| Location: | Florida |
|---|---|
| Posted: | Apr 8, 2026 |
| Due: | Apr 15, 2026 |
| Agency: | City of Jacksonville |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 17791 |
| Publication URL: | To access bid details, please log in. |
| Title | Labor to Rebuild the Pump Room – Sandlewood High School Pool |
| Solicitation Type | ITQ |
| Status | Active |
| Buyer | Carmella Spitler |
| CSpitler@coj.net | |
| Synopsis |
Labor to rebuild the pump room, install new recirc pump, VFD controller, with interlocked chemical controller and feeders, new electrical sub panel, new maintenance pump and all new suction, discharge and waste plumbing. New DE separators and new filter grids in the collector tank.
|
| Open Date | 4/8/26 4:16 PM |
| Close Date | 4/15/26 4:00 PM |
| Posting Date | 4/8/26 |
| Solicitation PDF | Download |
| Pre-Bid Conference: |
None
|
| Pre-Bid Conference Date: | |
| Pre-Bid Conference Location: |
| Single Source Supplier: | |
| Single Source Amount: |

With GovernmentContracts, you can:
...includes addition of a permanent, independently powered surface-mounted backup pump capable... electrical control ...
State Government of Florida
Bid Due: 6/26/2026
...ancillary equipment, pump control panel, telemetry and SCADA equipment, site light, installation of ...
City of Jacksonville Beach
Bid Due: 6/17/2026