TAP-9901(558) SW District, City of Cole, Construct a new 5-foot-wide concrete sidewalk on the west side of Maple Street.

Location: Missouri
Posted: Mar 10, 2026
Due: Mar 25, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW TAP-9901(558) SW District, City of Cole, Construct a new 5-foot-wide concrete sidewalk on the west side of Maple Street. 3/6/26 3/25/26
Addendum 1 TAP-9901(558) SW District, City of Cole, Construct a new 5-foot-wide concrete sidewalk on the west side of Maple Street. 3/10/26 3/25/26

Attachment Preview

INVITATION TO BID
N. MAPLE STREET SIDEWALK IMPROVEMENTS
PHASE 2B
Sealed bids for the proposal for Construction for the west side of Maple Street will be received at: City of
Cole Camp, PO Box 36 (mail-in submission) or 401 W Main St (physical submission), Cole Camp, MO
65325, until 10 A.M. (prevailing local time) on the 25th day of March, 2026, at the Cole Camp City Hall, 401
W Main St, Cole Camp, MO 65325, and at that time will be publicly opened and read. All bids shall be
submitted as a Hard Copy.
The proposed work includes:
Construct a new 5-foot-wide concrete sidewalk on the west side of Maple Street. Sidewalks will comply with
ADA and required standards. Work includes, demolition of existing concrete walks, curbs and steps,
modifications to existing storm inlets and culverts. Installation of access curb ramps, pavement marking and
warning devices.
A digital copy of the plans and specifications may be purchased through the office of Great River
Engineering (GRE), at 2826 S. Ingram Mill, Springfield, MO 65804 (417-886-7171) upon payment of
$75.00, which is not refundable. All bidders must purchase plans through Great River Engineering, Inc. and
be on the plan holder list in order to bid the project.
This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required
to execute the contract as determined by the Missouri Department of Labor and Industrial Relations and
requires adherence to a schedule of minimum wages as determined by the United States Department of
Labor. For work performed anywhere on this project, the contractor and the contractor’s subcontractors
shall pay the higher of these two applicable wage rates. The applicable state wage rates for this contract
are detailed in “Annual Wage Order 31”, that is attached to this bidding document. The applicable federal
wage rates for this contract are the effective Davis-Bacon federal wage rates posted the tenth day before
the bid opening date and can be found at: https://sam.gov/content/wage-determinations. These
supplemental bidding documents have important legal consequences. It shall be conclusively presumed
that they are in the bidder's possession, and they have been reviewed and used by the bidder in the
preparation of any bid submitted on this project.
The City of Cole Camp hereby notifies all bidders that it will affirmatively ensure that in any contract entered
into pursuant to this advertisement, businesses owned and controlled by socially and economically
disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and
will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national
origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the current version of the
Missouri Standard Specifications for Highway Construction. The contractor questionnaire must be on file 7
days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works projects shall provide a
10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and
Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on
the construction project.
A certified cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
The City of Cole Camp reserves the right to reject any or all bids.
The project will be awarded to the lowest, responsive, responsible bidder.
CITY OF COLE CAMP
TAP-9901(558)
INVITATION TO BID
The DBE Goal for this project is 0%.
No 2nd tier subcontracting will be allowed on this project.
CITY OF COLE CAMP
TAP-9901(558)
INVITATION TO BID
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Status Bid Advertisement Post Date Revision Date Letting Date NEW KC District, Pettis ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/16/2026

...Status Bid Advertisement Post Date Revision Date Letting Date NEW NW District, Caldwell ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/30/2026

...Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, Polk ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/22/2026

...Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, City ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.