 '1 GROUND LINE H GROUND LINE H GROUND LINE H COMPACT AFTER COMPACT AFTER PIPE IS PLACED PIPE IS PLACED & PRIOR TO & PRIOR TO PLACEMENT OF TYPE 4a PLACEMENT OF FILL GEOTEXTILE FILL I.D. /6 MIN. NOT LESS THAN 6" EARTH I.D. /6 MIN. I.D. /6 MIN. 1 NOT LESS THAN 6" O.D. + 3' 2 " PER FOOT OF 'H' NOT LESS THAN 6" BUT NOT LESS THAN 12" O.D. + 3' NOR MORE THAN 24" O.D. + 3' ROCK NORMAL EARTH FOUNDATION AS DIRECTED BY ENGR. ROCK FOUNDATION UNSUITABLE MATERIAL FOUNDATION PIPE IN TRENCH NOITATROPSNART SYAWHGIH ANILORAC FO ETATS FO HTRON NOISIVID FO .TPED
    NOITALLATSNI ROF GNIWARD EPIP LIATED ELBIXELF EPIP YAWDAOR FO DOHTEM
    TOP OF FILL TOP OF FILL TOP OF FILL '1 '1 '1 H H H MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. 1 1 : : 1 1 1 : 1 1 1 1 GROUND LINE : GROUND LINE : : 1 1 1 GROUND LINE TYPE 4a GEOTEXTILE COMPACT AFTER PIPE IS PLACED & PRIOR TO COMPACT AFTER PLACEMENT OF PIPE IS PLACED I.D. /6 MIN. FILL & PRIOR TO NOT LESS THAN 6" PLACEMENT OF I.D. /6 MIN. AS DIRECTED I.D. /6 MIN. FILL O.D. + 2' NOT LESS THAN 6" MIN. O.D. MIN. O.D. BY ENGINEER NOT LESS THAN 6" O.D.+ 2' 1 " PER FOOT OF 'H' 2 BUT NOT LESS THAN 12" ROCK FOUNDATION NORMAL EARTH FOUNDATION NOR MORE THAN 24" UNSUITABLE MATERIAL FOUNDATION PIPE ABOVE GROUND
    GENERAL NOTES: I.D. = THE MAXIMUM HORIZONTAL INSIDE DIAMETER DIMENSION. DO NOT OPERATE HEAVY EQUIPMENT OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL. O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER DIMENSION. H = THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT REFER TO NCDOT PIPE MATERIAL SELECTION GUIDE AND STANDARD SPECIFICATIONS ALONG THE PIPE FROM THE TOP OF THE PIPE TO THE TOP FOR ALLOWABLE PIPE FILL HEIGHTS AND PIPE SPECIFICATIONS. OF THE EMBANKMENT AT THAT POINT. SPRINGLINE OF PIPE APPROVED SUITABLE LOCAL MATERIAL. SELECT BACKFILL MATERIAL CLASS III OR CLASS II, TYPE 1 ABOVE AND BELOW SPRINGLINE. TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL. UNDISTURBED EARTH MATERIAL LOOSELY PLACED SELECT MATERIAL CLASS III OR CLASS II, TYPE 1 SELECT MATERIAL CLASS V OR VI FOR FOUNDATION CONDITIONING. ENCAPSULATE FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE WITH TYPE IV GEOTEXTILE AS DIRECTED BY THE ENGINEER. UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL ACCOMPLISH COMPACTION.
    SHEET 1 O F 300.0

