L1973 CENTRAL PARKING FACILITY OPTIMIZATION CMAR RFQ

Location: Massachusetts
Posted: Oct 1, 2026
Due: Nov 5, 2026
Agency: The Massachusetts Port Authority (Massport)
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: L1973
Publication URL: To access bid details, please log in.
Contract: L1973

L1973 CENTRAL PARKING FACILITY OPTIMIZATION CMAR RFQ

Contract:


L1973

Opportunity Type:


Construction Manager At Risk


If you would like to submit, please go to (BidExpress) .

Advertised Date:


10/07/2026
09:00:00 AM

Due Date:


11/05/2026
12:00:00 PM

Documents: Contact:

CPBidQuestions@massport.com

Attachment Preview

MASSACHUSETTS PORT AUTHORITY
CAPITAL PROGRAMS DEPARTMENT
SUITE 209S - LOGAN OFFICE CENTER
ONE HARBORSIDE DRIVE
EAST BOSTON, MASSACHUSETTS 02128-2909
REQUEST FOR QUALIFICATIONS
CONSTRUCTION MANAGEMENT AT RISK SERVICES
SUPPLEMENTAL INFORMATION PACKAGE
MPA CONTRACT NO. L1973
CENTRAL PARKING FACILITY OPTIMIZATION
LOGAN INTERNATIONAL AIRPORT
EAST BOSTON
OCTOBER 7, 2026

Article 1 - INTRODUCTION
1.1 CONSTRUCTION MANAGER at RISK (CMR) SCOPE OF WORK.
The MASSACHUSETTS PORT AUTHORITY (Massport) seeks to retain the services of a
highly qualified firm to provide Construction Management at Risk Services (CMR) on Project
L1973 - CENTRAL PARKING FACILITY OPTIMIZATION (the Project). An expanded scope
of Pre-Construction Services (Phase I), as well as Construction Services (Phase II) can be
found in Section 2.2 of this package.
The procedures utilized by Massport to procure construction management services will involve
an open, fair and competitive selection process which will ensure that the highest quality
construction services are provided to Massport at a fair and responsible price. The design of
the Project is currently in the Preliminary Design phase, and early concept documents are
included in this Supplement to the RFQ.
The project has a goal to substantially complete construction by Quarter 3, 2031. The
construction cost is currently estimated by Massport at approximately Three Hundred Million
Dollars ($300,000,000). The Agreement between the Authority and the selected CMR shall
require the CMR to deliver such construction services for the entire Project in accordance with
a Guaranteed Maximum Price (GMP). The Authority has evaluated the need for a project
labor agreement ("PLA"). Based on the evaluation, the Authority has determined that it
will include a PLA requirement for the project at the RFP stage.
1.2 REQUESTS FOR QUALIFICATIONS
In accordance with procedures approved by the Massachusetts Inspector General, Massport
has publicly advertised a Request for Qualifications ("RFQ") for Construction Management
Services. In accordance with the advertisement, the following Supplemental Information
Package is made part of the Request for Qualifications.
Qualification Statements will be addressed to Luciana Burdi, Intl. Assoc. AIA, CCM, MCPPO,
NAC, Chief Infrastructure Officer and be received no later than 12 NOON on November 5,
2026 via Bid Express https://www.bidexpress.com/businesses/27137/home. Subsequent to
that time, a Pre-Qualification Committee will review the Qualification Statements and shortlist
qualified firms. Further milestone dates can be found in Section 2.6 of this package. Further
electronic submission information can be found in Section 4.1 of this package.
1.3 EVALUATION CRITERIA AND SELECTION PROCESS
Upon review of the submitted Qualification Statements, Massport intends to develop a shortlist
of qualified Construction Management firms which will be invited to respond to a written
Request for Proposals (RFP). The shortlist of Construction Management firms will be based
on the following criteria:
1. Proposed CMR team
1 revision 03-20-2026

