| Location: | California |
|---|---|
| Posted: | Jun 12, 2025 |
| Due: | Jun 24, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work is located within the Redwood Highway Frontage Road Utility Undergrounding District in Strawberry. The project includes horizontal directional drilling of dual conduits beneath Highway 101, joint trench excavation, dewatering, shoring, installation of conduit and utility substructures, minor concrete replacement, asphalt milling, and placement of hot mix asphalt (HMA). All conduit and substructures shall be completed in accordance with project requirements and utility company specifications and shall be ready to accept utility installations upon project completion. The contractor shall also prepare and submit all documentation necessary to obtain and comply with encroachment permits from Caltrans and the City of Mill Valley.
 See ENG 2018-19 - Redwood Highway Frontage Road Rule 20A Project for full details.

With GovernmentContracts, you can:
...Project: Live Oak Canal Bridge Replacement at Sanders and Larkin Roads Ref. #: ...
Sutter County
Bid Due: 6/25/2026
...Project: Live Oak Canal Bridge Replacement at Sanders and Larkin Roads Ref. #: ...
Sutter County
Bid Due: 6/25/2026
...: Construction, Roads and Public Works Status: Open Description: The project is located ...
Napa County
Bid Due: 7/07/2026
...DOE_SPECS@WATER.CA.GOV TO BECOME A BIDDER This project includes excavation and backfilling... control, vegetation ...
State Government of California
Bid Due: 7/01/2026