| Location: | Vermont |
|---|---|
| Posted: | Dec 1, 2025 |
| Due: | Dec 19, 2025 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Chittenden Keywords: Construction (Non Building), Paving Contractor, Road Construction Bid Description: BEGINNING AT A POINT ON US ROUTE 7 IN THE TOWN OF MILTON AT THE US ROUTE 7 AND CENTRE DRIVE INTERSECTION (MM 3.655) AND EXTENDING APPROXIMATELY 2056.67 FEET IN A NORTHERLY DIRECTION ALONG US ROUTE 7 ENDING AT MM 4.044. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES RECONFIGURATION OF AN EXISTING INTERSECTION, REMOVAL OF THE CONCRETE BASE UNDER US ROUTE 7, THE CONSTRUCTION OF TWO NEW ROADWAYS, FULL DEPTH RECONSTRUCTION, TRAFFIC SIGNALS, LIGHTING, LANDSCAPING, AND OTHER HIGHWAY RELATED WORK. ENGINEERS CATEGORY F
|
||||||||||||||||||||

With GovernmentContracts, you can:
Reading ER P23-1 (404) Request Date: 7/29/2026 1:05:25 PM Open Date: Closing Date:
State Government of Vermont
Bid Due: 8/21/2026
Williston Road Stormwater Structures Request Date: 7/29/2026 8:42:48 AM Open Date: Closing Date:
State Government of Vermont
Bid Due: 8/27/2026
Follow Dental and Audiology Coordinator for the Vermont Army National Guard Active Contract
DEPT OF DEFENSE
Bid Due: 8/23/2026
Roadway Line Striping and Markings Request Date: 7/24/2026 2:23:32 PM Open Date: Closing
State Government of Vermont
Bid Due: 8/19/2026