| Location: | Federal |
|---|---|
| Posted: | Jun 9, 2025 |
| Due: | Jun 16, 2025 |
| Agency: | San Antonio Water System |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PS-00186-RL |
| Publication URL: | To access bid details, please log in. |
PLEASE SEE ADDENDUM 3 REVISIONS TO ATTACHMENT II EVALUATION CRITERIA REQUIREMENTS, AND ATTACHMENT III EVALUATION CRITERIA FORMS FOR THIS RFQ
PLEASE SEE ADDENDUM 2 FOR ANSWERS TO QUESTIONS, REVISIONS TO ATTACHMENT II EVALUATION CRITERIA REQUIREMENTS, AND ATTACHMENT III EVALUATION CRITERIA FORMS FOR THIS RFQ
PLEASE SEE ADDENDUM 1 FOR UPDATE ON LOCATION OF THE IN PERSON NON-MANDATORY PRE-SUBMITTAL CONFERENCE
Solicitation Name: 2025 Production/Treatment Engineering Work Order Design Services (RFQ)
Solicitation No.: PS-00186
The San Antonio Water System (SAWS) is pursuing Requests for Qualifications (RFQ) for professional engineering services for the 2025 Production/Treatment Engineering Work Order Design Services Project (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by a qualified professional engineering firm. The selected professional engineering firm shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management services for the design and construction of the Project.
The anticipated services will include project management and coordination, civil, mechanical, structural, and electrical engineering services, instrumentation and controls, surveying, permitting, geotechnical engineering, subsurface utility engineering, preliminary engineering, design, scheduling, cost estimating, construction management, operations support, and other services as necessary for the Project. These services shall be required on an “as needed” basis.
SAWS may elect to award a work order type of contract to one (1) or more Consultants from this Solicitation to provide professional engineering design and construction phase services for the Project. Under a work order type of contract several projects may be issued on an “as-needed” basis.
|
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
|
|
|
PS-00186 Non-Mandatory Pre-Submittal Conference Presentation Jun. 2, 2025 |
|
|
|
PS-00186 Non-Mandatory Pre-Submittal Conference Sign in Sheet Jun. 2, 2025 |
|
|
|
PS-00186 Addendum 3 Attachment III Evaluation Criteria Forms (Word) Jun. 9, 2025 |
|
|
|
PS-00186 Addendum 1 May. 30, 2025 |
|
|
|
PS-00186 Addendum 2 Jun. 6, 2025 |
|
|
|
PS-00186 Addendum 3 Jun. 9, 2025 |
|
Questions? Please contact
Roxanne Lockhart
at 210-233-3095
|
Receive Email Updates
|
Registration Agreement

With GovernmentContracts, you can:
...of existing conditions, preparation of schematic designs, space plans, construction documents... and preparation ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/17/2026