SPECIFICATIONS
For
SANITARY SEWER PIPES REHABILITATION
CIPP LINING PROJECT
CITY OF RIVERVIEW, MICHIGAN
DATE: JULY 13, 2026
PREBID CONFERENCE: AUGUST 20, 2026
DUE DATE FOR BID: AUGUST 27, 2026
DELIVER BIDS TO: CITY OF RIVERVIEW
CLERK'S OFFICE
14100 CIVIC PARK DRIVE
RIVERVIEW, MICHIGAN 48193
RIVERVIEW BID No. 2565
CERCO PROJECT No. RV-324
PREPARED FOR: CITY OF RIVERVIEW
14100 CIVIC PARK DRIVE
RIVERVIEW, MICHIGAN 48193
PREPARED BY: C. E. RAINES COMPANY
17700 FORT STREET
RIVERVIEW, MICHIGAN 48193
(734) 285-7510
SANITARY SEWER PIPES REHABILITATION
CIPP LINING PROJECT
RIVERVIEW, MICHIGAN
CERCO Project No. RV-324
PROJECT MANUAL INDEX
Section 00100 - Advertisement for Bids
00200 - Instruction to Bidders
00300 - Part II Code of Ordinances - Chapter I (General Provisions)
00400 - Bid Form
00430 - Bid Bond
00500 - Agreement
00505 - Section 16-1 of the City Code
00506 - Identification of Form 1099 Vendors
00510 - Notice of Award
00550 - Notice to Proceed
00611 - Consent of Surety
00613 - Performance Bond
00614 - Payment Bond
00615 - Construction Contracts with Certain Public Agencies
00620 - Application for Payment Certificate
00622 - Sworn Statement
00623 - Certificates of Insurance
00625 - Certificate of Component Acceptance
00626 - Certificate of Substantial Completion
00627 - Certificate of Final Completion
00700 - General Conditions
00800 - Supplementary Conditions
DIVISION I - GENERAL REQUIREMENTS
Section 01110 - Summary of Work
01210 - Allowances
01270 - Measurement and Payment
01310 - Project Coordination
01320 - Audiovisual Tape Coverage
01330 - Submittals
01420 - Definitions and Standards
01450 - Quality Control Services
01770 - Contract Closeout
i
SANITARY SEWER PIPES REHABILITATION
CIPP LINING PROJECT
RIVERVIEW, MICHIGAN
CERCO Project No. RV-324
DIVISION II - SITE WORK AND UTILITIES
Section 02050 - Selective Demolition
02100 - Site Preparation
02200 - Earthwork
APPENDICES
APPENDIX I - Technical Specifications
APPENDIX II - Sanitary Sewer Pipe Segment Reports
APPENDIX III - Project Location Map & Plan Sheets
ii
ADVERTISEMENT FOR BID
SANITARY SEWER PIPES REHABILITATION
CIPP LINING PROJECT
CITY OF RIVERVIEW, MICHIGAN
City of Riverview Bid No. 2565
C. E. Raines Company Project No. RV-324
Sealed bids for the Sanitary Sewer Pipes Cured In Place Pipe Lining (CIPP) Rehabilitation Project in the City of
Riverview, Michigan will be received at the office of the City Clerk, 14100 Civic Park Drive, Riverview,
Michigan, 48193 until 2:00 P.M., local time, on Thursday, August 27, 2026, at which time and place said bids
shall be opened and publicly read aloud for the following sections and general items of work:
Provide cured in place rehabilitation of 30inch-48inch diameter sanitary sewer system piping in the City of
Riverview. Approximate Quantities:
SECTION I SECTION II
Construct 20 ft wide Stone Access Road - 3400 Lft CIPP Lining, 46 inch diameter - 572 Lft
CIPP Lining, 42 inch diameter - 3013 Lft CIPP Lining, 42 inch diameter - 217 Lft
CIPP Lining, 36 inch diameter - 2098 Lft
CIPP Lining, 30 inch diameter - 1300 Lft
Sealed envelopes containing three (3) copies of the bid shall be labeled as follows:
Bid: Sanitary Sewer Pipes Rehabilitation
CIPP Lining Project
City of Riverview, Michigan
City of Riverview Bid No. 2565
Project Number RV-324
Attn: Ms. Shane Harrison, City Clerk
Specifications and proposal forms under which the proposed work will be performed are on file and may be
examined at: Construction Association of Michigan, 43636 Woodward Avenue, P.O. Box 3204, Bloomfield Hills,
Michigan, 48302; Reed Construction Data electronic plan room at www.reedepr.com;
McGraw-Hill Construction/Dodge (MHC/Repromax, Motor City Imaging) 36060 Industrial Road, Livonia,
Michigan, 48150; Construction News Service, 1773 R.W. Berends Drive S.W., Wyoming, Michigan, 49519;
Construction News Corp., 7261 Engle Road, Suite 304, Cleveland, OH 44130-3479; Builders Exchange of
Michigan, 4461 Cascade Road S.E., Grand Rapids, Michigan, 49546 (49501), and the C. E. Raines Company,
17700 Fort Street, Riverview, Michigan 48193
Physical copies thereof for bidding purposes may be obtained from the C.E. Raines Company, 17700 Fort Street,
Riverview, Michigan 48193
Bids shall remain firm and may not be withdrawn for a period of ninety (90) days, following date of receipt.
