Sierra Vista Elementary School Project

Location: California
Posted: Mar 12, 2026
Due: Apr 2, 2026
Agency: Center Joint Unified School District
Type of Government: State & Local
Category:
  • U - Education and Training Services
Publication URL: To access bid details, please log in.

Sierra Vista Elementary School

Attachment Preview

Center Joint Unified School District
8408 Watt Avenue
Antelope, CA 95843
Sierra Vista Elementary School Project
Request for Qualifications
To Provide
Progressive Design-Build
Construction Services
February 23, 2026
Table of Contents
I. Introduction
II. Project Description
III. Scope of Design Builders Work
IV. Critical Dates
V. Additional Information
VI. Contract Parameters
VII. Selection Process
Exhibit A – Site Location Plan
Exhibit B – Prequalification Questionnaire
Exhibit C – Conflict of Interest Checklist
Center Joint USD – Sierra Vista Elementary School Project
Request for Qualifications - Project #26-04
56104521.1/005484.00006
Center Joint Unified School District
I.
INTRODUCTION
Center Joint Unified School District (District) invites interested Design-Build Entities to submit a Statement of
Qualifications (“SOQ”) for the purpose of pre-qualifying proposers for design and construction of the new Sierra
Vista Elementary School (Project) in Roseville, California. The District intends to use the Progressive or
Collaborative style of design-build.
This Request for Qualifications (“RFQ”) is the first of a two-step process to select a Design-Build Entity for the
Project. First, all interested Design-Build Entities (“Respondents”) must submit an SOQ on the form and in the
format provided by the District. After the SOQs have been evaluated, the District will select/short-list up to five of the
highest rated Respondents to receive a Request for Proposals (“RFP”). Second, the District will evaluate the
Proposals submitted in response to the RFP to identify the successful Design-Build Entity to whom the design-build
contract for the Project will be awarded based on a determination of which Proposal provides the Best Value to the
District for the Project. Only Respondents that are short-listed, including but not limited to the requirements
for use of a skilled and trained workforce pursuant to Public Contract Code sections 2600 to 2602, will be
eligible to submit a proposal in response to the RFP. A more detailed description of the selection process is set
forth in Section VII below.
The District reserves the right to find any SOQ that is incomplete or otherwise fails to respond to all requirements
of this RFQ non-responsive, and to give it no further consideration. The District also reserves the right to request
clarification and/or additional information from any Respondent.
Except as provided, communication with the District or any Center Joint Unified School District’s Board member or
employee, with regard to the substance of the RFQ or any SOQ is prohibited.
Neither this RFQ nor the identification of qualified Respondents for any purpose creates any obligation whatsoever,
either express or implied, for the District to award any contract. Neither this RFQ nor the identification of qualified
Respondents pursuant hereto will apply to, or operate to deem a Respondent qualified for any other District project,
contract or other purpose.
II.
PROJECT DESCRIPTION
A new Elementary School for 800 students is required for Center Joint Unified School District . The District desires
to use the Design-Build approach for this Project. The Goals of the Project are (1) to achieve a design which can be
quickly approved by DSA to allow early application to the State Allocation Board and Office of Public School
Construction for State Facility Plan funding and (2) to achieve high quality but economical facilities. The District’s
Educational Specifications anticipate flexible learning spaces to support student education.
The school will be built on a new 12 acre site served by existing streets on two sides. The site is located at the
corner of Vista Grande Blvd. and Silver Spruce Drive, and the parcel number is APN 499-010-095-000. The school
will include TK to 6th grade classrooms and specialty learning spaces, a multi-purpose building for indoor play and
lunch service with a warming kitchen, and support spaces for administration, counseling, faculty break room, and
PE equipment storage. The expected cost of design and construction is $65,000,000.00 for the 800-student school.
A map showing the location is attached as Exhibit A.
Statements of Qualifications are desired from teams of General Contractors, Architects of Record and
Subconsultants comprising, forming, contracting with or otherwise participating in a Design-Build Entity in relation to
the Project necessary to design the site including Civil Engineer and Landscape Architect. Although expeditious
completion of design and DSA approval is desired, The District does have a preference for single story or two story
site-built facilities but is open to considering modular, or prefabricated construction options.
Center Joint USD – Sierra Vista Elementary School Project
Request for Qualifications - Project #26-04
56104521.1/005484.00006
The Design-Build Entity is required to hold a California Contractor’s License, Class B, which is current, valid and in
good standing with the California Contractor’s State License Board, and is required to be registered with the
Department of Industrial Relations (“DIR”) pursuant to Labor Code section 1725.5. The Architect and Principal
Engineers are required to be licensed in the State of California and in good standing.
The firm of Capital Program Management has been retained to prepare the Request for Qualifications, Request for
Proposals, and other documents on which selection is based. This firm may not participate in any Design-Build
team seeking to be selected for the project. Products prepared for the District describing earlier District school
designs, requirements, Criteria Documents and Educational Specifications will be given for information in the
Request for Proposal. Teams must examine Exhibit C, Conflict of Interest Checklist and return with their SOQ the
portion of Exhibit C identifying and explaining any possible conflict of interest.
III SCOPE OF DESIGN-BUILD ENTITY’S WORK
The Design-Build Entity will be responsible for all obligations, terms and conditions of the Agreements promulgated by the District,
