| Location: | South Carolina |
|---|---|
| Posted: | Jan 26, 2026 |
| Due: | Feb 24, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2020-CP0011 |
| Publication URL: | To access bid details, please log in. |
The Work will include: demolition; clearing and grubbing; excavation; extensive water/sanitary sewer utility relocation; installation of approx. 880 ft of concrete pipe, 1,980 ft of box culvert, and 28 structures; concrete and asphalt paving/milling of streets, curbs, and sidewalks; erosion control; traffic control; certified as-built drawings, and more. Non-mandatory pre-bid meeting 2/4/26.

With GovernmentContracts, you can:
...include excavation of any footings and foundations and removal of all demolition debris ...
Richland County
Bid Due: 10/13/2026
...prefabricated bridge system and demolition and removal of an existing wooden bridge. Excavation...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/24/2026
...include excavation of any footings and foundations and removal of all demolition debris ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/13/2026
...of a new prefabricated bridge system and demolition and removal of an existing ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/24/2026