| Location: | Texas |
|---|---|
| Posted: | Mar 12, 2026 |
| Due: | Apr 17, 2026 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP_26-003 |
| Publication URL: | To access bid details, please log in. |
RFP_26-003
Posted
Darren King
(817) 515-1508
darren.king@tccd.edu
4/17/2026
2:00 PM
J2201
21+ Days for Solicitation Notice
CTCD
3/12/2026
3/12/2026 4:11 pm
90900-Building Construction Services, New (Incl. Maintenance And Repair Services);
91000-Building Maintenance, Installation And Repair Services;
91100-CONSTRUCTION AND UTILITIES, HIGHER EDUCATION;
91200-Construction Services, General (Incl. Maintenance And Repair Services);
District 2,
District 3,
District 9,
District 18,
District 23,
Tarrant County College District (TCCD) announces RFP #26-003: SE CampusSE-02 Structural Repairs & Improvements. The RFP proposal submission deadline is Friday, April 17, 2026, at 2:00PM local time. A virtual initial publicconference is scheduled for Tuesday, March 31, 2026, at 10:00 AM localtime. A non-mandatory walk-through isscheduled for Wednesday, April 01, 2026, at 2:00 PM local time. See our bid portal for more specificinformation, Bonfire: https://tccd.bonfirehub.com/. Darren King, Construction Purchasing Manager,darren.king@tccd.edu.
Tarrant County College District (TCCD) is soliciting proposals from qualifiedcontractors to perform structural, plumbing, mechanical, and electrical repairsat the Southeast Campus SE-02 facility located at 2100 Southeast Parkway inArlington, Texas. The project generally consists of structural steel andconcrete repairs, replacement of deteriorated below-slab sanitary piping,installation of crawlspace ventilation fans, and associated electricalconnections. Work will require coordination with existing building conditionsand may occur in or around occupied areas. The selected contractor shallprovide all labor, materials, equipment, supervision, permits, and incidentalsnecessary to complete the work in accordance with the construction documentsdated March 6, 2026 and all applicable codes and standards.
Estimated budget:$800,000.00 to $1,100,000.00

With GovernmentContracts, you can: