| Location: | Minnesota |
|---|---|
| Posted: | Sep 28, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation215 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is the second part of a 4-part waterproofing effort to completely remove and recoat the T1 Tug Drive with new waterproofing. The project includes temporary full-height poly enclosures per each phased area of work; traffic control; removal and relocations of furnishings; expansion control; waterproofing and pavement markings; concrete repair to concrete topping and structural slab as needed; mechanical piping and floor drain replacements.

With GovernmentContracts, you can:
..., Aggregate, Removal and Replacement of pipe, Sewer and Water Construction, Pavement Removal, ...
WSB
Bid Due: 11/03/2026
...includes the following at two light rail stations (Nicollet Mall & 46th Street ...
Metropolitan Council
Bid Due: 11/04/2026
...,Pavement Removal,Paving (Asphalt or Concrete),Removal and Replacement of pipe,Sewer and Water... Removal, Excavation, ...
WSB
Bid Due: 11/03/2026