| Location: | South Carolina |
|---|---|
| Posted: | Apr 10, 2026 |
| Due: | May 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work to be done consists of furnishing all equipment and performing all labor necessary to replace the existing valves and sluice gates as shown on the Drawings. Materials for the valves and gates replacement to be provided by the City of Aiken. Temporary bypass pumping of both the diversion and pump wet wells shall be provided during the replacement of the sluice gates utilizing the above ground piping for the onsite bypass pumping above the diversion wet well.

With GovernmentContracts, you can:
...Project Name: Fence and coded gates install for water plant Agency/Owner: City of ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
...elevated water storage tank, foundation, yard piping, related appurtenances, chain link fencing with ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...Road Greenville, South Carolina 29607 (Gate B). In order for you get into ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/17/2026
...: Improvements include installing security fencing, security gates and limited interior renovations in ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026