    H
    H
    '1 '1
    H
    '1 '1
    '1
    '1
    PROJECT REFERENCE NO. SHEET NO.
    TH CARO
    R L
    N
    O
    O
    FESSIO
    N
    I N
    A
    R A
    P
    L
    SEAL
    R
    N 033144
    E
    I R L
    C O E N GIN E E C K
    L A
    E
    M.
    H
    DOCUMENT NOT CONSIDERED FINAL
    UNLESS ALL SIGNATURES COMPLETED
    CONTRACTS STANDARDS
    AND DEVELOPMENT UNIT
    Office 919-707-6950 FAX 919-250-4119
    SEE TITLE BLOCK
    ORIGINAL BY: S.CALHOUN DATE: 7-25-2024
    MODIFIED BY: DATE:
    CHECKED BY: DATE:
    FILE SPEC.:
    FO
    ETATS
    ANILORAC
    HTRON
    NOITATROPSNART
    FO
    .TPED
    SYAWHGIH
    FO
    NOISIVID
    .C.N
    ,HGIELAR
    SHEET OF
    ROF
    GNIWARD
    LIATED
    YAWDAOR
    1 2
    300.01
    NOITALLATSNI
    EPIP
    FO
    DOHTEM
    EPIP
    ELBIXELF
    HS-2414N 2C-1
    TOP OF FILL TOP OF FILL TOP OF FILL
    GROUND LINE H GROUND LINE H GROUND LINE H
    COMPACT AFTER COMPACT AFTER
    PIPE IS PLACED PIPE IS PLACED
    & PRIOR TO & PRIOR TO
    PLACEMENT OF TYPE 4a PLACEMENT OF
    FILL GEOTEXTILE FILL
    I.D. /6 MIN.
    NOT LESS
    THAN 6" EARTH
    I.D. /6 MIN.
    I.D. /6 MIN.
    1
    NOT LESS THAN 6" O.D. + 3' 2 " PER FOOT OF 'H'
    NOT LESS THAN 6"
    BUT NOT LESS THAN 12"
    O.D. + 3' NOR MORE THAN 24"
    O.D. + 3'
    ROCK
    NORMAL EARTH FOUNDATION AS DIRECTED BY ENGR.
    ROCK FOUNDATION
    UNSUITABLE MATERIAL FOUNDATION
    PIPE IN TRENCH
    TOP OF FILL TOP OF FILL
    TOP OF FILL
    MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D.
    MIN. O.D. MIN. O.D.
    1 1
    : :
    1 1 1
    :
    1 1 1
    1 GROUND LINE : GROUND LINE :
    : 1 1
    1
    GROUND LINE TYPE 4a
    GEOTEXTILE
    COMPACT AFTER
    PIPE IS PLACED
    & PRIOR TO
    COMPACT AFTER
    PLACEMENT OF
    PIPE IS PLACED I.D. /6 MIN.
    FILL
    & PRIOR TO NOT LESS THAN 6"
    PLACEMENT OF I.D. /6 MIN. AS DIRECTED
    I.D. /6 MIN.
    FILL O.D. + 2' NOT LESS THAN 6" MIN. O.D. MIN. O.D. BY ENGINEER
    NOT LESS THAN 6" O.D.+ 2'
    1
    " PER FOOT OF 'H'
    2
    BUT NOT LESS THAN 12"
    ROCK FOUNDATION
    NORMAL EARTH FOUNDATION
    NOR MORE THAN 24"
    UNSUITABLE MATERIAL FOUNDATION
    PIPE ABOVE GROUND
    GENERAL NOTES:
    I.D. = THE MAXIMUM HORIZONTAL INSIDE DIAMETER DIMENSION. DO NOT OPERATE HEAVY EQUIPMENT OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS
    BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL.
    O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER DIMENSION.
    H = THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT REFER TO NCDOT PIPE MATERIAL SELECTION GUIDE AND STANDARD SPECIFICATIONS
    ALONG THE PIPE FROM THE TOP OF THE PIPE TO THE TOP FOR ALLOWABLE PIPE FILL HEIGHTS AND PIPE SPECIFICATIONS.
    OF THE EMBANKMENT AT THAT POINT.
    SPRINGLINE OF PIPE
    APPROVED SUITABLE LOCAL MATERIAL. SELECT BACKFILL MATERIAL CLASS III OR CLASS II, TYPE 1
    ABOVE AND BELOW SPRINGLINE.
    TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL.
    UNDISTURBED EARTH MATERIAL
    LOOSELY PLACED SELECT MATERIAL CLASS III OR CLASS II, TYPE 1
    SELECT MATERIAL CLASS V OR VI FOR FOUNDATION CONDITIONING. ENCAPSULATE
    FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE
    WITH TYPE IV GEOTEXTILE AS DIRECTED BY THE ENGINEER.
    UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL
    ACCOMPLISH COMPACTION.

