| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | May 7, 2026 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
Colonial Heights and Lincoln Village Water Main Replacement Project Phase 1B
The work is located within the Colonial Heights Maintenance District and Lincoln Village Maintenance District in Stockton, CA.
The work, in general, consists of installing approximately 4,860 feet of new water mains along with necessary valves, fire hydrants, and various appurtenances within the Colonial Heights and Lincoln Village Maintenance Districts. In addition, water service laterals and connections will be relocated to the front of the properties. Existing water mains and services in residential backyards will be abandoned. There is no DBE Contract goal. Base Estimate Range Between $3,100,000 and $3,810,000 |
05/07/2026 08:31 PM UTC |

With GovernmentContracts, you can:
...Bid Details WD-2885 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving... ...
San Francisco Public Utilities Commission
Bid Due: 7/02/2026
...Bid Details WD-2885 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving... ...
San Francisco Public Utilities Commission
Bid Due: 7/02/2026
...this project includes abandoning an existing 2" water main and installation of a ...
Half Moon Bay city
Bid Due: 7/08/2026
...of potable water main extension from George Boulevard and South Carolina Avenue to ...
City of Victorville
Bid Due: 6/23/2026