Y1DA--Northport Mill and Fill Project. No. 632-25-001

Location: Federal
Posted: Feb 12, 2025
Due: Mar 5, 2025
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 36C24225B0009
Publication URL: To access bid details, please log in.
Follow
Y1DA--Northport Mill and Fill Project. No. 632-25-001
Active
Contract Opportunity
Notice ID
36C24225B0009
Related Notice
36C24225B0009
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
242-NETWORK CONTRACT OFFICE 02 (36C242)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Feb 12, 2025 09:48 am EST
  • Original Date Offers Due: Mar 05, 2025 10:00 am EST
  • Inactive Policy: Manual
  • Original Inactive Date: Jun 12, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
Description
Page 4 of 4

STATEMENT OF WORK
Mill And Fill Northport Parking Lots Phase 2
INTRODUCTION
The scope of this project is to perform mill, fill, concrete, sidewalk, ramps, and curb work for parking lots A, C, and Q at the Northport VAMC. The approximated square footage of all three parking lots is 145,000 square-feet. The attached drawing, Attachment A, within these contract documents outlines the scoped areas with approximate measurements and dimensions. All measurements and dimensions are to be verified in the field. Specifications are provided as Attachment B within these contract documents. Work is to include all labor and material for the removal of the top 3 layer of the asphalt road, trucking and disposal, and installation of 3 asphalt per the specifications. In addition, the striping of the roads, including the striping of the cross sections of roads/parking lot striping, in-kind striping to what is existing. Refer to Attachment A. Work is also to include sealing of all edges and seams of the asphalt at the end of work. All road and traffic signs are to be replaced in kind. Work is to be performed in phases per parking lot. Each parking lot must be completed prior to moving onto another parking lot, unless approved by the Contracting Officer Representative (COR) in writing. Addition or subtraction of striping and signs not noted in the contract documents require prior approval by COR.
Work is to be performed at VAMC Northport in accordance with the Statement of Work, Federal, State, and Local Codes. The period of performance for the above-mentioned project will begin with a Notice to Proceed (NTP) issued and shall not exceed 15 calendar days after NTP. This period of performance includes reasonable duration for all required submittals where required.
GENERAL REQUIREMENTS
General Contractor s (GC) employees and sub-contractor employees shall not enter the VA Medical Center site or project site without appropriate VA issued PIV badge. See Construction Security Requirements in the specifications for more full requirements.
The GC shall not proceed with mobilization or construction until after Veteran Affairs acceptance of all required submittals and coordination of drawings as required.
The following are required for this project:
Contractor to coordinate with the VA COR prior to any work. Contractor to coordinate any utility shutdowns with the COR.
Work to be completed as per SOW, drawings, specifications, and applicable VA Design Manual(s).
Removal and disposal of asphalt, concrete and any demolished materials from Northport VAMC.
All signs, including temporary signs to redirect traffic, are to be per VA Parking Design Manual.
During striping work, roads need to be closed with applicable signs posted to redirect traffic where required as per VA Parking Design Manual.
When performing night work, contractor to provide temporary lights for construction. Any areas in which traffic can enter needs to be fenced off to ensure no traffic will enter construction area.
All environmental controls are to remain in effect. Storm drains are to be protected in order to prevent debris from entering the stormwater system.
Contractor to provide daily construction field reports that outline the work done each day with available tools and manpower that include photographic evidence. A daily field report must be submitted to COR at the end of each shift.
All work can be completed during normal business hours of Monday Friday 8:00AM 5:00PM except for Parking Lot Q, which is to be completed from Friday 5:00PM Sunday 5:00AM or as approved by the COR.
The installation of all work will maintain a one-year warranty for any defects.

SAFETY PRECAUTIONS

The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthful working conditions for its employees.

Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property.

The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regard to exits and exit way access. Utility shutdowns shall not compromise security, communication or fire safety for occupants.

No flammable liquids shall be stored or used in the medical center.

The Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction, upon completion of project permits will be returned to COR for filing as appropriate.

All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.

Information Security/Privacy/ Records Management

This contract does not involve access to VA patient/employee information and does not involve access and/or connection to the VA information system.

VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information.
The Department of Veterans Affairs, VA must comply with all applicable privacy and confidentiality statutes and regulations. One of the requirements in VA is to have all personnel trained annually on privacy requirements. Privacy represents what must be protected by VA in the collection, use, and disclosure of personal information whether the medium is electronic, paper or verbal.

This document (20939 training) satisfies the basic privacy training requirement for a contractor, volunteer, or other personnel only if the individual does not use VA sensitive information or protected health information (PHI) in any form such as electronic or paper or have access to any VA computer system.
The Contracting Officer Representative (COR/ COTR/ Project Manager) is responsible to obtain this training from the contractor and to maintain according to the Records Control Schedule (RCS 10-1).
Attachments/Links
Contact Information
Contracting Office Address
  • 113 HOLLAND AVE
  • ALBANY , NY 12208
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Dec 11, 2024[Presolicitation (Original)] Y1DA--Northport Mill and Fill Project. No. 632-25-001
Feb 27, 2025[Solicitation (Updated)] Y1DA--Northport Mill and Fill Project. No. 632-25-001
Mar 16, 2025[Solicitation (Updated)] Y1DA--Northport Mill and Fill Project. No. 632-25-001
Mar 20, 2025[Solicitation (Updated)] Y1DA--Northport Mill and Fill Project. No. 632-25-001
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

..., BULK NAICS Code: 484220 - Specialized Freight (except Used Goods) Trucking, Local ...

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.