SCOPE OF WORK
This project includes the analysis of existing operational conditions, intersection control evaluation, concept
development, construction plans and specifications and construction engineering services for the Broadway,
Toole, and California Intersection project. The initial scope for this contract will include an Intersection
Control Evaluation and Alternative Concept Development, as described below. The design phase will then be
contracted after the preferred concept is chosen. Once the plans and specifications are refined, the construction
engineering services contract will be contracted.
PROJECT GOALS
The project goals include three categories: Safety Improvements, Operational Benefits, and Access
Management. Project specific safety improvement goals include safer pedestrian and cyclist crossings and
reducing vehicle speeds. Project specific operational benefits include integration with future Broadway
corridor improvements and congestion mitigation. Project specific access improvements include pedestrian
and cyclist access, traffic traveling westbound on Broadway wanting to turn right onto Toole, and traffic
traveling northbound on California wanting to turn left onto Broadway. The safety,