54-TJK-01-PR36058 On Call Seeding Mulching Proposal 26

Location: North Carolina
Posted: Jun 24, 2026
Due: Jul 15, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • F - Natural Resources and Conservation Services
Publication URL: To access bid details, please log in.
  • Proposals
  • Attachment Preview

    Proposal No. 54-TJK-01-PR36058
    1
    June 24, 2026
    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    REQUEST FOR PROPOSAL
    DATE AND TIME OF BID OPENING: JULY 15, 2026 AT 2:00 P.M.
    BID PROPOSAL NO.:
    54-TJK-01-PR36058
    WBS ELEMENT NOS.:
    VARIOUS
    COUNTIES:
    BERTIE, CAMDEN, CHOWAN, CURRITUCK, DARE, GATES,
    HERTFORD, HYDE, MARTIN, NORTHAMPTON,
    PASQUOTANK, PERQUIMANS, TYRRELL, AND
    WASHINGTON – DIVISION 1
    LOCATION:
    VARIOUS PRIMARY AND SECONDARY ROADS
    TYPE OF WORK:
    ON CALL ANNUAL SEEDING AND MULCHING
    DATE OF AVAILABILITY:
    SEPTEMBER 1, 2026
    COMPLETION DATE:
    AUGUST 31, 2027
    PRE-QUALIFICATION MANDATORY
    Proposal No. 54-TJK-01-PR36058
    2
    June 24, 2026
    PROPOSAL
    FOR THE CONSTRUCTION OF
    BID NO. 54-TJK-01-PR36058 IN BERTIE, CAMDEN, CHOWAN, CURRITUCK, DARE, GATES,
    HERTFORD, HYDE, MARTIN, NORTHAMPTON, PASQUOTANK, PERQUIMANS, TYRRELL, AND
    WASHINGTON COUNTIES – DIVISION 1, NORTH CAROLINA
    JUNE 24, 2026
    DEPARTMENT OF TRANSPORTATION,
    RALEIGH, NORTH CAROLINA
    The Bidder has carefully examined the location of the proposed work to be known as Contract No. 54-TJK-01-
    PR36058; has carefully examined the plans and specifications, which are acknowledged to be part of the proposal,
    the special provisions, the proposal, the form of contract, and the forms of contract payment bond and contract
    performance bond; and thoroughly understands the stipulations, requirements and provisions. The undersigned
    bidder agrees to bound upon his execution of the bid and subsequent award to him by the Department of
    Transportation in accordance with this proposal to provide the necessary contract payment bond and contract
    performance bond within fourteen days after the written notice of award is received by him. The undersigned Bidder
    further agrees to provide all necessary machinery, tools, labor, and other means of construction; and to do all the
    work and to furnish all materials, except as otherwise noted, necessary to perform and complete the said contract in
    accordance with the 2024 Standard Specifications for Roads and Structures by the dates(s) specified in the Project
    Special Provisions and in accordance with the requirements of the Engineer, and at the unit or lump sum prices, as
    the case may be, for the various items given on the sheets contained herein.
    The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the
    work and required labor to construct and complete State Highway Contract No. 54-TJK-01-PR36058 for the unit or
    lump sum prices, as the case may be, bid by the Bidder in his bid and according to the proposal, plans, and
    specifications prepared by said Department, which proposal, plans, and specifications show the details covering this
    project, and hereby become a part of this contract.
    The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for
    Roads and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into
    and made a part of this contract; that, except as herein modified, all the construction and work included in this contract
    is to be done in accordance with the specifications contained in said volume, and amendments and supplements
    thereto, under the direction of the Engineer.
    If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer
    or such other person as may be designated by the Secretary to sign for the Department of Transportation. The
    conditions and provisions herein cannot be changed except over the signature of the said Contract Officer or Division
    Engineer.
    The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as
    the basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any
    item or portion of the work as may be deemed necessary or expedient.
    An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease
    in the unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.
    Proposal No. 54-TJK-01-PR36058
    3
    TABLE OF CONTENTS
    PROJECT SPECIAL PROVISIONS - GENERAL
    General
    Pre-Qualification
    General Contractors Licensing Requirements
    Contract Time for ID/IQ
    Work Order Assignment (Multiple Awards) for ID/IQ
    Mobilization and Liquidated Damages for ID/IQ
    Emergency Mobilization ID/IQ
    Renewal of Contract (CPI Price Adjustment) for ID/IQ
    Dispute Resolution Process for ID/IQ
    Intermediate Contract Time Number 1 and Liquidated Damages
    Intermediate Contract Time Number 2 and Liquidated Damages
    Intermediate Contract Time Number 3 and Liquidated Damages
    Non-Exclusive Contract
    Award of Contract
    Basis of Award
    Quantities Estimated
    Multi-Year Maintenance Contracts
    Bond Requirements
    Performance Guarantee
    Insurance
    Progress and Prosecution
    Traffic Control and Work Zone Safety
    Flaggers
    Safety Vests
    Prompt Payment
    Payment and Retainage
    Minority Business Enterprise and Women Business Enterprise
    PROJECT SPECIAL PROVISIONS - ROADWAY
    Description
    Erosion Control
    Notification of Work
    Inspection of Work
    Stabilization Requirements
    Mobilization
    Seeding and Mulching
    Repair Seeding
    Permanent Soil Reinforcement Mat
    Safety
    Supervision by Contractor
    Equipment
    Miscellaneous
    STANDARD SPECIAL PROVISIONS
    Availability of Funds – Termination of Contracts
    Authority of the Engineer
    Minimum Wages
    On-The-Job Training
    June 24, 2026
    PAGE NO.
