| Location: | California |
|---|---|
| Posted: | Oct 1, 2026 |
| Due: | Nov 11, 2026 |
| Agency: | East Bay Municipal Utility District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The East Bay Municipal Utility District (District) is seeking a multi-disciplinary consultant team to perform a pre-design study for a Medium Voltage Raw Water Pumping Plant with four pumps ranging from 700 to 2000 HP, and a 12-kV substation in Lafayette, CA. The project goal is to address voltage drop and motor starting issues and establish criteria for electrical and mechanical rehabilitation upgrades for this critical 50-year old facility.
Please respond to this RFP no later than 4:00 p.m. on Wednesday, November 11, 2026.
QuestionsFor questions regarding this RFP, please contact Alejandro Joaquin, Associate Civil Engineer at alejandro.joaquin@ebmud.com. Questions must be received no later than 2:00 p.m. on November 4, 2026.
| Document | Type | Size |
| RFP 524 26 01 Moraga Raw Water PP Pre Design Services | 1.4 MB |
REQUEST FOR PROPOSAL (RFP) No.
524-26-01
Moraga Raw Water Pumping Plant
Rehabilitation and Upgrades Pre-
design Services
ADDENDA
Prospective bidders are responsible for reviewing any
published addenda regarding this bid at
ebmud.com/business-center/
CONTACT
Alejandro Joaquin, Associate Civil Engineer
(510) 287-0965
alejandro.joaquin@ebmud.com
RESPONSE DUE
November 11, 2026
4:00 p.m. PST
SUBMIT ELECTRONICALLY TO*
Alejandro Joaquin, Associate Civil Engineer
alejandro.joaquin@ebmud.com
*Hardcopy proposals will not be accepted
375 ELEVENTH STREET . OAKLAND . CA 94607-4240 . WWW.EBMUD.COM/BUSINESS-CENTER/
EAST BAY MUNICIPAL UTILITY DISTRICT
RFP for Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
TABLE OF CONTENTS
I. STATEMENT OF WORK
A. SCOPE
B. BACKGROUND
C. PROPOSER QUALIFICATIONS
D. SPECIFIC REQUIREMENTS
II. CALENDAR OF EVENTS
A. SITE WALK
III. DISTRICT PROCEDURES, TERMS, AND CONDITIONS
A. RFP ACCEPTANCE AND AWARD
B. EVALUATION CRITERIA/SELECTION COMMITTEE
C. PRICING
D. NOTICE OF INTENT TO AWARD AND PROTESTS
E. INVOICING
IV. RFP RESPONSE SUBMITTAL INSTRUCTIONS AND INFORMATION
A. DISTRICT CONTACTS
B. SUBMITTAL OF RFP RESPONSE
C. RESPONSE FORMAT
ATTACHMENTS
EXHIBIT A - RFP RESPONSE PACKET
EXHIBIT B - INSURANCE REQUIREMENTS
EXHIBIT C - STANDARD CONSULTING AND PROFESSIONAL SERVICES AGREEMENT TEMPLATE
EXHIBIT D - IRAN CONTRACTING ACT CERTIFICATION
EXHIBIT E - REFERENCE DOCUMENTS
EXHIBIT F - INFORMATION TECHNOLOGY SECURITY INFORMATION TO BE EXCLUDED FROM
PUBLIC RECORDS ACT REQUESTS
REV 5/13/26
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
I. STATEMENT OF WORK
A. SCOPE
Project Purpose
East Bay Municipal Utility District (District) intends to rehabilitate and upgrade the
Moraga Raw Water Pumping Plant (RWPP) to address an existing voltage-drop issue and
improve the reliability, operability, and maintainability of the facility. The purpose of
this pre-design effort is to identify and evaluate alternatives, select the most cost-
effective approach, and develop the electrical and mechanical design criteria needed for
a design phase to follow.
Scope of Work
It is the intent of these specifications, terms, and conditions to describe pre-design
services for the Moraga RWPP.
The scope of work includes the following services:
* Conduct a comprehensive evaluation of the existing voltage drop issues and
motor-starting issues, including conditions on both the District's and Pacific Gas
and Electric's (PG&E's) side of the electric meter. Develop and assess alternatives
and recommend short-term and long-term solutions.
* Perfom a condition assessment of existing electrical equipment for the Moraga
RWPP and 12kV substation and recommend design criteria for reliability
improvements.
* Perform a condition assessment of the existing mechanical equipment and
dechlorination system at the Moraga RWPP and recommend design criteria for
reliability improvements. The condition assessment shall include performance
testing and vibration analysis for the existing pumps.
