| Location: | North Carolina |
|---|---|
| Posted: | Aug 18, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 345-08/18/2025 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 345-08/18/2025 |
| Project Title: | RFQ - Richardson Water Treatment Plant Sulfuric Acid Tank Replacement |
| Description: | Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and permitting services of tank replacement, improvements to the Sulfuric Acid Room, and associated equipment at the Richardson Water Treatment Plant. The Richardson Water Treatment Plant (RWTP) was built in 2009 and currently produces about 7 million gallons of drinking water per day (mgd). The Richardson WTP Sulfuric Acid Room and associated equipment (Tanks, Pumps, Chemical Coating System, and Chemical Feed Lines) were installed during the initial plant construction completed in 2009. Each aspect of the system is in the various stages of deterioration up-to and including end-of-life. |
| Opening Date: | 9/18/2025 2:00 PM |
| Posted Date: | 8/19/2025 |
| Status: | Open |
| Department: | CAPE FEAR PUBLIC UTILITY AUTHORITY |
|
Solicitation Number
*
345-08/18/2025
|
Department
CAPE FEAR PUBLIC UTILITY AUTHORITY
|
Status Reason
Open
|
|
|
Opening Date
2025-09-18T14:00:00.0000000
|
Posted Date
*
2025-08-18T19:00:25.0000000Z
|
Commodity Code
Civil engineering
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
No pre-submittal conference to be held
|
||
|
Description
Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and permitting services of tank replacement, improvements to the Sulfuric Acid Room, and associated equipment at the Richardson Water Treatment Plant. The Richardson Water Treatment Plant (RWTP) was built in 2009 and currently produces about 7 million gallons of drinking water per day (mgd). The Richardson WTP Sulfuric Acid Room and associated equipment (Tanks, Pumps, Chemical Coating System, and Chemical Feed Lines) were installed during the initial plant construction completed in 2009. Each aspect of the system is in the various stages of deterioration up-to and including end-of-life.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Bid Number: 27-1082 Bid Title: On-Call Professional Services - Civil Site Engineering Development... ...
City of Durham
Bid Due: 9/29/2026
...REQUEST FOR QUALIFICATIONS (RFQ) ENGINEERING SERVICESFor Clyde, Canton, Waynesville Water... Interconnect Design, Bid ...
Waynesville town
Bid Due: 9/30/2026
...of qualified engineering firms to provide planning, design, construction, and consulting services... Solicitation ...
State Government of North Carolina
Bid Due: 10/02/2026
...Memorial Park - Phase 2 Owner: City of Raleigh, North Carolina Engineering Services ...
State Government of North Carolina
Bid Due: 10/08/2026