| Location: | South Carolina |
|---|---|
| Posted: | Apr 10, 2026 |
| Due: | May 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work to be done consists of furnishing all equipment and performing all labor necessary to replace the existing valves and sluice gates as shown on the Drawings. Materials for the valves and gates replacement to be provided by the City of Aiken. Temporary bypass pumping of both the diversion and pump wet wells shall be provided during the replacement of the sluice gates utilizing the above ground piping for the onsite bypass pumping above the diversion wet well.

With GovernmentContracts, you can:
...Ad Title: Replace 3 Ton Heat Pump Purchasing Agent/Entity: Department of Corrections Ad ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...Project ID: 2110-RFP Title: Diesel Pump for Wastewater Treatment Plant Addenda: 0 Release ...
City of Rock Hill
Bid Due: 6/23/2026
...Project Name: Perry Road Pump Station Upgrade Agency/Owner: Grand Strand Water and Sewer ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/29/2026
...(Crockett Atlas Road and Versch Lock Pump Station) Issue Date & Time 5/11/2026 ...
City of Columbia
Bid Due: 6/11/2026