| Location: | South Carolina |
|---|---|
| Posted: | Apr 10, 2026 |
| Due: | May 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work to be done consists of furnishing all equipment and performing all labor necessary to replace the existing valves and sluice gates as shown on the Drawings. Materials for the valves and gates replacement to be provided by the City of Aiken. Temporary bypass pumping of both the diversion and pump wet wells shall be provided during the replacement of the sluice gates utilizing the above ground piping for the onsite bypass pumping above the diversion wet well.

With GovernmentContracts, you can:
...Ad Title: Beaufort Executive Airport Eight-Bay T-Hangar and 50x50 Box Hangar Design Build... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...Project ID: Title: Beaufort Executive Airport Eight-Bay T-Hangar and 50x50 Box Hangar Design ...
Beaufort County
Bid Due: 7/28/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026