2. Project approach
3. Similar project experience
4. VDC & Lean Construction experience
5. CM-at-Risk with GMP experience including public projects
6. Safety record
7. Capacity and financial stability
8. Litigation and termination history
9. M/WBE compliance history and approach
It is highly desirable that the CMR has demonstrated experience in utilizing Lean approaches
in design and construction, including Last Planner(TM) System, Target Value Delivery, and
collaborative decision-making techniques, or has had long-term experience working
collaboratively with Architects and their consultants during the design and construction phases
of projects.
The CM shall be DCAMM-certified and provide an Update Statement as well as an affidavit
that the Statement of Qualifications being submitted in response to the RFQ is signed under
the pains and penalties of perjury. The CM shall also provide a letter from a surety company
confirming the CM firm's ability to provide performance and payment bonds in the full amount
of the construction estimate. Please note that having the document notarized does not fulfill
the requirement for signing under the pains and penalties of perjury.
Further explanation of the Evaluation Criteria and selection process as identified in the
Massport CM at Risk Procedures can be found in Section 3.2 of this Supplemental Package.
Article 2 - PROJECT SCOPE
The Central Parking Facility is one of two structures, together with the West Garage, that
comprise the Airport Central Parking Facility. The main vehicular entrance to the Central
Garage is through Level 1 of the West Garage. The precast concrete Central Garage structure
consists of eight levels, which are labeled G, 1, 2, 3, 4, 5, 6 and 7. The Central Garage is
connected to the West Garage by nine bridges: two on Levels 3 and 4, and one on each of
Levels 1, 2, 5, 6, and 7. Vehicles may leave the Central Garage by crossing any bridge to the
West Garage (although garage signage directs vehicles to the Central Garage's Level 2 to
exit). Vehicles within the West Garage may use a helical ramp at Level 2 to exit. All structures
associated with fee collection for the West and Central Garages are located within the West
Garage.
The Central Parking Facility has a parking capacity of approximately 7,000 cars that is open to
the public 24 hours per day, seven days per week. Additionally, there is an entrance
accessible to the public for parking purposes via the Arrivals roadway opposite Terminal C, as
well as one entering the Central Garage on its north face.
2 revision 03-20-2026

The Ground Level has served as a rideshare pickup/drop-off since October of 2019. As part of
Massport's TNC (Transportation Network Companies) initiatives, further modifications to the
garage have since been made to increase flow through the Ground Level with several
additional points of access/egress opened in the facade.
The Central Parking Facility Optimization project includes three main scopes for design and
construction:
Scope #1 - Garage Rehabilitation
The scope will involve drainage rehabilitation; structural repairs, including repairs to girders,
beams, columns, decks and expansion joints, interior frames and ramp structures, exterior
spandrels and garage facade, stairwells; and overhead lights, exit signs, and overhead sign
rehabilitation and/or replacement in the Central and West Garages.
Scope #2 - Wayfinding and Signage Upgrades
This project will also involve signage replacement and upgrades to align with the Authority's
new signage standards. The project will replace or upgrade all signage in and around the
central parking facility.
Scope #3 - Elevator Modernizations
The project will include the modernization of eight (8) elevators within the vertical circulation
cores in and around the Central Garage that are at the end of their useful life. These elevators
are critical infrastructure serving the traveling public and need to be carefully sequenced to
minimize any disruptions.
2.1 SCOPE OF SERVICES FOR THE DESIGNER
Massport has engaged the services of ARROWSTREET INC. as the prime consultant to
design the project and will act as the Owner's Representative for the CM at Risk during design
and construction. The selected CMR will be expected to work collaboratively with Massport
and its design team to efficiently complete the work under this Project.
2.2 SCOPE OF SERVICES FOR THE CM at RISK
The Authority intends to enter into two agreements with the selected CM at Risk Firm.
Phase I - An Agreement for Preconstruction Services
Phase II - An Agreement for Construction Phase Services
Virtual Design and Construction (VDC)
Massport recognizes the numerous benefits Virtual Design and Construction (VDC), will
provide to each phase of the facility life cycle. In an effort to realize the added value of these
benefits, the Designer and the CMR will be required to use VDC for this project. Successful
VDC Program implementation will require extensive planning, an organized, comprehensive
3 revision 03-20-2026

