| Location: | Washington |
|---|---|
| Posted: | Apr 18, 2025 |
| Due: | Apr 28, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 4/28/25 1:00pm |
Spokane, WA
This project consists of the reconstruction of overlay slabs and concrete channeling, replacement of existing gravity activated flush system with powered flush control system, providing temporary sewer bypass, electrical conduit and conductors, utility service, site lighting, associated electrical wiring, conduit, & panels, relocation of existing flap check valve, reinforced grassed driveway, ventilation pipe repairs, reconstruction of access manholes, sealing CSO tank roof, wall and roof penetrations, and access risers, removal and replacement of concrete curb, steel access gate, and other related miscellaneous items at three combined sewer overflow (CSO) sites.

With GovernmentContracts, you can:
...of a maintenance foot path and vehicle access, hot mix asphalt (HMA) saw ...
State Government of Washington
Bid Due: 6/24/2026
...with a wrap-around access platform for staff operating the facility and a large ...
Federal Agency
Bid Due: 7/06/2026
...include removal of the existing crossovers used for temporary traffic control, restoring delineation... ...
State Government of Washington
Bid Due: 7/01/2026
..., erosion control, removal and installation of beam guardrail and high tension cable ...
State Government of Washington
Bid Due: 7/15/2026