| Location: | Hawaii |
|---|---|
| Posted: | Dec 17, 2025 |
| Due: | Jan 16, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes, but is not limited to:
- Renovation of existing warehouse space into laboratory facilities per attached drawings (Sheets A1-A6).
- Installation of plumbing, electrical, and split air-conditioning systems.
- Installation of solar photovoltaic and battery storage system sized to sustain lab operations independently during power outages.
- Design, permit, and installation of a septic system with all necessary approvals.
- Connection to existing County water and 100-amp supplemental electrical service.
Amendment
11/17/2025
Extending bid close date and re-scheduling pre-bid meeting.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
Drawings-Olinda Lab 3.pdf
|

With GovernmentContracts, you can:
...on Kauai, Hawaii. Water within the walls of a fuel storage tank can ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
..., Hawaii. Water within the walls of a fuel storage tank can lead ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
..., Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), Underground ...
DEPT OF DEFENSE
Bid Due: 6/22/2026
...for power and communications. Utilities: Necessary utility infrastructure hookups including water, sanitary... as ...
DEPT OF DEFENSE
Bid Due: 7/06/2026