| Location: | New Mexico |
|---|---|
| Posted: | Sep 2, 2025 |
| Due: | Sep 9, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA940125Q0032 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Air Force has a requirement to replace the current AD storage unit with one of similar size. The storage unit should
have steel reinforced sandwich designed for the door to prevent warping and prevent weather intrusion. In addition, there
should be locking handles to prevent unauthorized entry. The doors should support up to 500lbs each. The floors should be
a galvanized steel construction that can make direct contact with the ground without the risk of water damage.
Required specs:
- Unit size: 16' x 24' (8' Walls)
- Doors: 4' x 6'7" Double Shed Door (8')
- Roof: 24 Lin Ft Ridge Vent; 4 Ea 2x4 Skylight
- Interior: 192 Lin Ft Shelving - 24" deep
- Vents: 2 Ea 16"x8" Wall Vent - White; 24 Ea Floor Track Vent Screen (continued below)
- 2x4 Skylight
- Shelving - 24" deep

With GovernmentContracts, you can: