| Location: | Minnesota |
|---|---|
| Posted: | Sep 28, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation215 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is the second part of a 4-part waterproofing effort to completely remove and recoat the T1 Tug Drive with new waterproofing. The project includes temporary full-height poly enclosures per each phased area of work; traffic control; removal and relocations of furnishings; expansion control; waterproofing and pavement markings; concrete repair to concrete topping and structural slab as needed; mechanical piping and floor drain replacements.

With GovernmentContracts, you can:
...Follow Purchase of 2 or 3 Temporary Road Bridges Active Contract Opportunity Notice ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/10/2026
..., consultants must be pre-qualified in the following work types: 2.13 Highway Design ...
State Government of Minnesota
Bid Due: 11/05/2026
...be pre-qualified in the following work types: 2.13 Highway Design - Level 3 ...
State Government of Minnesota
Bid Due: 11/05/2026
..., grading, temporary wastewater conveyance, construction of temporary earth retention systems, sewer...
Metropolitan Council
Bid Due: 11/03/2026