| Location: | Illinois |
|---|---|
| Posted: | Oct 26, 2026 |
| Due: | Nov 9, 2026 |
| Agency: | City of Rock Island |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Title: |
Invitation to bid NEDPL 18-2026 Triplett
|
| Category: | Housing Programs |
| Status: | Open |
|
Invitation to Bid-Posted Date
Carpentry & Electrical
2948 12th Street
NEDPL 18-2026
Introduction
The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located
at 2948 12th Street. This owner-occupied property will be undergoing rehabilitation using Housing and
Urban Development (HUD) funds to ameliorate deteriorating and deteriorated conditions. All work shall
be subject to HUD 35.930 and Environmental Protection Agency (EPA) regulations. Contractors who are
interested in this project will need to schedule a site visit with the homeowner, Margie Triplett, by
calling them at 309-428-5199, prior to submitting the bid. Sealed bids must be received on or before
November 9th by 2p.m. They shall be addressed and marked as follows.
CED Department
Attn: Jeff Laxton
1528 3rd Avenue
Rock Island, IL 61201
ENCLOSED: 2948 12th Street Bid
Bids may be mailed or delivered in person. Late bids shall not be opened. All sealed bids shall be opened
on 11/9/2026 by 2 p.m. at City Hall in the CED Department offices. Contractors who have submitted
bids may attend but are not required to do so. A bid tabulation shall be posted online afterward. All
questions shall be directed to the Construction Officer at 309-732-2906.
Scope of Work
The bidder shall submit a project plan using the design standards below that is in compliance with all
applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The
plan must include a clear project timeline and budget with line item costs. The contractor shall act as the
general contractor for the project using subcontractors as required. Subcontractors that will be required
should be clearly identified in the project plan.
Remove all the windows on the first floor and the basement. Remove the storm windows. Install
new vinyl double hung windows that meet the energy code with the glazing. Windows shall be
installed per manufactures instructions. Insulate around the new window frames. Install new white
break metal over the new stops and existing brick moldings. All windows shall have each new unit
and J-channels caulked with white Quad upon competition. Make sure to take a picture of window
stickers for proof of energy numbers, incase the homeowner removes them before the building
inspector can verify. Replace the basement windows there are sliders and double hung. Sliders
should use a slurry to parged in frames on the exterior once they have been secured in the R.O. The
Double hung windows in the basement shall match the first-floor windows. All windows should have
half screens and safety latches ( Child sash locks). Repair the basement handrail. Brackets need to be
tightened up and screwed into solid backing capable of hold 200lbs of down pressure.
Electrical work in the basement has been rewired at one point however needs to be gone through
and brought up to code. The Panel needs knock-outs plugged/ covered the open spaces.
Co2/smokers need installed in the basement near gas fired appliances, one in the living room and
one in the hall outside the bedrooms. Install 4 LED motion lights at all 4 egresses. Replace the kitchen
light fixture with ceiling mounted LED. Replace the 2 bedrooms and living room with new ceiling
fan/light combos. Hunter or Harbor breeze fans are acceptable brands. Replace the hallway light
with new LED ceiling mounted fixture. Replace vanity light/surface mounted medicine cabinet, with
mirror and new vanity light above the mirror in the first-floor bathroom. Install a bath fan/light
combo that comes on with vanity light. This shall be vented to the exterior either through the roof or
soffit. Install missing switch and plate covers throughout the house. Electrical and building permit
require before work starts.
Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet
all project objectives. The contractor shall have 30 days to complete the work from the date of contract
signing. Change work orders over the course of the project are strongly discouraged.
Bidder Qualifications & Requirements
1. Bidders must be currently licensed with the Illinois Secretary of State, bonded, and insured.
2. Bidders must have or be able to obtain all applicable licenses and permits in addition to meeting
all local, state, and federal requirements to perform requested work. Contractors maybe
required additional plans upon permit submittals.
3. Bidders must have and provide proof of General Liability, Vehicle, and Workers Compensation
Insurances and name the City of Rock Island as a Certificate Holder.
4. Bidders must own or be able to rent sufficient equipment to complete the work.
5. Contractor maybe required to supply additional plans or stamped drawings for a plan
review. Which maybe need to obtain a building permit.
Preparation of Bid
Each bid must be submitted on paper and delivered in a sealed envelope. Said envelope shall be clearly
labeled with "ENCLOSED: 2948 12th Street Bid." The bid must clearly address all requirements as
described above. The cost of the work must be separated into line items with individual costs in addition
to providing a total project cost. Labor costs and material costs must be clearly delineated. The company
name, federal tax ID number, SAMs entity number, contact person, email, phone number, and a date
with signature are all required as well.
Awarding Contracts
The lowest bid shall not automatically guarantee that a contractor will get the work they bid on. Bids
shall be reviewed for pricing, experience, previous work history, references, State Licenses, State
Registration, insurances, bonds, subcontractors, equipment owned, equipment rented, operator
experience, and financial stability. The City at its sole discretion shall decide after a review which
contractor, if any, is responsive to the invitation to bid. All bidding and award procedures undertaken by
the City in regard to this project shall be consistent with the City's adopted procurement procedures.
Submitted bid prices shall remain valid for 60 days after bid opening.
Bidder Responsibility
Bidders shall keep the bidding process confidential. Each bidder shall be fully acquainted with conditions
relating to the site, the scope of work, any current EPA and HUD regulations pertaining to the work, and
restrictions associated with acceptable execution of requested work. Failure or omission of the bidder to
acquaint themselves with site conditions shall in no way relieve them of any obligation with respect to
their bid or subsequent contract.
Federal, State, and Local Reporting Compliance
The contractor shall provide financial and programmatic information as required by the City of Rock
Island to comply with all Federal, State, and local law reporting requirements. The contractor shall also
adhere to all applicable Federal, State and local regulations including but not limited to the following.
* US Department of Housing and Urban Development (HUD): 24 CFR 35
* US Environmental Protection Agency (EPA): 40 CFR 745
* US Occupational Safety and Health Administration (OSHA): 29 CFR 1926
Contact Information
The primary contact person for this project is the City's Construction Officer.
Jeff Laxton
CED Department
1528 3rd Avenue
Rock Island, IL 61201
309-732-2906
laxton.jeff@rigov.org

With GovernmentContracts, you can:
Follow FCI-GRE-FY27 QTR 2 SUBSISTENCE - KOSHER MENU Active Contract Opportunity Notice ID
JUSTICE, DEPARTMENT OF
Bid Due: 11/18/2026
Follow FCI GRE - FY27 QTR 2 SUBSISTENCE - HALAL MENU Active Contract
JUSTICE, DEPARTMENT OF
Bid Due: 11/18/2026
Bid Title: 912 S Martin Luther King Jr Avenue Category: Other Status: Open
City of Waukegan
Bid Due: 12/01/2026
Bid Title: WELL 5 MAINTENANCE BID TABULATION Category: Bid Results Status: Open Publication
Park Forest village
Bid Due: 11/28/2026