| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | May 7, 2026 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
Colonial Heights and Lincoln Village Water Main Replacement Project Phase 1B
The work is located within the Colonial Heights Maintenance District and Lincoln Village Maintenance District in Stockton, CA.
The work, in general, consists of installing approximately 4,860 feet of new water mains along with necessary valves, fire hydrants, and various appurtenances within the Colonial Heights and Lincoln Village Maintenance Districts. In addition, water service laterals and connections will be relocated to the front of the properties. Existing water mains and services in residential backyards will be abandoned. There is no DBE Contract goal. Base Estimate Range Between $3,100,000 and $3,810,000 |
05/07/2026 08:31 PM UTC |

With GovernmentContracts, you can:
...Project ID: Title: Bystrum Area - Phase 1 Strengthen & Replace Water Mains ...
City of Modesto
Bid Due: 9/01/2026
...POTABLE WATER SEPARATION FOR " JAMACHA FORCE MAIN AND GRAVITY MAIN SEWER IMPROVEMENTS ...
County of San Diego
Bid Due: 8/13/2026
...water main replacement, seismic improvements, water service and hydrant replacements, and water... and ...
City of Palo Alto
Bid Due: 8/21/2026
...145827 - 145827 OFFICE TRAILER FOR MAIN ST. BUILDING 7A Status Stage Open ...
City of Los Angeles
Bid Due: 8/31/2026