Midvale City 2025 Roadway and Utility Improvement Project

Location: Utah
Posted: Jun 10, 2025
Due: Jun 26, 2025
Agency: State Government of Utah
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: MID25-136
Publication URL: To access bid details, please log in.
Project: Midvale City 2025 Roadway and Utility Improvement Project
Ref. #: MID25-136
Department: CITIES - Midvale City
Type: ITB
Status:
Open
Open Date: Jun 10th 2025, 3:00 PM MDT
Questions Due Date: Jun 20th 2025, 5:00 PM MDT
Close Date: Jun 26th 2025, 5:00 PM MDT

Project Description: Midvale City is requesting bids from qualified Bidders for a Construction Contract known as: Midvale City 2025 Roadway and Utility Improvement Project. This project consists of the full roadway and utility reconstruction of Stagg Street, Smelter Street, and Depot Streets, which are located to the west of the Midvale Historic Main Street, along with related water and storm water utility upgrades within the adjacent Holden Street, Main Street and Center Streets. This project consists of the following:
The demolition and off-site removal of approximately 17,300 square feet of existing asphalt roadway, together with the demolition and disposal of approximately 2,000 linear feet of curb and gutter, 5,900 square feet of sidewalk, storm drain inlets and piping, and related appurtenances. The work also includes the demolition of existing chain link fence, and the salvage and protection of two existing sliding gates for reinstallation;
Furnishing and installation of approximately 2,500 linear feet of storm drain, together with storm drain inlets, manholes, drainage grates, drainage basins, and related appurtenances;
Furnishing and installation of approximately 4,200 linear feet of new 8-inch diameter culinary water main, service lateral replacement, fire hydrants, valves, and related appurtenances; and
Furnishing and installation of approximately 3,800 linear feet of new curb and gutter, 16,000 square feet of sidewalk, and 50,900 square feet of new asphalt roadway and base (which includes utility pavement restoration in the adjacent streets). The work also includes the furnishing and installation of new chain link fencing and the reinstallation of the two existing, salvaged sliding gates.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...existing chain link fabric no-climb fence with new paneled no-climb fence. Construction Cost ...

State Government of Utah

Bid Due: 6/23/2026

...) The construction of a 6' tall chain link fence around perimeter of ...

State Government of Utah

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.