| Location: | California |
|---|---|
| Posted: | Oct 16, 2025 |
| Due: | Oct 23, 2025 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 944108.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | RRUMC Nurse Call Replacement (PRIME PREQUALIFICATION) |
| Project Number | 944108.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a CM at Risk contract are sought from prospective prime contractor bidders (hereafter “bidders”) for the following project:
The project will replace the obsolete Rauland Responder IV nurse call system in the Ronald Reagan UCLA Medical Center (RRUMC). The project scope includes decommissioning of the existing Rauland Responder IV nurse call system throughout RRUMC, including disconnecting and removing Rauland nurse call buttons, consoles, and wall-mounted and bedside units; upgrades and modifications to the existing low-voltage electrical systems, including the installation of new receptacles, network cabling, conduits, and nurse call stations; installation of new Hill-Rom nurse call system components in patient rooms, bathrooms, hallways, and nurse stations, including new nurse call buttons near each patient bed, wall-mounted devices, consoles, display panels, and corridor and over-door lights; integration with other hospital systems, including alarm, paging and communication, electronic health records, and fire life safety systems; upgrade of communication consoles within individual distribution frame rooms; and testing and commissioning of all new Hill-Rom system components, including safety and compliance and backup power testing. Servers, handsets with pillow speaker buttons, and nurse call information technology software and hardware will be procured separately. There are staging impacts associated with this project. Sequencing will be completed by nursing unit and floor. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS; ADDENDA, IF ANY; PQ CONFERENCE SIGN-IN SHEET; ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $16,278,000.00 |
| 940026.01 |

With GovernmentContracts, you can:
...Pine Mountain Generator and Backup Battery COUNTY OF SONOMA 0000002158 Sell RFx 18 ...
County of Sonoma
Bid Due: 6/16/2026
...Pine Mountain Generator and Backup Battery COUNTY OF SONOMA 0000002158 Sell RFx 43 ...
County of Sonoma
Bid Due: 6/05/2026
...Houseyni (209) 937-8241 said.houseyni@stocktonca.gov Backup James Wong (209) 937-8110 james.wong...
City of Stockton
Bid Due: 7/02/2026
...: phebe.lapinig@dgs.ca.gov Backup Procurement Official: Jennifer Maier Phone: (279) 799-4117 Email...
State Government of California
Bid Due: 6/17/2026