Rubb Shelter Inspections

Location: Texas
Posted: Aug 5, 2025
Due: Aug 19, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 54 - Prefabricated Structures and Scaffolding
Solicitation No: W50S77-25-Q-0002
Publication URL: To access bid details, please log in.
Follow
Rubb Shelter Inspections
Active
Contract Opportunity
Notice ID
W50S77-25-Q-0002
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
NATIONAL GUARD BUREAU
Office
W7N2 USPFO ACTIVITY TXANG 147
General Information
  • Contract Opportunity Type: Special Notice (Original)
  • Original Published Date: Aug 05, 2025 03:39 pm CDT
  • Original Response Date: Aug 19, 2025 04:00 pm CDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Sep 03, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: No Set aside used
  • Product Service Code: 5410 - PREFABRICATED AND PORTABLE BUILDINGS
  • NAICS Code:
    • 332311 - Prefabricated Metal Building and Component Manufacturing
  • Place of Performance:
    Houston , TX 77034
    USA
Description

The 147th ATKW, Texas Air National Guard, intends to sole source inspection services of currently owned Aircraft Shelters. The repairs will consist of: The contractor shall provide all management, tools, supplies,equipment, and labor necessary to operate and maintain the required inspections. Structures aredesigned to require a minimal amount of maintenance over the life of the structures. The inspectionshould be performed bi-annually or after the structures are exposed to winds or snow loads closeto the designed limit of the structure.



2.1. INSPECTION REQUIREMENTS



2.1.1. Check fabric tension around perimeter by pushing out fabric by hand from the inside of the structure at shoulder height. PVC should snap back sharply when released if correctly tensioned. Tighten as required. Removal of bird netting may be required.



2.1.2. Check tension rods along foundation for equal tension and lock nuts set. Tighten as required as required to equal tension in all rods in each bay area. Tighten any loose lock nuts as needed. Removal of bird netting may be required.



2.1.3. Check shackles connecting tension rods to foundation for loose pins or missing safety wire. Tighten pins as required and replace missing safety wire. Removal of bird netting may be required.



2.1.4. Check that the PVC covering is tensioned around the entire perimeter, Doors and vents. Reattach any loose PVC. Removal of bird netting may be required.



2.1.5. Check for any holes or rips in the PVC cover. Damage should be repaired according to the PVC repair procedure. Removal of bird netting may be required.



2.1.6 Check for areas of damaged galvanization or corrosion. Remove any corrosion and cover with a zinc rich coating. Removal of bird netting may be required.



2.1.7. Spot check a sample of various bolts for tightness. Tighten as required. A325 bolts are tightened according to the turn-of –the-nut method given in the A.I.S.C steel manual, 16th edition.This states that A325 bolts less than 4 diameters in length must be tightened an additional 1/3 turn past snug tight. Note A325 bolts in structure are less then 4 diameters long. All non A325 bolts are snug tight. Removal of bird netting may be required.



2.1.8. Check wind bracing cables for proper tensioning. They should be sag free. If cables arefound to have sag, tighten a minimum of two full turns past the point where all the slack has been taken out of the cable. Removal of bird netting may be required.



2.1.9. Check node restraint cables for proper tension. Node restraint cables should be free of sagand snug tight. Removal of bird netting may be required.



2.1.10. STEELWORK INSPECTION - Check steelwork for missing or damagedcomponents. Replace or repair any damaged components found. Removal of bird netting may be required.





The 147th ATKW, Texas Air National Guard, intends to sole source the inspections as the current assets were purchased from Rubb Inc. and must be repaired, inspected, and maintained by the company to ensure the warranty for the shelters stays intact. Work by any other vendor would void any warranty for the shelters. FAR 13.106-1(b)(1) soliciting from one responsible source.










Attachments/Links
Contact Information
Contracting Office Address
  • KO FOR TXANG DO NOT DELETE 14667 SNEIDER ST BLDG 12
  • HOUSTON , TX 77034-5586
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Aug 05, 2025 03:39 pm CDTSpecial Notice (Original)

Related Document

Jul 9, 2025[Combined Synopsis/Solicitation (Original)] Tower Ring Down System Upgrade
Jul 23, 2025[Combined Synopsis/Solicitation (Updated)] Tower Ring Down System Upgrade
Jul 31, 2025[Combined Synopsis/Solicitation (Updated)] Tower Ring Down System Upgrade
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.