| Location: | Massachusetts |
|---|---|
| Posted: | Mar 12, 2026 |
| Due: | Apr 9, 2026 |
| Agency: | Town of Barnstable Invitation |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-IFB-063 |
| Publication URL: | To access bid details, please log in. |
Project Description: Furnishing all labor, materials, and equipment necessary for construction of a new playground located in Osterville, MA including : Temporary sedimentation control, removal of existing trees, fencing, signage, concrete piers, septic tanks, manholes, storm water structures, bituminous and concrete pavement, vegetation, site utility relocation, protection of existing trees and features to remain, installation of playground equipment provided by Owner, installation of new sidewalk, fencing, playground surfacing, sidewalks, trash compactor, bituminous pavement and markings, water bottle filler and loam and seeding.

With GovernmentContracts, you can:
...work shall include demolition, cast-in-place cement concrete stairs and ramps; repairs to existing... ...
Commonwealth of Massachusetts
Bid Due: 10/01/2026
...of Scott Tower. Site work shall include demolition, cast-in-place cement concrete stairs and ...
City of Holyoke
Bid Due: 10/15/2026
...linear feet of boat sections; and 770 feet of concrete viaducts. Also included ...
Bid Due: 12/31/2099
...of Scott Tower. Site work shall include demolition, cast-in-place cement concrete stairs and ...
City of Holyoke
Bid Due: 10/01/2026