    5
    5
    5
    6
    6
    7
    7
    7
    8
    8
    8
    8
    9
    9
    10
    10
    10
    10
    10
    11
    11
    11
    12
    12
    12
    12
    13
    PAGE NO.
    23
    23
    23
    23
    24
    24
    24
    30
    30
    31
    31
    31
    32
    PAGE NO.
    33
    33
    33
    34
    Proposal No. 54-TJK-01-PR36058
    4
    Work Zone Signing
    NCDOT General Seed Specification for Seed Quality
    Plant and Pest Quarantines
    Bankruptcy
    Subletting of Contract
    Responsibility for Damage Claims
    Debarment Statement
    Default of Contract
    No Major Contract Items
    No Specialty Items
    Subsurface Information
    Utility Conflicts
    Traffic Signs & Mailboxes
    Driveways and Private Property
    Posted Weight Limits
    Cooperation between Contractors
    Cooperation with State Forces
    Outsourcing Outside the USA
    Title VI and Nondiscrimination
    INSTRUCTIONS TO BIDDERS
    Preparation and Submission of Traditional Paper Bids
    Opening of Bids
    BID SUBMITTAL PACKAGE
    Cover Sheet
    Contract Bid Form
    Contractor Information
    Federal Employer Identification Number
    List of MBE/WBE Subcontractors
    List of Equipment
    Contractor's Work Experience and References
    Execution of Bid Non-Collusion, Debarment and Gift Ban Certification
    Bid Submittal Package Checklist
    June 24, 2026
    36
    36
    38
    38
    38
    39
    39
    39
    39
    39
    39
    39
    39
    40
    40
    40
    40
    40
    40
    PAGE NO.
    47
    48
    PAGE NO.
    1
    2
    3
    4
    5
    6
    7
    8
    16
    Proposal No. 54-TJK-01-PR36058
    5
    June 24, 2026
    PROJECT SPECIAL PROVISIONS - GENERAL
    GENERAL
    This contract is for miscellaneous erosion control work on primary and secondary roads in Bertie, Camden,
    Chowan, Currituck, Dare, Gates, Hertford, Hyde, Martin, Northampton, Pasquotank, Perquimans, Tyrrell, and
    Washington Counties in Division 1. The Contractor will also be responsible for matting, repair seeding,
    fertilization, and traffic control as directed by the Engineer. The Contractor is to provide all equipment, labor and
    material.
    All materials and workmanship shall be in accordance with the following:
    The Project Special Provisions, Project Standard Provisions, most current Standard Special Provisions, Manual of
    Uniform Traffic Control Devices (MUTCD), Provisions contained in the applicable Sections of the North Carolina
    Department of Transportation’s 2024 Standard Specifications for Roads and Structures and Drawings contained in
    the applicable sections of the North Carolina Department of Transportation’s 2024 Roadway Standard Drawings
    shall apply.
    The published volume entitled North Carolina Department of Transportation, Standard Specifications for Roads
    and Structures, with all amendments and supplements thereto, is by reference incorporated into and made a part of
    this contract; that, except as herein modified, all the construction and work included in the contract is to be done in
    accordance with the specifications contained in said volume, and amendments and supplements thereto, under the
    direction of the Engineer.
    The Contractor shall keep himself fully informed of all Federal, State, and local laws, ordinances, and regulations,
    and shall comply with the provisions of Section 107 of the Standard Specifications.
    These manuals may be found at the following websites: http://mutcd.fhwa.dot.gov/ and
    https://connect.ncdot.gov/resources/Specifications/Pages/2024-Specifications-and-Special-Provisions.aspx
    PRE-QUALIFICATION
    Any prospective bidder that wishes to bid as a prime contractor on this project shall be prequalified as a “Bidder” or
    “PO Prime Contractor”.
    Prospective bidders shall obtain prequalification approval at least two (2) business days prior to any letting in which
    they intend to submit a bid. It is recommended that the prospective bidder file all required statements and
    documents with the State Prequalifications Engineer no less than four (4) weeks before a given letting. A bid shall
    not be opened unless all prequalification requirements have been met by the bidder and have been found acceptable
    by the Engineer.
    Information regarding prequalification can be found at:
    https://connect.ncdot.gov/business/Prequal/Pages/default.aspx.
    Prior to performing the work, the prime contractor and/or subcontractor(s) shall be prequalified in the work code(s)
    which are identified as work items in the prime contractor’s construction progress schedule that they will complete
    themselves. Any contractor identified as working outside their expertise may be considered in default of contract.
    GENERAL CONTRACTORS LICENSING REQUIREMENTS
    A General Contractors license is not required to bid or perform work on this project.
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL
    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.