* Conduct workshops with District stakeholders to review alternatives and
establish consensus of design goals.
* Prepare technical memoranda to document findings and provide design criteria,
preliminary design schematics and layouts, project implementation schedule,
sequencing considerations, and cost estimates.
The District intends to award a one-year contract to the Proposer that best meets the
District's requirements.
B. BACKGROUND
The Moraga RWPP consists of a partially buried pumping plant building and dedicated
above-grade 12kV substation located at 3462 School Street in Lafayette, alongside the
Las Trampas Creek on the Lafayette/Moraga Regional Trail. Figure 1 below shows the
Moraga RWPP site.
RFP NO. 524-26-01
Page 3
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
Figure 1: Moraga RWPP location
The Moraga RWPP was constructed in 1973 to deliver water from the Lafayette
Aqueducts to the Moraga Aqueduct No. 2 and into an outfall with an energy dissipater
on Moraga Creek, which conveys water into in the Upper San Leandro (USL) Reservoir
for subsequent treatment at the USL Water Treatment Plant (WTP). Although the
District operates the Moraga RWPP intermittently, it is a critical component of the
District's water supply system. When local runoff is insufficient to maintain USL
Reservoir at levels needed for water supply operations, the Moraga RWPP conveys
Mokelumne River water to the reservoir.
During droughts, the Moraga RWPP conveys supplemental Sacramento River water
through the Folsom South Canal Connection (FSCC) to USL Reservoir for treatment at
USL WTP, which is critical for treating the District's use of the available drought supply.
The Moraga RWPP has operated during 9 of the past 20 years (2007-2026), most
recently in 2022. When operated, the pumping plant typically operates continuously, 24
hours per day, for periods ranging from approximately one to six months.
During operation, power issues have resulted in pump trips and frequent restarts. For
example, during the August-October 2022 operating period, the pumps required
approximately 12 restarts due to power-related issues.
The pumping plant structure and 12kV substation are near the Las Trampas Creek bank
adjacent to a residential neighborhood in Lafayette. The District is conducting flood risk
RFP NO. 524-26-01
Page 4
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
and geotechnical evaluations of the site, which will be documented in technical
memoranda (TM) with completion anticipated by Spring 2027. There is visual evidence
of ground settlement on the Moraga RWPP site. A recent site assessment determined
that relocation of the structures is not necessary.
The pumping plant structure is a muti-level, partially buried concrete structure. The
above-grade substation is enclosed by concrete walls for security because both
structures are adjacent to a public trail. Figure 2 shows the interior of the pumping plant
and Figure 3 shows the substation.
Figure 2: Moraga RWPP
Figure 3: 12 kV Substation
RFP NO. 524-26-01
Page 5
| Unit | RPM | HP | Capacity (MGD) |
|---|---|---|---|
| 1 | 1200 | 700 | 11 |
| 2 | 1200 | 1250 | 27 |
| 3 | 900 | 2000 | 46 |
| 4 | 900 | 2000 | 46 |
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
The Moraga RWPP currently operates at electrical capacity, with only two pumps
capable of operating at a given time. The large inrush current associated with starting
the synchronous motors can cause significant voltage drops on the PG&E distribution
system. These conditions do not meet applicable PG&E requirements and can result in
pump trips, particularly during periods of high local electrical demand.
District Operations staff must coordinate closely with PG&E to minimize impacts to the
surrounding community. Pump starts are generally scheduled during periods of low
electrical demand, which limits the District's operational flexibility.
The motor starting problem has been known since the 1980s, but the impacts have
worsened as a result of local residential and commercial development, increased
quantity of electronic devices requiring higher power quality, increased frequency and
severity of extreme heat events, and increased wildfire hazard which affects PG&E's
protection schemes. Pump trips due to voltage drops are most prevalent during the
summer demand periods, which also present challenging conditions for maintaining
system voltage.
In 2006, the District submitted a Feasibility Study request to PG&E to identify
distribution and transmission options to address the motor starting concerns. A
preliminary investigation by PG&E determined a new dedicated distribution feed or
installation of an upsized 115 kV transmission line was not feasible. No further
discussions or follow-up actions were taken at that time.
Existing Pumping Plant
The pumps at the Moraga RWPP were manufactured by Byron Jackson in 1973. They are
water-cooled vertical turbine pumps with synchronous motors. Rated capacities for
each unit are shown in Table 1. The RWPP has space for an additional pump; however,
the existing pumps and capacity are currently sufficient for the District's needs.