To submit a bid for this project, prospective Bidders shall obtain Bid Documents from the C.E. Raines
Company.
Each bid proposal shall be accompanied by a Bid bond, certified check, cashier's check, or money order, executed
by the Bidder and Surety firm, licensed to perform business in the State of Michigan, and payable to the City of
Riverview in the amount of Five Percent (5%) of the accompanying bid. Proposal guarantee shall provide
assurance the Bidder will, upon acceptance of the bid, execute the necessary Contract with the City of Riverview.
The contractor under its current name (not the manufacturer) selected to perform this project must have a
minimum of 5 consecutive years of experience working with ambient cure CIPP products and a minimum of 1000
00100-1
installations totaling at least 500,000 feet of CIPP per year and have successfully installed at least 250,000 feet of
36 inch diameter or larger CIPP pipe in the last 5 years in municipal waste water collection systems in the lower
48 States. The successful contractor must also have a minimum of 5yrs of experience installing sectional liners
with a minimum of 500 installations in the State of Michigan. Documentation of the minimum requirements
including Owner, Project Name, location and date shall be included with the bid package.
The Contractor shall submit detailed references (project names, dates, owner contact names and numbers, project
descriptions with lengths installed, etc.) to the Engineer to demonstrate compliance with the above experience
requirements. The Contractor shall also submit project test results from those projects to document and confirm
the structural properties (flexural strength properties) that were achieved on those projects and thus can be
expected for this project. Contractors not meeting the above requirements shall be deemed unqualified and not
approved for this work.
The successful Bidder shall be required to furnish separate Performance, Labor and Material, and Payment Bonds,
each in the amount of one-hundred percent (100%) of the Contract amount.
No bid shall be withdrawn for a period of ninety (90) days following the date set for receipt, during which time
all bids shall remain in full force and effect. Proposals submitted after the exact time specified for receipt shall not
be considered, and proposals submitted by telephone, facsimile, or e-mail shall not be accepted.
The City of Riverview does not discriminate on the basis of race, color, religion, sex, or national origin and abides
by Title VI.
The OWNER reserves the right to reject any and all bids in its sole discretion, in whole or in part, for any reason
or for no reason at all, to waive any informality/technicality in bids received, and to award the contract to any
bidder, when such waiver is deemed to best serve the interest of the OWNER. A contract shall be awarded to the
lowest responsible and responsive Bidder as determined by the OWNER.
Should the successful Bidder fail to enter into a Contract with the OWNER and furnish the required bonds and
insurance documents within fifteen (15) days following award of the Contract, through no fault of the OWNER,
he shall forfeit the entire amount of his/her bid security to the OWNER.
A PRE-BID conference (Non-mandatory attendance) is scheduled for Thursday, August 20, 2026 10:00 A.M.,
local time at the offices of the OWNER (City of Riverview), 14100 Civic Park Drive, Riverview, Michigan,
48193. Representatives of the OWNER and ENGINEER will be present to discuss the project and receive
questions from prospective bidders, who are encouraged to attend and participate in the discussion. ENGINEER
shall transmit to all such Bidders of record such addenda as ENGINEER considers necessary to provide
clarification, in response to questions arising therein, or arising subsequent. Oral statements shall not be relied
upon and shall not be considered as legally effective or binding.
All inquiries shall be directed to C.E. Raines Company at telephone at 734-285-7510.
END OF SECTION
0010 0-2
SECTION 00200 - INSTRUCTION TO BIDDERS
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General Conditions and
Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings
indicated below which are applicable to both the singular and plural thereof:
A. Bidder: The individual or entity who submits a Bid directly to OWNER.
B. Issuing Office: The office from which the Bidding Documents are to be issued and where the bidding
procedures are to be administered.
C. Successful Bidder: The lowest responsible Bidder submitting a responsive Bid to whom OWNER (on
the basis of OWNER's evaluation as hereinafter provided) makes an award.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents for the purchase sum, if any, stated in the Advertisement or
Invitation to Bid may be obtained from the Issuing Office.
2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor ENGINEER
assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of
Bidding Documents.
