Heated Pressure Washer
| Location: |
Federal |
| Posted: |
Jul 30, 2025 |
| Due: |
Aug 5, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- 49 - Maintenance and Repair Shop Equipment
|
| Solicitation No: |
W911S225U1333 |
| Publication URL: |
To access bid details, please log in. |
Heated Pressure Washer
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
-
Updated Published Date: Jul 30, 2025 09:24 am CDT
-
Original Published Date: Jul 30, 2025 09:05 am CDT
-
Updated Date Offers Due: Aug 05, 2025 02:50 pm CDT
-
Original Date Offers Due: Aug 05, 2025 02:50 pm CDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Jul 30, 2026
-
Original Inactive Date:
Jul 30, 2026
-
Initiative:
Classification View Changes
Description View Changes
Amendment implemented to add Set aside code from N/A to Total Small Business Set-Aside and to change NAICS code from 423850 to 333415.all-electric, hot water, power washer systems with dual hose reels for each system. Standards and Regulationsa. ETL certified to UL1776, UL508A, CSA 22.2 No.68 and CSA C22.2 No. 14 standards.b. Meets the National Electric Code (NEC).c. OSHA compliant.Description. a. System shall meet all applicable OSHA standards and regulations.b. Elimination of pinch points is to be considered during design. Guards and plaques will be added where needed.c. Ease of maintenance shall be a design consideration for all portions.d. The design should utilize commercial-off-the-shelf items whenever possible to facilitate repair and replacement of worn and/or damaged parts.e. All exposed materials shall be coated/painted or made of nonferrous materials to prevent corrosion.f. 5.0 GPM at 3,000 psi. 140 deg Fg. 480 Volts, 3 phase, 60 Hertzh. Service power not to exceed 100 amps.i. 10.0 horsepower TEFC, 1750 rpm motor with 1.15 Service Factorj. Industrial grade triplex ceramic plunger pumpk. Two 30 KW electric heating elements and vessel NEMA 4 watertight main electrical enclosure with on off controls and indicator lights for the electric motor and heating element.l. Circuit breakers for the motor, primary transformer, and heating element circuits.m. 3/8 inch x 50 foot one wire braided hose.n. Pistol grip, trigger shut off gun with variable pressure lance and side handle.o. Three wash tips of 0 deg, 15 deg, and 25 deg angles.p. Detergent injector.q. High temperature limit switch, pressure relief valve, water flow switch, and temperature and pressure gauges.r. Hour meter and shut down timer.s. Heavy duty industrial steel frame with powder coat paint finish and lifting bar with dual lifting eyes.
Attachments/Links
Contact Information
Contracting Office Address
-
MICC FORT DRUM 4205 PO VALLEY RD
-
FORT DRUM , NY 13602-5220
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.