Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP)
| Location: |
Tennessee |
| Posted: |
Jul 30, 2025 |
| Due: |
Aug 14, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- C - Architect and Engineering Services - Construction
|
| Solicitation No: |
W911S2126RA003 |
| Publication URL: |
To access bid details, please log in. |
Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP)
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Sources Sought (Original)
-
Original Published Date: Jul 30, 2025 02:40 pm EDT
-
Original Response Date: Aug 14, 2025 03:00 pm EDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Jul 30, 2026
-
Initiative:
Classification
Description
The existing Lacquer Preparation Facility at Holston Army Ammunition Plant, Kingsport, TN, comprising of Buildings 149/150 and a chemical/solvent storage tank farm, is the only facility capable of producing lacquer batches for the production of all plastic bonded explosives (PBX). The facility receives, stores, handles, and processes the binder materials and solvents in manufacturing the lacquer in explosives production. Mobile wagons are used to transfer lacquer from the facility to the explosives production buildings. Lacquer is a mixture of dissolved rubbery polymer materials in a solvent that is used as a binding agent in reducing the sensitivity of RDX, HMX, and TATB based explosives formulations. A plasticizer instead of lacquer may also be prepared in the facility to be used as a feedstock raw material in formulating RDX based explosives. The Lacquer Facility supports legacy explosives and the new Insensitive Munitions (IM) explosives being developed at HSAAP.This effort will require Architect-Engineering (A-E) design services for a new Lacquer Preparation Facility with all the necessary process equipment to support annual production capacity expansion with a minimum of 15M lbs of RDX and 2.5M lbs of HMX based formulations. This will ensure continuity of operations in maintaining the production capability, quality, safety, and environmental requirements to meet modern standards and permits. This new facility will support the expansion modernization of HSAAP RDX, HMX, and IMX production capacity to provide a viable capability to meet current/future DoD explosives production.
Attachments/Links
Contact Information
Contracting Office Address
-
MICC FORT DRUM 4205 PO VALLEY RD
-
FORT DRUM , NY 13602-5220
-
USA
Secondary Point of Contact
History
-
Jul 30, 2025 02:40 pm EDTSources Sought (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.