| Location: | South Carolina |
|---|---|
| Posted: | Apr 10, 2026 |
| Due: | May 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work to be done consists of furnishing all equipment and performing all labor necessary to replace the existing valves and sluice gates as shown on the Drawings. Materials for the valves and gates replacement to be provided by the City of Aiken. Temporary bypass pumping of both the diversion and pump wet wells shall be provided during the replacement of the sluice gates utilizing the above ground piping for the onsite bypass pumping above the diversion wet well.

With GovernmentContracts, you can:
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... Engineer ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026
...to the regional design guidelines. Project Details: http://www.bcdcog.com Print Ad ... Telephone: n/a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/30/2026
...Project Location: Kirkwood Park, 192 Stowers Road, Camden, SC Project Delivery Method: Design-Build... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/16/2026
...project consists of ACM removal in accordance to project design. Documents May Be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/06/2026