| Location: | South Carolina |
|---|---|
| Posted: | Sep 17, 2025 |
| Due: | Oct 21, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The primary goal of this project is to evaluate the Town’s water and sewer infrastructure and develop a Capital Improvement’s Plan to guide future investments and improvements. This includes assessing the financial capability of the system for existing and future needs, evaluating the condition of the water and sewer systems, and identifying critical areas requiring repair or upgrades.
The Town of Williston is issuing this Request for Qualifications (RFQ) to identify a licensed engineer to provide a full range of engineering services to support the implementation of the Infrastructure Planning project. These services will be provided under contract with the Town of Williston with funding provided in whole or in part by the South Carolina Rural Infrastructure Authority (RIA) under RIA State Grant #P-25-5041.

With GovernmentContracts, you can:
...County For additional information contact our engineer, Infrastructure Consulting and Engineering...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/12/2026
...electrical system upgrades to add capacity to the 1951 infrastructure by replacing the ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...sanitary sewer infrastructure within the Mill Village area of the Town of Lyman. ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...will enhance accessibility and pedestrian circulation and improve infrastructure resilience. Project Details... accessibility ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026