St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements

Location: Missouri
Posted: Jun 1, 2026
Due: Jun 3, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements 5/4/26 6/3/26
Addendum 1 St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements Addendum 1 6/1/26 6/3/26
Addendum 2 St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue, resurfacing, curb ramp upgrades, and traffic signal improvements Addendum 2 6/1/26 6/3/26

Attachment Preview

NOTICE TO CONTRACTORS
Sealed bids for the Hanley Road Laclede Station Road Resurfacing project will be received electronically
thru the County’s Vendor Self Service portal at:
https://stlouiscountymovendors.munisselfservice.com/Vendors/default.aspx until 2:00 p.m. on June 3, 2026
and at that time will be opened and read. Vendors may view the bid opening at
https://teams.microsoft.com/l/meetup-
join/19%3ameeting_N2Y4OGNjNWItYWFiMi00ZDhlLTg1ODQtZTRiMDgzMjYyZTU1%40thread.v2/0?context
=%7b%22Tid%22%3a%225102876d-b686-4f35-9dca-
09ae7168aa1a%22%2c%22Oid%22%3a%22d0c220d2-0c9f-44e3-bcfe-f28a362e83db%22%7d
Meeting ID: 237 992 395 167
Passcode: 3jg3eK3x
Dial in by phone: 1-872-256-4170, Phone conference ID: 636 115 662
St. Louis County Project No. AR-1819, Federal Project No. STP-5613(610) consists of removal and
replacement of deteriorated and/or damaged pavement and curbs, surfacing and texturing, asphaltic concrete
overlay, removal and replacement of sidewalk and curb ramps, signal improvements including installation of
accessible pedestrian signals, and other incidental items along Hanley Road-Laclede Station Road from
Manchester Road to Newport Avenue.
The successful Bidder or Bidders shall be required to comply with the most current applicable Federal (Davis-
Bacon Act) and State statutory provisions concerning the payment of prevailing wages on public works, Section
290.210 through 290.340 R.S. Mo. 1959, as amended. All contractors must be on the Missouri Department of
Transportation’s approved contractor listing, seven (7) days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10)
hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial
Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the
construction project.
St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged
individuals will be afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in
consideration for an award.
Plans and specifications will be available on May 4, 2026 from the St. Louis County Web Site
(www.stlouiscountymo.gov), or by contacting Cross Rhodes Print & Technologies, 2731 South Jefferson
Avenue, St. Louis, Missouri 63118, (314) 678-0087. There will be no refunds on any documents purchased.
All questions must be submitted by 5:00 p.m. on May 27, 2026 via e-mail to the Contract Administrator,
Jill Allen, JAllen@stlouiscountymo.gov.
Select the following link to view/purchase plans and specifications for this project:
http://www.stlouiscoplans.com
Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All
checks shall be made payable to "Treasurer, St. Louis County."
The right is reserved by the St. Louis County to reject any or all bids.
The DBE Goal for this project is 0%
No 2nd tier subcontracting will be allowed on this project.
DIRECTOR OF PROCUREMENT
ST. LOUIS COUNTY
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: Safety Equipment & Supplies Ref. #: 26-033 Type: ITB Status: Open Open ...

Jackson County, Missouri

Bid Due: 6/09/2026

...RFP 2026-17: Public Safety Emergency Radio System NOTICE TO BIDDERS Newton County Commission... ...

Newton County

Bid Due: 7/16/2026

...- Study for traffic safety and operations improvements along Route 141 from MO ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/17/2026

...Safety, Mechanics, Transit Service Managers (TSMs), Operations Control Center, (OCC), Rail Dispatchers...

St. Louis region

Bid Due: 6/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.