Table 1: Moraga Raw Water Pumps
Unit RPM HP Capacity (MGD)
1 1200 700 11
2 1200 1250 27
3 900 2000 46
4 900 2000 46
The pumps are operated intermittently. As discussed above, electrical constraints
require that only two pumps run at a time. In addition, the two larger units, Unit 3 and 4
cannot be run together due to electrical capacity and hydraulic constraints. Maximum
discharge from the pumping plant is limited to approximately 62 MGD due to limitations
on the energy dissipater structure at the discharge point.
RFP NO. 524-26-01
Page 6
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
The pumps are supplied from the Lafayette Aqueducts with typical suction pressure of
approximately 40 pounds per square inch (psi) and discharge to the Moraga Aqueduct
No. 2 with typical discharge pressure of approximately 130 psi. Depending on
operational needs, water conveyed through the Lafayette Aqueducts may contain
chlorine, in which case the discharge to the Moraga Creek is dechlorinated using the
existing chemical system located within the pumping plant.
The pumping plant structure retains most of its original heating, ventilation, and cooling
(HVAC), elevator, crane, sump pump and other ancillary systems.
C. PROPOSER QUALIFICATIONS
1. Proposer Minimum Qualifications
The proposed key team members shall meet the following qualifications:
a. Project Manager shall have experience with water treatment plant or
distribution facility rehabilitations, coordination with PG&E and
demonstrate experience with developing, assessing, and presenting
alternatives and gaining consensus from stakeholders in at least two (2)
municipal capital projects with a total value of $10M or more in the last
ten (10) years.
b. Lead Electrical Engineer shall have experience with medium voltage
electrical, power, and control systems design, shall have designed at least
two (2) pumping plants rated at 500 horsepower (hp) or higher in the last
ten (10) years, and shall have experience with PG&E coordination for at
least two (2) projects in the last ten (10) years.
c. Lead Mechanical Engineer shall have experience with process evaluation
and facilities planning for retrofits and rehabilitations of at least two (2)
pumping plants rated at 500 hp or higher in the last ten (10) years.
d. Technical Specialist for Pump Natural Frequency and Vibration Analysis
shall have experience evaluating pump natural frequencies and vibration
characteristics for pumps and pump/motor systems, including applications
using variable frequency drives (VFDs) at minimum of two (2) pumping
plants rated at 500 hp or higher in the last ten (10) years.
e. Proposer shall possess all the credentials necessary to perform services as
specified under this RFP.
D. SPECIFIC REQUIREMENTS
The following sections provide the major scope items to be included and assumptions
for services required for the project.
RFP NO. 524-26-01
Page 7
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
Summary List Technical Memoranda (TM):
The following is a list of the TMs (deliverables) that the Proposer are required to complete and
are further described in the lists of Proposer tasks:
* Existing Conditions TM
* Power Reliability Improvements TM
* Electrical System Reliability and Safety Assessment TM
* Pumps, HVAC, and Mechanical Assessment TM
Task 1 - Document Review and Field Verification
The Proposer shall:
A. Review existing drawings, reports, product manuals, one-lines, protection settings,
standard operation procedures, historical operating data and equipment nameplates.
B. Perform site visits to verify equipment configurations, settings, condition, and any site
constraints that may affect future improvements including:
1. Switchgear
2. Motor control centers (MCCs)
3. Pumps, motors, and valves
4. HVAC systems
C. Develop P&ID of existing pumps, surge/relief line, HVAC, sump pumps, chemical feed
systems (any systems related to pumping plant). Include all setpoints or interlocks of all
existing processes and mechanical equipment.
D. Complete photo documentation of observed conditions, deficiencies, and constraints.
E. Provide red-line markups to update the following key drawings as needed to represent
existing conditions (Refer to Exhibit E for drawing set):
1. Mechanical Plan and Elevation, Drawings 6200-G-06.01, 6200-G-07.01 to 7.06
2. Elevator, Plumbing, Emergency Generator, Drawings 6200-G-08.01 to 8.02
3. Heating and Ventilating, Drawings 6200-G-09.01 to 9.12
4. Electrical General, 12kV Outdoor Substation, Site plan, and Indoor Drawings 6200-G-
10.01 to 10.18, 6200-G-11.01 to 11.06, 6200-G-12.01, 6200-G-13.01 to 13.16
F. Coordinate with District Operations staff to document operational constraints.
G. Summarize findings in an Existing Conditions TM.
Assumptions:
* Allow ten (10) workdays for District to review draft documents.
* Two (2) meetings with District to coordinate with Operations and Maintenance and
Engineering staff.
* Address District comments in track changes version of draft and provide with final
version.
