| Location: | South Carolina |
|---|---|
| Posted: | Apr 10, 2026 |
| Due: | May 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24-25-227 |
| Publication URL: | To access bid details, please log in. |
This project consists of a bridge replacement on Hunters Run road in Edgefield, South Carolina. The existing bridge is to be replaced with a prefabricated modular steel bridge system, Big R Modular Steel Bridge. Work to include new bridge abutments on support piles, approach slabs, wing walls, repairing and armoring of the creek embankments.

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Grand Strand Water... & ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/29/2026
...: manager@e2ofsc.com Telephone: 843-374-8030 Description: Construction of a 100,000-gallon steel... Construction Cost Range: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...: Columbia Project Delivery Method: Design-Bid-Build Construction Cost Range: n/a Prime Contractor..." guidelines ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/16/2026