2.03 OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only
for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 To demonstrate qualifications to perform the Work, each Bidder shall submit with Bid at Bid Opening
detailed written evidence of experience per Appendix I Technical Specifications for MH to MH CIPP
Lining-12 Contractor's Qualifications. Each Bidder shall also submit within five days after Bid opening
upon OWNER's request, detailed written evidence such as financial data, any additional requested
previous experience beyond the limits of Appendix I, present commitments, and other such data as may
be called for in Paragraph 3.02. Each Bid must contain evidence at a minimum of Bidder's qualification
per Appendix I Technical Specifications for MH to MH CIPP Lining-12 Contractor's Qualifications and
to do business in the state where the Project is located or covenant to obtain such qualification prior to
award of the Contract.
3.02 Each Bidder shall be prepared to submit to ENGINEER the following notarized statements pertaining to
his financial resources, adequacy of plant and equipment, organization, prior experience and other facts,
as his qualification to enter into contract with and to perform the Work for OWNER.
A. Organization: State legal title of organization, business address, and if a corporation, where
incorporated. Give names of principal officers and capitalization, number of and positions held by
supervisory employees, and number of employees regularly employed.
B. Financial Resources: Furnish complete financial statement.
C. Equipment Owned: Give manufacturer's name, description, size and/or capacity and age of each
piece or article of major equipment.
00200-1
D. Experience Record: Give names of parties and dates for which work has been done, general
description of work, and contract price of work performed. As well as required information to be
provided per Appendix I Technical Specifications for MH to MH CIPP Lining-12 Contractor's
Qualifications
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
4.01 It is the responsibility of each Bidder before submitting a Bid:
A. To examine and carefully study the Bidding Documents, including any Addenda and other related
data identified in the Bidding Documents (including "technical data" referred to in Paragraphs 4.02
through 4.05, inclusive);
B. To visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site
conditions that may affect cost, progress, and performance of the Work;
C. To become familiar with and satisfy Bidder as to all Federal, state, and local Laws and Regulations
that may affect cost, progress, and performance of the Work;
D. To promptly notify ENGINEER of all conflicts, errors, ambiguities, or discrepancies which Bidder
has discovered in or between the Contract Documents and such other related documents;
E. To obtain and carefully study (or assume responsibility for doing so) all additional or supplementary
examinations, investigations, explorations, tests, studies, and data concerning conditions (surface,
subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or
performance of the Work or which relate to any aspect of the means, methods, techniques, sequences,
and procedures of construction to be employed by Bidder, including any specific means, methods,
techniques, sequences, and procedures of construction expressly required by the Bidding Documents,
and safety precautions and programs incident thereto;
F. To agree at the time of submitting its Bid that no further examinations, investigations, explorations,
tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the
price bid and within the times and in accordance with the other terms and conditions of the Bidding
Documents;
G. To correlate the information known to Bidder, information and observations obtained from visits to the
Site, reports and drawings identified in the Bidding Documents, and all additional examinations,
investigations, explorations, tests, studies, and data with the Bidding Documents;
H. To determine that the Bidding Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for the performance of the Work;
I. To become aware of the general nature of the Work to be performed by OWNER and others at the Site
that relates to the Work as indicated in the Bidding Documents;
4.02 Subsurface and Physical Conditions (N/A)
4.03 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing
Underground Facilities at or contiguous to the Site is based upon information and data furnished to
OWNER and ENGINEER by owners of such Underground Facilities, including OWNER, or others.
00200-2
B. On request, OWNER will provide Bidder access to the Site to conduct such examinations,
investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid.
Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of
such explorations, investigations, tests, and studies.
4.04 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has
complied with every requirement of this Article 4, that without exception the Bid is premised upon
performing and furnishing the Work required by the Bidding Documents and applying any specific means,
methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly
required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors,
ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written
resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally
sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing
the Work.
4.05 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature
of other work that is to be performed at the Site by OWNER or others (such as utilities and other prime
contractors) that relates to the Work for which a Bid is to be submitted. On request, OWNER will provide to
each Bidder for examination access to or copies of Contract Documents (other than portions thereof related
to price) for such other work.
ARTICLE 5 - PRE-BID CONFERENCE
A (non-mandatory attendance) Pre-bid conference for the project will be held on Thursday,
August 20, 2026 at 10:00 a.m. at the offices of the OWNER (City of Riverview), 14100 Civic Park
Drive, Riverview, Michigan, 48193. Representatives of the OWNER and ENGINEER will be present to
discuss the Project in detail. Prospective bidders are responsible for attending the conference and
participating in the discussion, and shall submit any questions for clarification at that time. Instructions
and clarifications given at the pre-bid conference shall be recognized as valid bidding instructions and
shall be considered as part of the "Instructions to Bidders".