and collaborative approach, and adequate supporting infrastructure including knowledgeable
and experienced personnel, required software and hardware, communication protocols and
contractual agreements.
A BIM Execution Plan (BIMxP) will be formalized by the Designer and implemented and
optimized by the entire Team as highlighted in the 2025 Massport Virtual Design &
Construction, (VDC) Guide, and Building Information Modeling, (BIM) Standards. Project
Team, including CMR members shall attend workshops and meetings during all phases of the
project to execute and optimize, in a collaborative fashion, the formal planning procedure and
Project BIMxP.
The CMR VDC Manager should have demonstrated experience in developing BIM Execution
Plans, managing, directing and implementing VDC in more than 3 projects during pre-
construction and construction phase. CMR should also demonstrate that they have virtual
construction experience and 3D trade coordination.
The scope of services to be provided by the CMR firm during the preconstruction and
construction phases are described in the following sections:
2.2.1 Preconstruction Services
During the preconstruction period, the CMR will perform a number of tasks, which may
include:
* Document reviews
* Review and recommend revisions, if appropriate, to the project master Schedule,
Construction Budget and permitting plan developed by Massport or the Designer
* Ordering materials, equipment, supplies and appurtenances with long lead times
* Procurement of early trade work
* Preparation of a detailed and integrated resource and cost loaded CPM schedule
* Application of Lean approaches, including but not limited to the Last Planner(TM) System for
the design phase, Target Value Delivery, and collaborative decision making processes as
determined by Massport documentation, guidelines and contract
* Coordinate, with the Team, the development of a Virtual Model (BIM) for decision-
making and constructability
* The CMR PM shall work with the Team to define the BIM Execution Plan as determined
by Massport as per 2025 Massport Virtual Design & Construction, VDC Guide, and
Building Information Modeling, BIM Standards. Dividing the work into trade packages and
identifying any self-performed work
* Prequalification of Trade Contractors under CH149A
* Value Planning/Engineering and Constructability Reviews working collaboratively with
the design team
* Preparing and/or reviewing early shop drawing and other submittals
4 revision 03-20-2026

* Listing and negotiating assumptions and qualifications, including development of "Lump
Sum and/or Bid Items and Quantities" for all items of work.
* Preparation of detailed Cost Estimates and establishing the Schedule of Values
* Developing final phasing and sequencing plans for construction in conjunction with
Massport staff and tenants
* Processes for utilizing MPA's Project Management Information System
* Developing final staging plans and traffic flow plans for material delivery and
construction
* Negotiating trade contracts and subcontract agreements
2.2.2 Construction Phase Services
During the construction period, the CMR will be responsible for completing the Project in
accordance with the construction documents which will include, but not are necessarily limited
to, the following:
Construction Phase Services as per Article 2 - PROJECT SCOPE
In addition, the CMR is expected to apply Lean approaches, including Last Planner(TM) System
during the construction phase, Target Value Delivery, and collaborative decision-making
processes. The CMR shall continue to manage the BIM Execution Plan and use BIM to
develop and manage 3D spatial coordination (clash detection) with the trade contractors as
highlighted in the 2025 Massport Virtual Design & Construction, VDC Guide, and Building
Information Modeling, BIM Standards. Dividing the work into trade packages and identifying
any self-performed work in the Construction Phase Services Contract. At some point,
Massport may elect to use the BIM model for Facility Management and/or internal purposes.
The CM shall be expected to work closely with Massport's team including its Project Manager
and the design team throughout the design and construction phases in order to effectively
implement the project.
2.3 CONTRACTS FOR PRECONSTRUCTION SERVICES AND CONSTRUCTION PHASE
SERVICES
2.3.1 Preconstruction Services
The Authority is proposing to enter into a Contract with the selected CMR for
preconstruction services immediately following the selection process.
2.3.2 Construction Phase Services
The Authority will then enter into a Master Construction Services Agreement as soon as
possible.
5 revision 03-20-2026

Milestone Date
Pre-Qualification Briefing - Attendees must register for the webinar by using the Virtual link: October 13, 2026 @ 1:00 PM https://events.teams.microsoft.com/event/234bf055-44d2- 4b8f-aea4-c3a81b86e8dc@9eb9f7c2-9da5-4db8-aebc- 3b74b4fadcbb?source=copyLinkLegacyShareLinkDialog
Deadline for submission of written questions October 16, 2026 @ 12:00 PM
Official answers published by MPA October 23, 2026 @ 12:00 PM
RFQ Submission Deadline November 5, 2026 @ 12:00 PM
RFP Issues to Shortlisted CMR Firms December 2026
RFP Submission Deadline January 2027
Interviews with Shortlisted CMR Firms TBD
Construction Manager Selection January 2027
Execute Contract for Preconstruction Services Quarter 1, 2027
Execute Master Construction Services Agreement Quarter 2, 2027
Begin Construction Quarter 2, 2027
Substantial Completion Quarter 3, 2031

