| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | May 7, 2026 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
Colonial Heights and Lincoln Village Water Main Replacement Project Phase 1B
The work is located within the Colonial Heights Maintenance District and Lincoln Village Maintenance District in Stockton, CA.
The work, in general, consists of installing approximately 4,860 feet of new water mains along with necessary valves, fire hydrants, and various appurtenances within the Colonial Heights and Lincoln Village Maintenance Districts. In addition, water service laterals and connections will be relocated to the front of the properties. Existing water mains and services in residential backyards will be abandoned. There is no DBE Contract goal. Base Estimate Range Between $3,100,000 and $3,810,000 |
05/07/2026 08:31 PM UTC |

With GovernmentContracts, you can:
...NASPO ValuePoint Fire Trucks and Fire Apparatus (State of Mississippi RFP# 3120003350)Details... ValuePoint ...
State Government of California
Bid Due: 6/10/2026
...Specification # Project Name Link to PDF Bids Due PW 26-73 Fire Suppression ...
City of Oroville
Bid Due: 6/10/2026
...9TSC0107-Parkfield Fire Station ReplacementDetails Event ID 9TSC0107 Format/Type: Sell Event / RFx... Published ...
State Government of California
Bid Due: 8/11/2026
...Specification # Project Name Link to PDF Bids Due PW 26-68 Fire Suppression ...
City of Oroville
Bid Due: 6/16/2026