5.01 ENGINEER will transmit to all prospective Bidders of record such Addenda, as ENGINEER considers
necessary in response to questions arising at the conference. Oral statements may not be relied upon and will
not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto required for
temporary construction facilities, construction equipment, or storage of materials and equipment to be
incorporated in Work are to be obtained and paid for by the CONTRACTOR. Easements for permanent
structures or permanent changes in existing facilities are to be obtained and paid for by the OWNER unless
otherwise provided in the Bidding Documents.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in
writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions
will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the
Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be
answered. Only questions answered by Addenda will be binding. Oral and other interpretations or
clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by
OWNER or ENGINEER.
00200-3
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of five percent of
Bidder's maximum Bid price and in the form of a certified check, bank check, or a Bid Bond of the form
attached issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract
Documents, furnished the required contract security and met the other conditions of the Notice of Award,
whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the
Contract Documents and furnish the required contract security within ten days after the Notice of Award,
OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid
security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may
be retained by OWNER until the earlier of seven days after the Effective Date of the Agreement or 91 days
after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance of receiving the
award will be returned within seven days after the Bid opening.
ARTICLE 9 - CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) Substantially Completed,
(b) Milestones (if any), and (c) also completed and ready for final payment are set forth in the Agreement.
This document will be used to select contractors, to perform these services for a three (3) year
period with the option to renew for an additional two (2) year period. The Owner reserves the right
to waive any irregularities in the bid, and to award to other than the low bidder, if these actions are
deemed to be in the Owner's best interest.
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND "OR-EQUAL" ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the
Bidding Documents without consideration of possible substitute or "or-equal" items. Whenever it is
specified or described in the Bidding Documents that a substitute or "or-equal" item of material or
equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such
acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The
procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is
set forth in the General Conditions and may be supplemented in the General Requirements.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or
entities to be submitted to OWNER in advance of a specified date prior to the Effective Date of the
Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after
Bid opening, submit to OWNER a list of all such Subcontractors, Suppliers, individuals, or entities proposed
for those portions of the Work for which such identification is required. Such list shall be accompanied by
an experience statement with pertinent information regarding similar projects and other evidence of
qualification for each such Subcontractor, Supplier, individual, or entity if requested by OWNER. If
OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor,
Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent
Successful Bidder to submit a substitute, in which case apparent Successful Bidder shall submit an
00200-4
acceptable substitute. Bidder's Bid price will be increased (or decreased) by the difference in cost
occasioned by such substitution, and OWNER may consider such price adjustment in evaluating Bids and
making the contract award.
12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contract to
the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities.
Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of
any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or
ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed
acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of
the Agreement as provided in Paragraph 6.06 of the General Conditions.
12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against
whom CONTRACTOR has reasonable objection.
12.04 Using a sub-contractor (who must be clearly identified in the submittal) is only acceptable for up to 10% of
the total scope of the services. This includes a joint submission by two Proposer's having no formal
corporate connections or linkage. However, in this case one of these Proposers must be prepared to take
over all responsibility for successful performance of the contract and this should be clearly defined in the
proposal.
12.05 Sub-Contracting to any firm or individual who's current or past corporate or other interests may, in the
Owner's opinion; give rise to a conflict of interest in connection with this project will not be permitted.
12.06 Where applicable, the names of approved sub-contractors listed in the Document will be included in the
contract. No additional sub-contractors will be added or other changes made, to list in the contract without
the written consent of the Owner.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents. Additional copies may be obtained from
ENGINEER or Issuing Office.
13.02 All blanks on Bid Form shall be completed by printing in black ink or by typewriter and the Bid signed.
Changes on Bid Form shall be lined-out with Bidder's initials next to the change to signify and validate
change on Bid Form.
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other
corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and
attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be
shown below the signature.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must
appear under the signature), accompanied by evidence of authority to sign. The official address of the
partnership shall be shown below the signature.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and
accompanied by evidence of authority to sign. The state of formation of the firm and the official address of
the firm must be shown below the signature.
13.06 A Bid by an individual shall show the Bidder's name and official address.
13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on Bid Form. The
official address of the joint venture must be shown below the signature.
00200-5

With GovernmentContracts, you can:
...Energy Pipe System Support Inspection) Issue Date & Time 8/27/2026 02:00:03 PM (ET) ...
Lansing Board of Water & Light
Bid Due: 9/10/2026
...Bid Number: 26-022 Bid Title: Replacement of Swimming Pool Valves, Valve Seals, Valve ...
Macomb township
Bid Due: 9/24/2026
.... Conduct an initial topographic survey. Construct interior berms and install drainage pipes. ...
DEPT OF DEFENSE
Bid Due: 9/04/2026
...stoplogs have two 14-inch wafer style butterfly valves, 14-inch schedule 20 connecting pipes, ...
DEPT OF DEFENSE
Bid Due: 9/11/2026