| Location: | California |
|---|---|
| Posted: | Apr 23, 2025 |
| Due: | May 22, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Base Bid Project improvements will generally include construction to remove portions of the concrete channel walls of Corte Madera Creek downstream of Stadium Way pedestrian bridge, grading and earthwork to restore a natural creek bank, and installation of erosion and scour protection logs along the toe of the channel. Access will be through a temporary easement with the College of Marin, and work will be adjacent to the multi-use path and a residential neighborhood of Kentfield. Work within the dewatered creek channel is limited to take place between September 1st and October 15th.
See RFP - Corte Madera Creek Flood Risk Management Phase 1 Lower College Of Marin Restoration Project for full details.

With GovernmentContracts, you can:
...of: culverts, rural roads, various types of fencing, stock ponds, small bridges, earthwork, ...
San Francisco Public Utilities Commission
Bid Due: 11/10/2026
...; Selective Demolition; Earthwork including excavation, placing compacted backfill and aggregate base...
State Government of California
Bid Due: 12/02/2026
.... The Work includes but is not limited to demolition, abatement, tree removals, ...
Ventura County
Bid Due: 11/10/2026
...surfacing machine 81101522 Professional engineering services - Civil engineering - Earthworks engineering...
State Government of California
Bid Due: 11/05/2026