    PROJECT REFERENCE NO. SHEET NO. HS-2414N 2C-2 NOITATROPSNART TOP OF FILL TOP OF FILL TOP OF FILL SYAWHGIH ANILORAC .C.N GROUND LINE H GROUND LINE H GROUND LINE H FO ,HGIELAR ETATS FO HTRON COMPACT AFTER COMPACT AFTER NOISIVID PIPE IS PLACED PIPE IS PLACED & PRIOR TO & PRIOR TO FO PLACEMENT OF TYPE 4a PLACEMENT OF FILL GEOTEXTILE FILL .TPED I.D. /6 MIN. NOT LESS THAN 6" EARTH I.D. /6 MIN. I.D. /6 MIN. 1 NOT LESS THAN 6" O.D. + 3' 2 " PER FOOT OF 'H' NOT LESS THAN 6" BUT NOT LESS THAN 12" O.D. + 3' NOR MORE THAN 24" O.D. + 3' ROCK NORMAL EARTH FOUNDATION AS DIRECTED BY ENGR. ROCK FOUNDATION UNSUITABLE MATERIAL FOUNDATION PIPE IN TRENCH NOITALLATSNI TOP OF FILL TOP OF FILL TOP OF FILL ROF H H H GNIWARD GROUND LINE GROUND LINE MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. TYPE 4a GROUND LINE 1 : 1 1 : GEOTEXTILE : 1 1 : : 1 : 1 1 1 1 1 EPIP 1 COMPACT AFTER LIATED PIPE IS PLACED & PRIOR TO EPIP DIGIR PLACEMENT OF I.D. /6 MIN. FILL NOT LESS THAN 6" I.D. /6 MIN. AS DIRECTED I.D. /6 MIN. COMPACT AFTER O.D. + 2' NOT LESS THAN 6" MIN. O.D. MIN. O.D. BY ENGINEER PIPE IS PLACED NOT LESS THAN 6" O.D.+ 2' 1 YAWDAOR " PER FOOT OF 'H' FO & PRIOR TO 2 PLACEMENT OF BUT NOT LESS THAN 12" ROCK FOUNDATION NORMAL EARTH FOUNDATION FILL NOR MORE THAN 24" UNSUITABLE MATERIAL FOUNDATION PIPE ABOVE GROUND DOHTEM GENERAL NOTES: I.D. = THE MAXIMUM HORIZONTAL INSIDE DIAMETER DIMENSION. DO NOT OPERATE HEAVY EQUIPMENT OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL. TH CARO O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER DIMENSION. R L O FESSIO I N N O N A H = THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT REFER TO NCDOT PIPE MATERIAL SELECTION GUIDE AND STANDARD SPECIFICATIONS R A P L ALONG THE PIPE FROM THE TOP OF THE PIPE TO THE TOP FOR ALLOWABLE PIPE FILL HEIGHTS AND PIPE SPECIFICATIONS. SEAL R N 033144 OF THE EMBANKMENT AT THAT POINT. E I R L SPRINGLINE OF PIPE C O E N GIN E E C K L A APPROVED SUITABLE LOCAL MATERIAL. SELECT BACKFILL MATERIAL CLASS III OR CLASS II, E H M. BELOW SPRINGLINE. TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL. UNDISTURBED EARTH MATERIAL LOOSELY PLACED SELECT MATERIAL CLASS III OR CLASS II, TYPE 1 SELECT MATERIAL CLASS V OR VI FOR FOUNDATION CONDITIONING. ENCAPSULATE FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE WITH TYPE IV GEOTEXTILE AS DIRECTED BY THE ENGINEER. SHEET OF 2 2 UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL ACCOMPLISH COMPACTION. 300.01 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CONTRACTS STANDARDS AND DEVELOPMENT UNIT Office 919-707-6950 FAX 919-250-4119 SEE TITLE BLOCK ORIGINAL BY: S.CALHOUN DATE: 7-25-2024 MODIFIED BY: DATE: CHECKED BY: DATE: FILE SPEC.: PROJECT REFERENC E NO. SHEET NO.
    HS-2414N 2C-2
    CONTRACTS STANDARDS AND DEVELOPMENT UNIT Office 919-707-6950 FAX 919-250-4119
    SEE TITLE BLOCK
    ORIGINAL BY: S.CALHOUN DATE: 7-25-2024 MODIFIED BY: DATE: CHECKED BY: DATE: FILE SPEC.:
