| Location: | Utah |
|---|---|
| Posted: | Feb 4, 2025 |
| Due: | Feb 20, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025B-01 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project, consisting of the following items of work: mobilization, obtaining all bonds and insurance including railroad insurance as required, remove and replace of fire hydrants, concrete, asphalt, and other finish amenities, furnish and installation of approximately 625 lf. of 12" PVC SDR 35 sanitary sewer pipe with approximately 60 lf. of jack and bored 24" steel sleeve under Union Pacific Railroad crossing. Includes reconnection of all existing sanitary sewer laterals, removal of existing manholes, placement of new manholes, and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC.

With GovernmentContracts, you can:
...Project: 13800 South Mountain View Corridor Sewer Project Ref. #: JBID971 Department: SPECIAL... ...
State Government of Utah
Bid Due: 10/13/2026
...Project: 13200 South Mountain View Corridor Sewer Project Ref. #: JBID973 Department: SPECIAL... ...
State Government of Utah
Bid Due: 10/13/2026
...is comprised of approximately 1,100 miles of sanitary sewer lines. The District owns ...
State Government of Utah
Bid Due: 10/08/2026
...campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock...
AGRICULTURE, DEPARTMENT OF
Bid Due: 10/08/2026