2.4 ESTIMATED CONSTRUCTION COST
The cost of construction is estimated by Massport at approximately THREE HUNDRED
MILLION DOLLARS ($300,000,000).
2.5 TRADE CONTRACT CLASSES OF WORK
Certain trade contractors shall be pre-qualified in accordance with sections 44A thru 44J of
Chapter 149A - Public Construction Alternative Delivery Methods of the General Laws of
Massachusetts.
2.6 SCHEDULE
The Authority is interested in working in partnership with the Engineer/Designer and the CMR
to finalize design and construct this Project in an efficient and cost effective manner.
The following dates have been targeted as significant milestones:
Milestone Date
Pre-Qualification Briefing - October 13, 2026 @ 1:00 PM
Attendees must register for https://events.teams.microsoft.com/event/234bf055-44d2-
the webinar by using the 4b8f-aea4-c3a81b86e8dc@9eb9f7c2-9da5-4db8-aebc-
Virtual link: 3b74b4fadcbb?source=copyLinkLegacyShareLinkDialog
Deadline for submission of
October 16, 2026 @ 12:00 PM
written questions
Official answers published by
October 23, 2026 @ 12:00 PM
MPA
RFQ Submission Deadline November 5, 2026 @ 12:00 PM
RFP Issues to Shortlisted CMR
December 2026
Firms
RFP Submission Deadline January 2027
Interviews with Shortlisted CMR
TBD
Firms
Construction Manager
January 2027
Selection
Execute Contract for
Quarter 1, 2027
Preconstruction Services
Execute Master Construction
Quarter 2, 2027
Services Agreement
Begin Construction Quarter 2, 2027
Substantial Completion Quarter 3, 2031
6 revision 03-20-2026

Article 3 - SELECTION PROCESS & QUALIFICATION SUBMISSION
3.1 INTRODUCTION
Massport has established a TWO PHASE PROCESS for the selection of a Construction
Manager at Risk firm, hereinafter referred to as the CMR with whom it may enter into a
contract to provide construction management services for a particular project. At the Phase I
Qualifications stage, the Prequalification Committee will conduct a qualifications based
evaluation of interested CMR firms in order to create a shortlist of competent CMR firms.
Phase II will invite the shortlisted CMR firms to respond to a written RFP which will require
both a technical proposal and a pricing proposal including the proposed fee. A Selection
Committee will review Proposals in order to rank the shortlisted firms and make the final
selection.
3.2 QUALIFICATION SUBMISSION
In response to the RFQ, the Respondents are advised to keep their submission concise, clear,
and well organized. Graphic clarity and quality are important.
Massport reserves the right to disqualify any Respondent that does not follow these
submission instructions and the specific instructions identified in the RFQ.
The respondents must include in their submission two PDF files: one PDF covering items 1-14
of this Section 3.2; a second PDF covering the "General Business Financial Information and
Litigation and Termination History," as set forth and required in the RFQ. Please review Article
4 for Electronic Submission Requirements.
RFQ PART 1
A PDF containing all information and materials required for the following components of the
RFQ. Scans of the Executed versions must be included for any documents requiring
signature.
1. Cover Letter. As part of the Cover Letter, the Respondent should prepare and include an
Executive Summary of the Proposal. This section should highlight the key elements of your
proposal, and be clear, concise and informative. This section is your opportunity to highlight
and focus on the reasons why your team should be selected for this assignment. The
Responder should specifically address each of the evaluation criteria and take this
opportunity to highlight the reasons that the Responder feels it is best qualified for this
assignment in the context of the evaluation criteria set forth in this RFQ. The Respondent
shall acknowledge and agree on the PLA.
7 revision 03-20-2026

