| Location: | Pennsylvania |
|---|---|
| Posted: | Dec 2, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | South Middleton Township Municipal Authority, Cumberland County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes all material, labor, and equipment necessary for the replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment. The project is located in South Middleton Township, Cumberland County.

With GovernmentContracts, you can:
.... prevailing time on July 1, 2026, for the following: Plant Pump Station ...
PennBid
Bid Due: 7/01/2026
...control measures in accordance with applicable requirements. 9) Provide parking lot pavement mill... ...
PennBid
Bid Due: 6/10/2026
...and replacement of existing access control system panels, new cards readers, and associated ...
PennBid
Bid Due: 6/22/2026
...and sedimentation control measures in accordance with applicable requirements. 9) Provide parking lot ...
PennBid
Bid Due: 6/10/2026