| Location: | Pennsylvania |
|---|---|
| Posted: | Jul 30, 2025 |
| Due: | Aug 11, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | County of Bucks, PA |
| Publication URL: | To access bid details, please log in. |
Project Description: The stabilization work to be done under this contract consists of all labor, equipment and materials to relocate the existing trail and install streambank stabilization methods. The work included soil erosion and sediment control measures, pavement, rock stabilization methods and biostabilization methods.

With GovernmentContracts, you can:
...in the contract documents. The Ba se Bid includes Soil Erosion a nd ...
Windsor township
Bid Due: 6/23/2026
...injection at exterior foundation soils and within the elevator pit to mitigate groundwater...
PennBid
Bid Due: 6/10/2026
...structures and utilities, soil erosion control measures, traffic control, clean-up and removal...
PennBid
Bid Due: 7/01/2026
...77121504 - Air pollution monitoring or measurement services 77121606 - Soil pollution measurement... ...
State Government of Pennsylvania
Bid Due: 12/31/2099