Video Inspection and Cleaning of Linwood Gravity Sewer Main

Location: New Jersey
Posted: Apr 6, 2026
Due: May 7, 2026
Agency: Atlantic County Utilities Authority
Type of Government: State & Local
Category:
  • H - Quality Control, Testing, and Inspection Services
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Video Inspection and Cleaning of Linwood Gravity Sewer Main

Addenda: 0

Release Date: 4/3/2026

Due Date: 5/7/2026

Follow
Video Inspection and Cleaning of Linwood Gravity Sewer Main
Invitation For Bid
Engineering
Project ID: 2026-ITB-12
Release Date: Friday, April 3, 2026
· Due Date: Thursday, May 7, 2026 11:00am
Posted Monday, April 6, 2026 10:02am
All dates & times in Eastern Time
Draft Response No Bid30 days, 13 hours, 33 minutes


Post Information

Posted At:Mon, Apr 6, 2026 10:02 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

Bids are being solicited for the Video Inspection and Cleaning of ACUA's Linwood Gravity Sewer Main. The work includes, but is not limited to, Light Cleaning and/or Heavy Cleaning and Video Inspection (CCTV) of approximately 9,742 LF of ACUA's Gravity Sewer pipeline located in Linwood, NJ. The pipeline ranges in size from 30” to 33” diameter. All work shall be performed according to the plans and specifications.



Background

The Atlantic County Utilities Authority (ACUA) owns and operates a Solid Waste complex in Egg Harbor Township, Atlantic County, NJ, known as the Howard F. Haneman Environmental Park, and a Wastewater Treatment Facility in Atlantic City, Atlantic County, NJ, known as City Island Treatment Plant.

The Solid Waste facility is home to an active landfill, a recycling center, composting site, and ancillary facilities. Also on site is the ACUA’s primary administration building, constructed in 1992, which features a closed-loop geothermal HVAC system. The site is home to a 5.4 MW landfill methane gas to electricity project which provides 100% of the power needs of the Park. The ACUA’s solid waste complex is located at 6700 Delilah Road, in Egg Harbor Township, New Jersey. The site consists of approximately 360 acres with approximately 102 acres representing the landfill footprint.

The Wastewater Treatment Facility has been in operation since 1978 and services 14 communities in Atlantic County. It is home to the Jersey-Atlantic Wind Farm, a 7.5 MW wind farm that is privately owned and from which the ACUA purchases approximately 12 million kWh per year of electricity. In addition, the facility also houses a 500 kW solar PV system.

The ACUA is responsible to the residents of Atlantic County to be financially prudent and environmentally responsible.



Timeline

Release Project Date:
April 3, 2026
Question Submission Deadline:
April 21, 2026, 4:00pm
Response Submission Deadline:
May 7, 2026, 11:00am
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...lineal feet +/- of 12" diameter RCP Class V storm sewer pipe reaches; ...

Sayreville borough

Bid Due: 6/30/2026

...& Sewer Status: Open Description: Sealed bids shall be received by Isabel C. ...

City of Trenton

Bid Due: 6/10/2026

...of decorative site lights, water, sanitary sewer and electric utility upgrades, irrigation and ...

The City of Union City

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.