including, without limitation, design, permitting, agency review and approval including, without limitation, Division of the
State Architect [“DSA”], CDE, and City of Roseville, construction and agency (including DSA) certification of the
Project. Such services shall include, without limitation:
a. Validating the District’s space requirements, spatial and adjacency preferences, technical material
and system requirements and preferences from the documents prepared for the last District design
build school. Developing specific implementation of the security and technology requirements
of the District educational specification. Verifying requirements of all applicable codes and
ordinances of agencies having jurisdiction. Verifying existing utility provisions and topography and
adjacent improvements. Advising needs for the preparation of the final geotechnical and geohazard
report.
b. Providing project management of Design-Build Entity’s work activities from design to permitting and
agency approvals through completion of construction and close-out, including DSA final certification.
The District will pay all agency fees. The District will provide a Geotechnical and Geohazard report.
c. Providing full design and engineering services necessary to complete the design and secure approval
of all agencies, including, without limitation, DSA, for the Project. Design services generally required
are evaluation of the site and of the design criteria documents and other Project-related information;
preparation of a preliminary schedule; coordinating and obtaining all planning permits; preparing
design development documents, attending design review meetings and resolving review comments
to the satisfaction of the District; preparing construction documents; securing design approval of
DSA and other agencies; and performing work necessary to prepare and submit an acceptable
certified project.
d. Coordinating with the County health department to obtain kitchen design and construction approval.
Coordinating with all utility companies and agencies and obtaining applications and approvals for
utility design and construction. The District will pay any utility permit and connection fees.
e. Coordinating with the City for any requirements for design and construction including driveways,
sidewalks, and required school-related pavement marking and signage.
f. Providing all construction work necessary to complete the improvements. Construction services
include execution of subcontracts; providing on-site support and logistics, including but not limited
to temporary construction office trailers and equipment; supervising and directing the work; ensuring
a safe project/site; coordinating the work with the different subcontractors in an efficient manner;
updating the monthly construction schedule; coordinating equipment start-up and acceptance testing;
training; preparing record construction documents; and close-out of the project.
Center Joint USD – Sierra Vista Elementary School Project
Request for Qualifications - Project #26-04
56104521.1/005484.00006
g. Planning and keeping budgets, estimates, costs and records in a way that maximizes the District’s
opportunity to gain reimbursement from the State Facility Program. Assisting the District in the
preparation of forms and exhibits and meeting OPSC staff if necessary to explain the design and
costs.
IV CRITICAL DATES
A. Submittal Due Dates:
Respondents shall submit SOQs in the format specified in Section VII below, which shall include the Questionnaire
form attached hereto as Exhibit B. N o t e t h a t t h e Q u e s t i o n n a i r e s e e k s i n f o r m a t i o n a s t o
both construction and design services. Each person, firm or other entity
comprising, forming, contracting with or otherwise participating in a Design-Build Entity must be identified in and
provide responses to the Questionnaire as relevant to its participation in the Design-Build Entity. Each shall be
submitted in a sealed envelope or box identifying the Respondent’s name and contact information, and the RFQ
number.
Completed SOQs are due no later than March 27, 2026 at 2:00 p.m. SOQs submitted after this time will not be
accepted and will be returned unopened. The District will evaluate and score all SOQs and will identify and notify
those Respondents that have been qualified to submit in response to the Request for Proposals.
Completed SOQs shall be delivered to:
Center Joint Unified School District – Attn: Richard Putnam
8408 Watt Avenue
Antelope, CA 95843
B. Tentative Selection Process Schedule:
The procurement is expected to progress according to the following timeline, but the District reserves the right to
change key dates and actions as the need arises:
February 23, 2026
March 13, 2026 @ 2:00 PM
March 20, 2026
March 27, 2026
April 3, 2026
April 13, 2026
April 24, 2026
May 1, 2026
May 8, 2026
May 18, 2026
May 28, 2026
June 17, 2026
February 1, 2029
RFQ Issued
Deadline to submit RFQ questions via email
Questions and answers related to RFQ and answers released
via Addenda
Deadline to submit RFQ
Shortlist and alternates published and RFP issued to
shortlisted teams
Confidential meeting times available if desired
Deadline to submit RFP questions via email
Questions related to RFP and answers released via Addenda
Final Proposals due
Anticipated Interview date (if utilized)
Anticipated District notification to intended awardee
Board adoption of DB agreement
Anticipated Completion of Sierra Vista Elementary
Center Joint USD – Sierra Vista Elementary School Project
Request for Qualifications - Project #26-04
56104521.1/005484.00006
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Number 26-54 Title Permanent Modular Building Design-Build Available Date 5/28/2026 2:00 PM...

Fresno Unified School District

Bid Due: 6/12/2026

...Follow B695 Tank Farm Revitalization-Design-Build Active Contract Opportunity Notice ID B673616... (hereinafter called ...

ENERGY, DEPARTMENT OF

Bid Due: 6/15/2026

...Project ID: 2026-RFP-0123 Title: Design-Build Services for a Hydrogen Fueling Station Addenda: 4... ...

City of Pasadena

Bid Due: 6/18/2026

...Project ID: 2026-RFP-0123 Title: Design-Build Services for a Hydrogen Fueling Station Addenda: 0... ...

City of Pasadena

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.