| Location: | Pennsylvania |
|---|---|
| Posted: | Dec 2, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | South Middleton Township Municipal Authority, Cumberland County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes all material, labor, and equipment necessary for the replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment. The project is located in South Middleton Township, Cumberland County.

With GovernmentContracts, you can:
.... * Excavation, stockpiling and backfilling. * Connection to existing electrical utilities * ...
PennBid
Bid Due: 6/19/2026
...Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical... ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
..., paving, lawn and concrete sidewalk restoration, installation of two Authority supplied simplex... ...
PennBid
Bid Due: 6/30/2026
...and its related components, and installation of a new hydraulic system with supporting ...
DEPT OF DEFENSE
Bid Due: 6/18/2026