| Location: | Georgia |
|---|---|
| Posted: | Apr 28, 2026 |
| Due: | Jun 26, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66895-NONST-2026-000000048 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66895-NONST-2026-000000048 | PWPF Phase 2 Clearwell Improvements | Cumming, City Of |
Apr 28, 2026 @ 11:27 AM
|
Jun 26, 2026 @ 11:00 AM
|
Start Date: Apr 28, 2026 @ 11:27 AM ET
End Date:
Jun 26, 2026 @ 11:00 AM ET
PWPF Clearwell Improvements: The Project will involve furnishing all materials, labor, and equipment to install a new six (6) million-gallon clearwell, a new electrical building sized and arranged for future electrical upgrades, new yard piping connecting various parts of the proposed and existing facilities, and a new access road to this area. The electrical upgrades shall include coordinating contractor's scope of work with Georgia Power's scope to provide power prior to commissioning. Proposals for the construction of the project will be accepted at Cumming City Hall, 4th Floor Utility Department ¿ Front Desk located at 100 Main Street, 4th Floor, Suite 401, Cumming, GA 30040, no later than June 26, 2026, at 11:00 am EST. Any proposals received after this appointed time will be considered late and will be returned unopened to the Proposer. The Proposal due date can be changed only by addendum.
| Code | Description |
| 91356 | Construction, Utility and Underground Projects |
| 89087 | Water Treatment Equipment (Not Otherwise Classified) |
| 89052 | Removal Equipment, Water Treatment: Ammonia, Bacterial, Iron, Etc. |
| 89022 | Desalination Equipment, Water Treatment |
| 89017 | Contaminated Groundwater Treatment Equipment |
| 89016 | Complete Water Treatment Systems, Nonchemical: Ultraviolet Water Supply Sterilization, etc. |
| 89015 | Complete Water Treatment Systems, Chemical |
| 89007 | Centrifuges, Water Treatment |
| 89001 | Air Flotation Systems, Water Treatment Removal of Hydrocarbons |
| 96896 | Water and Wastewater Treatment Services |
| 96895 | Wastewater Treatment Plant, Operations, and Testing |
| 96892 | Water Supply Plant Operating and Monitoring System Services, Including Water Resources Development a |
| 91391 | Maintenance and Repair, Wastewater Treatment Plant |
| 91360 | Construction, Water System, Plants, Main and Service Line |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
David Valenzuela
david.valenzuela@stratusteam.com
(404) 425-7100

With GovernmentContracts, you can:
...Engineering 84571 Civil Engineering & Materials Testing Equipment 90740 Engineering Services, Non..., Architectural ...
State Government of Georgia
Bid Due: 8/17/2026
...: Non-State Agency Event Status: Open Purchase Type: Non-State Agency Category Type: Construction... ...
State Government of Georgia
Bid Due: 8/17/2026
...materials furnished by the County unless otherwise directed. Services include installation on active ...
State Government of Georgia
Bid Due: 8/19/2026
..., testing, and documentation of construction/investigative activities. Inspection activities ensure... Price (FFP), Time ...
DEPT OF DEFENSE
Bid Due: 7/31/2026