Proposer Deliverables:
* Draft Existing Conditions TM
* Final Existing Conditions TM
RFP NO. 524-26-01
Page 8
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
Task 2 - Power Reliability Improvements
The Proposer shall:
A. Coordinate with PG&E to identify PG&Es existing protection schemes and any impacts
on reliability of service to the Moraga RWPP, including effect of seasonal or Public
Safety Power Shutoff (PSPS) settings.
B. Perform a transient motor starting study to evaluate alternatives to address the voltage
drop issue during pump startup, including VFDs, dynamic reactive power compensation,
operational controls (timing and sequencing of starts), and any other feasible
alternatives.
C. Evaluate alternatives to improve power reliability with consideration for planned and
unplanned PG&E outages or service disruptions.
D. Conduct meetings with District stakeholders while completing the task, including
leading workshops both before and after the findings of this task are summarized in the
TM.
E. Summarize findings in Power Reliability TM including scope of work, design criteria,
equipment layouts, single-line diagram, cost estimates (AACE Class 4), and
implementation schedules for alternatives and the recommended project based on the
alternatives analysis.
Assumptions:
* Allow ten (10) workdays for District to review draft documents and five (5) workdays
for District to review draft PowerPoint presentations.
* Address District comments in track changes versions of drafts and provide with final
version.
* Four (4) meetings with District to coordinate with Operations and Maintenance and
Engineering staff.
* One (1) conceptual alternatives workshop with District stakeholders prior to preparing
the Draft Power Reliability Improvements TM.
* One (1) alternatives evaluation and project recommendation workshop with District
stakeholders after the Draft Power Reliability Improvements TM is issued.
* Alternatives analysis should consider how alternatives best meet the project purpose
as well as other factors including maintenance and reliability, environmental and
community, and capital and operating costs.
Proposer Deliverables:
* Draft and Final Annotated Outline for Power Reliability Improvements TM
* Draft and Final PowerPoint for each workshop
* Draft and Final Minutes for each workshop
* Draft Power Reliability Improvements TM
* Final Power Reliability Improvements TM
* ETAP/ SKM model project files
RFP NO. 524-26-01
Page 9
Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services
Task 3 - Electrical Systems Reliability and Safety Assessment
The Proposer shall:
A. Evaluate existing facility electrical equipment and support systems, including
transformers, MCCs, battery backup, and emergency generator.
B. Evaluate alternatives to improve power reliability with respect to planned and
unplanned PG&E outages or service disruptions.
C. Develop recommendations for new equipment or the rehabilitation of equipment
including cost and justification. Obtain quotes from vendors for new equipment or
pump rehabilitation and determine construction costs.
D. Summarize findings in an Electrical System Reliability and Safety Assessment TM
including scope of work, design criteria, equipment layouts, single-line diagrams, cost
estimates (AACE Class 4) and implementation schedules for alternatives and
recommended improvements.
Assumptions:
* Allow ten (10) workdays for District to review draft documents and five (5) workdays
for District to review draft PowerPoint presentations.
* Address District comments in track changes version of draft and provide with final
version.
* Four (4) meetings with District to coordinate with Operations and Maintenance and
Engineering staff.
* One (1) workshop with District stakeholders after the Draft Electrical Power Reliability
and Safety Assessment TM is issued.
* Alternatives analysis should consider how alternatives best meet the project purpose
as well as other factors including maintenance and reliability, environmental and
community, and capital and operating costs.
Proposer Deliverables:
* Draft and Final Annotated Outline for Electrical System Reliability and Safety
Assessment TM
* Draft and Final PowerPoint for each workshop
* Draft and Final Minutes for each workshop
* Draft Electrical System Reliability and Safety Assessment TM
* Final Electrical System Reliability and Safety Assessment TM
Task 4 - Pumps, HVAC, and Mechanical Systems Assessment
The Proposer shall conduct a mechanical condition assessment of Moraga RWPP and
develop a recommended project.
Conduct Mechanical Condition Assessment:
A. Coordinate with the Proposer's electrical engineer for all tasks.
RFP NO. 524-26-01
Page 10

With GovernmentContracts, you can:
Follow Healthcare Facility Architect-Engineer (A-E) MATOC - California Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 11/27/2026
General Information Due Date: December 3, 2026 Opening Time: 2:00 PM Published Date:
City of Stockton
Bid Due: 12/03/2026
Follow Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA
TRANSPORTATION, DEPARTMENT OF
Bid Due: 12/02/2026
Bid Number: 27XX-X Bid Title: RFP - Community Facilities District and Landscape and
City of Ceres
Bid Due: 12/16/2026