| Location: | Pennsylvania |
|---|---|
| Posted: | Dec 2, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | South Middleton Township Municipal Authority, Cumberland County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes all material, labor, and equipment necessary for the replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment. The project is located in South Middleton Township, Cumberland County.

With GovernmentContracts, you can:
...to, electrical demolition of the existing ferric chloride system, as well as electrical ...
Pittsburgh Water & Sewer Authority
Bid Due: 10/06/2026
...UP-Hammond Bldg. Demolition and Site Restoration Project Number 00-10682.00 DGS Number 800-312... and ...
Pennsylvania State University
Bid Due: 9/22/2026
...UP-Hammond Bldg. Demolition and Site Restoration Project Number 00-10682.00 DGS Number 800-312... and ...
Pennsylvania State University
Bid Due: 9/30/2026
...headwords building, new U.V Disinfection building, demolition of existing treatment plant and existing ...
PennBid
Bid Due: 9/23/2026