    TOP OF FILL TOP OF FILL TOP OF FILL GROUND LINE H GROUND LINE H GROUND LINE H COMPACT AFTER COMPACT AFTER PIPE IS PLACED PIPE IS PLACED & PRIOR TO & PRIOR TO PLACEMENT OF TYPE 4a PLACEMENT OF FILL GEOTEXTILE FILL I.D. /6 MIN. NOT LESS THAN 6" EARTH I.D. /6 MIN. I.D. /6 MIN. 1 NOT LESS THAN 6" O.D. + 3' 2 " PER FOOT OF 'H' NOT LESS THAN 6" BUT NOT LESS THAN 12" O.D. + 3' NOR MORE THAN 24" O.D. + 3' ROCK NORMAL EARTH FOUNDATION AS DIRECTED BY ENGR. ROCK FOUNDATION UNSUITABLE MATERIAL FOUNDATION PIPE IN TRENCH NOITATROPSNART SYAWHGIH ANILORAC FO ETATS FO HTRON NOISIVID FO .TPED
    NOITALLATSNI ROF GNIWARD EPIP LIATED EPIP DIGIR YAWDAOR FO DOHTEM
    TOP OF FILL TOP OF FILL TOP OF FILL H H H GROUND LINE GROUND LINE MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. TYPE 4a GROUND LINE 1 : 1 1 : GEOTEXTILE : 1 1 : : 1 : 1 1 1 1 1 1 COMPACT AFTER PIPE IS PLACED & PRIOR TO PLACEMENT OF I.D. /6 MIN. FILL NOT LESS THAN 6" I.D. /6 MIN. AS DIRECTED I.D. /6 MIN. COMPACT AFTER O.D. + 2' NOT LESS THAN 6" MIN. O.D. MIN. O.D. BY ENGINEER PIPE IS PLACED NOT LESS THAN 6" O.D.+ 2' 1 " PER FOOT OF 'H' & PRIOR TO 2 PLACEMENT OF BUT NOT LESS THAN 12" ROCK FOUNDATION NORMAL EARTH FOUNDATION FILL NOR MORE THAN 24" UNSUITABLE MATERIAL FOUNDATION PIPE ABOVE GROUND
    GENERAL NOTES: I.D. = THE MAXIMUM HORIZONTAL INSIDE DIAMETER DIMENSION. DO NOT OPERATE HEAVY EQUIPMENT OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL. O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER DIMENSION. H = THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT REFER TO NCDOT PIPE MATERIAL SELECTION GUIDE AND STANDARD SPECIFICATIONS ALONG THE PIPE FROM THE TOP OF THE PIPE TO THE TOP FOR ALLOWABLE PIPE FILL HEIGHTS AND PIPE SPECIFICATIONS. OF THE EMBANKMENT AT THAT POINT. SPRINGLINE OF PIPE APPROVED SUITABLE LOCAL MATERIAL. SELECT BACKFILL MATERIAL CLASS III OR CLASS II, BELOW SPRINGLINE. TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL. UNDISTURBED EARTH MATERIAL LOOSELY PLACED SELECT MATERIAL CLASS III OR CLASS II, TYPE 1 SELECT MATERIAL CLASS V OR VI FOR FOUNDATION CONDITIONING. ENCAPSULATE FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE WITH TYPE IV GEOTEXTILE AS DIRECTED BY THE ENGINEER. UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL ACCOMPLISH COMPACTION.
    SHEET 2 O F 300.0
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Bid Title: EAST WILLIAMS LOWER Substation Structural & Electric Materials Category: Utility Construction

    Town of Apex

    Bid Due: 8/21/2026

    D6D1.SBE.008 SBE Light Duty Maintenance Crew - Various Routes - Robeson D6D1.SBE.008 -

    Division of Highways

    Bid Due: 8/05/2026

    July 24, 2026 | Advertisements Advertisement for Bids - Avent Ferry Technology Center

    North Carolina State University

    Bid Due: 8/18/2026

    Follow Appalachian Ranger District Office and Work Center Janitorial Services Active Contract Opportunity

    AGRICULTURE, DEPARTMENT OF

    Bid Due: 8/20/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.