| Location: | Florida |
|---|---|
| Posted: | Nov 22, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EP25C0002 |
| Publication URL: | To access bid details, please log in. |
Project work consists of maintenance dredging Palm Beach Harbor within the Entrance Channel, Settling Basin, Extended Settling Basin, and the southern portion of the Expanded Settling Basin. All material is to be placed in the Beach Placement Area located immediately south of the inlet from November 1 through April 30. Incidental work includes, but is not limited to turbidity monitoring, screening, tilling, vibration control and monitoring, and environmental species monitoring. Project work consists of a base and three options. Coast Guard Certified dredging equipment is required.
| Nov 25, 2024 | [Award Notice (Updated)] PALM BEACH HARBOR MAINTENANCE DREDGING, ENTRANCE CHANNEL AND SETTLING BASIN, PALM BEACH COUNTY, FLORIDA |

With GovernmentContracts, you can:
...Request for Statement of Qualifications Environmental Architect-Engineering Services - Continuing...:00 AM Commodity Codes ...
State Government of Florida
Bid Due: 9/02/2026
...ENVIRONMENTAL ARCHITECURAL-ENGINEERING SERVICES CONTINUING CONTRACT FOR THE NORTHWEST FLORIDA REGION REFERENCE MATERIALS: No ...
Florida Department of State
Bid Due: 9/02/2026
...Description: COASTAL AND MARINE ENGINEERING ANNUAL SERVICES Department: Environmental Resources...
Palm Beach County
Bid Due: 10/31/2030
...Description: COASTAL AND MARINE ENGINEERING ANNUAL SERVICES Department: Environmental Resources...
Palm Beach County
Bid Due: 1/23/2030