The words, "signed under the pains and penalties of perjury by" MUST appear
immediately above the authorized signature. The pains and penalties statement on the
DCAMM Update Statement does not meet this requirement.
2. Executive Summary. This section should summarize the response to each evaluation
criterion as well as the key elements and factors that may differentiate the firm from other
Responders. The Executive Summary should highlight the key aspects of the Respondents
RFQ response, and should summarize the key reasons that the proposed CMR Team should
be considered for the shortlist. The respondents are encouraged to use this section to
convince the Selection Committee to shortlist the proposed CMR Team.
3. Proposed CMR Team. This Section should include a narrative identifying key project
personnel and is encouraged to include any CCM Designated Personnel
(https://www.cmaanet.org/certification/ccm), LCI-CPC certified personnel
((https://leanconstruction.org/lean-certification/), as well as any key subcontractors and their
respective roles and responsibilities. The narrative should be augmented with a graphic
and/or organization chart that clearly illustrates the roles, responsibilities and organization of
the proposed Team.
If the proposed CMR Entity and/or CMR Team is a Joint Venture, this should be clearly
reflected in the Organization Chart, cover letter, and financial/litigation history. In addition, the
following should be addressed regarding the Joint Venture:
a) A narrative describing the management structure, members and the roles/responsibilities
of the JV
b) A narrative describing the purpose and reasoning of the proposed JV
c) A narrative describing the commercial constructs of the JV
d) A brief narrative describing the advantages of the JV to Massport
Please be advised that firms considering Joint Venture opportunities must do so during the
Qualification process. Joint Venture CMR Teams that do not submit during the Qualification
process shall not be considered for award during the RFP process.
4. Project Approach. This Section should include a narrative that outlines the CMR's
approach to the organization of the work; management and coordination activities; approach
to bidding multiple bid packages; approach to coordination with the design team and
Massport; approach to phasing; staging and sequencing; approach to coordination with
stakeholders; methodology to maintain uninterrupted neighborhood and abutter operations
during construction. The Respondents are encouraged to employ graphics that illustrate their
unique ability to perform the required services.
5. Similar Project Experience. This Section should include information regarding the firm's
recent relevant experience for the construction and construction management of prior similarly
scaled projects in urban areas and their experience and credentials working with Port
Authorities, Design Teams, and other stakeholders.
8 revision 03-20-2026

The Respondent's submission must include a minimum of three similar recent relevant
projects, including references and contact information from the owners and designers of those
projects. The Respondent should include a matrix that communicates the specific roles and
responsibilities of those staff that they proposed for this project, and the roles, responsibilities
and project experience as they relate to the specific projects submitted as recent relevant
experience.
6. Virtual Design and Construction (VDC) & Lean Construction Experience.
This Section should discuss and highlights the CMR high degree of competence and skill
using VDC techniques to manage, direct, implement and coordinate project information in all
phases of Design and Construction. The CMR should also identify specific BIM procedures
and protocols used in order to define and track project benefits.
CMR should demonstrate an understanding of LEAN construction principles, including their
application and benefits. This could be reflected in their project history, certifications, or
training programs for employees, including, but not limited to, LCI-CPC Certification
(https://leanconstruction.org/lean-certification/). CMR should emphasize teamwork,
communication, and collaboration with all project stakeholders, including engineer,
subcontractors, and client. This ensures a shared understanding of goals and encourages
open problem-solving. CMR who is committed to continuous improvement and actively seek
feedback from stakeholders. CMR should be open to identifying and addressing areas for
improvement and have a track record of implementing LEAN practices on their projects. CMR
should demonstrate the ability to implement LEAN practices and tools, such as Last Planner
System (LPS), visual management techniques, and waste reduction strategies into the
project.
7. CM at Risk with GMP Experience including public projects. This Section should
discuss and highlight the firm's experience for prior CMR projects including references and
contact information from the owners and designers of such projects and specifically identify
which projects were undertaken within the constructs of Ch 149a. The Respondent should
highlight those representative projects that were undertaken within the alternative deliver
method of the CM at Risk format with an ultimate GMP and with providing preconstruction and
construction services. The respondent should also describe any adjustments to the GMP that
were necessary throughout the course of the selected projects, and why they were needed.
8. Safety Record. This Section should include information on the firm's workers'
compensation experience modifier or similar data for the prior 5 years. If applicable, provide a
list of any OSHA fines and violations, including nature of the fine/violation, date, fine amount, if
any, and disposition of the fine/violation. The ideal format is a table or chart that summarizes
this information.
9. Capacity and Financial Stability. This Section should include information summarizing
the Respondent's capacity to undertake the work and address the overall financial stability of
the firm. An overview should be provided in this section. Detailed financial information shall be
submitted under separate cover ("RFQ Part 2") and in accordance with the instructions in this
RFQ as further identified below.
9 revision 03-20-2026

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Construction Project Bid Opening Date: 11/23/2026 03:00:00 PM Purchaser: Cesar Calouro Organization: Town... ...

Commonwealth of Massachusetts

Bid Due: 11/23/2026

...IFB - Sidewalk Construction Services The Town of Dennis is accepting bids for ...

Town of Dennis

Bid Due: 12/01/2026

...Header Information Bid Number: BD-27-1708-422-422-135322 Description: Sidewalk Construction... is accepting bids for Sidewalk ...

Commonwealth of Massachusetts

Bid Due: 12/01/2026

...FLAGSHIP WHARF BULKHEAD REPAIRS CONSTRUCTION Posted: 11/02/2026 - 9:00am Due: 12/10/2026 - 12:00pm... ...

City of Boston

Bid Due: 12/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.