| Location: | California |
|---|---|
| Posted: | Apr 23, 2025 |
| Due: | May 22, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Base Bid Project improvements will generally include construction to remove portions of the concrete channel walls of Corte Madera Creek downstream of Stadium Way pedestrian bridge, grading and earthwork to restore a natural creek bank, and installation of erosion and scour protection logs along the toe of the channel. Access will be through a temporary easement with the College of Marin, and work will be adjacent to the multi-use path and a residential neighborhood of Kentfield. Work within the dewatered creek channel is limited to take place between September 1st and October 15th.
See RFP - Corte Madera Creek Flood Risk Management Phase 1 Lower College Of Marin Restoration Project for full details.

With GovernmentContracts, you can:
...Concrete Restoration Department: Operations, Finance Category: Request for Bid, Notice of Intent... of ...
El Dorado Irrigation District
Bid Due: 10/02/2026
...concrete patch repair; tree canopy trimming and root pruning; landscape restoration; remodel catch ...
City of Los Angeles
Bid Due: 10/14/2026
...SERVICES, NEW NIGP 91003 Building Cleaning, Exterior NIGP 91008 Concrete Raising and Undersealing... ...
San Diego County Water Authority
Bid Due: 10/01/2026
...infrastructure, installation of valves and related appurtenances, limited removal and replacement of concrete... ...
Santa Cruz County
Bid Due: 10/15/2026