| Location: | California |
|---|---|
| Posted: | Jun 12, 2025 |
| Due: | Jun 24, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work is located within the Redwood Highway Frontage Road Utility Undergrounding District in Strawberry. The project includes horizontal directional drilling of dual conduits beneath Highway 101, joint trench excavation, dewatering, shoring, installation of conduit and utility substructures, minor concrete replacement, asphalt milling, and placement of hot mix asphalt (HMA). All conduit and substructures shall be completed in accordance with project requirements and utility company specifications and shall be ready to accept utility installations upon project completion. The contractor shall also prepare and submit all documentation necessary to obtain and comply with encroachment permits from Caltrans and the City of Mill Valley.
 See ENG 2018-19 - Redwood Highway Frontage Road Rule 20A Project for full details.

With GovernmentContracts, you can:
...level of the building. New electrical conduits and supports will be routed from ...
UCLA Capital Programs
Bid Due: 7/28/2026
...Follow USACE SPK DBB Construction - Natomas NPP - Sacramento, CA Active Contract ...
DEPT OF DEFENSE
Bid Due: 9/04/2026
...) of Avenida De Los Arboles, west of Highway 23, and will install ...
City of Thousand Oaks
Bid Due: 7/29/2026
...PRIMARILY OF STANDARD ELECTRICAL CONSTRUCTION, CONDUIT INSTALLATION, AND THE INTEGRATION OF COMMERCIAL... 19.15) ...
DEPT OF DEFENSE
Bid Due: 8/13/2026