Project Description:
Qty = 6
Anker SOLIX F3000 Portable Power Station or equivalent or better
Required Specifications
▪︎ Unit must be portable and self-contained
▪︎ Integrated battery management and safety protections
▪︎ Display panel showing battery level and output status
▪︎ Suitable for powering multiple devices simultaneously (minimum 4)
Power & Capacity
▪︎ Minimum Output Power: 3600W
▪︎ Minimum Battery Capacity: 3072Wh
Input (Charging)
▪︎ AC Charging:120V, 15A (max)
*Charging time: 3 hours or less
▪︎ Standard AC charging cable included
Output
▪︎ Minimum of 4 AC outlets (NEMA 5-20R or equivalent)
▪︎ AC Output: 120V, 60Hz
oMinimum 2400W continuous output
▪︎ Surge Capacity:
oMinimum 4800W
Additional Outputs (Preferred but not required)
▪︎ USB-A ports
▪︎ USB-C ports (up to 100W preferred)
Mechanical Specifications
▪︎ Maximum Dimensions: 26 x 12 x 15 inches
▪︎ Maximum Weight: 100 lbs
Qty = 6
Anker SOLIX BP3000 Expansion Battery or equivalent or better
Expansion battery
Capacity: 3072 Wh
| Download |
|
Plans
Specifications
|
Addendums/Amendments
|

With GovernmentContracts, you can:
...Day Date Time Area ADD/ / AMD GCA# Project 07/29/26 9:00am Guam 36394-379 ...
General Contractors Association
Bid Due: 7/29/2026
...Follow REPLACE AC SYSTEM B3417, JBPHH-HI Active Contract Opportunity Notice ID W50SLF-26-R-A002...
DEPT OF DEFENSE
Bid Due: 7/30/2026
...Day Date Time Area ADD/ / AMD GCA# Project 07/30/26 3:30pm Oahu 36420-103 ...
General Contractors Association
Bid Due: 7/30/2026
...services for designated Government-owned Environmental Control Units (ECUs) and Air Conditioners (ACs). To...
DEPT OF DEFENSE
Bid Due: 7/28/2026