| Location: | Florida |
|---|---|
| Posted: | Jun 1, 2026 |
| Due: | Jul 9, 2026 |
| Agency: | City of Tallahassee |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-074-26-RM |
| Publication URL: | To access bid details, please log in. |
Project Description: Project is to procure by the materials listed below. Materials should follow the specifications given in the drawings/documentation in Attachment C-Specifications.
• 1 - 115kV Steel Deadend Line Terminal
• 3 - 115kV Steel Bus Support, Single Phase, Low
• 1 - 115kV Steel Bus Support, Single Phase, High
• 3 - 115kV Steel, CCVT Support, Single Phase, Low
• 1 - 115kV Steel Bus Support, Three Phase, High
• 1 - 115kV Steel, Breaker Disconnect Switch Support
• 2 - 115kV Steel CT Support, Three Phase

With GovernmentContracts, you can:
...BUILDING 4 AND SERVICE FEEDERS BACK TO UTILITY TRANSFORMER. ADD BREAKER TO CONNECT ...
Volusia County Schools
Bid Due: 10/15/2026
...FEEDERS BACK TO UTILITY TRANSFORMER. ADD BREAKER TO CONNECT EM1 TO MDP. 2. ...
Volusia County Schools
Bid Due: 10/15/2026
...required for the modernization of the main breaker and fourteen (14) low-voltage switchboards...
City of Tampa
Bid Due: 10/13/2026
..., warranties, bonds, and incidentals required for the modernization of the main breaker ...
City of Tampa
Bid Due: 10/13/2026